| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹3.6 L+₹13,603.43 (3.94%)Accepted-Finance | L2 | Accepted-Finance L2 Bidder | |
| 3 | L3₹3.7 L+₹24,382.67 (7.07%)Accepted-Finance | L3 | Accepted-Finance L3 Bidder | |
| 4 | L4₹4.1 L+₹69,159.11 (20.0%)Accepted-Finance | L4 | Accepted-Finance L4 Bidder | |
| 5 | L5₹4.2 L+₹79,606.83 (23.1%)Accepted-Finance | L5 | Accepted-Finance L5 Bidder |
Tender Value
₹4.6 L
EMD Value
₹9,200
Closing Date
25 Sept 2020, 4:00 pmClosed
Executive Engineer
Soura Srinagar
CONSTRUCTION OF CHAIN LINK FENCING AROUND UNDER GROUND SUMP AT ZAWOORA WATER SUPPLY NETWORK ON TAILS ENDS OF SRINAGAR CITY ON WESTERN AND SOUTHERN END UNDER LANGUISHING PROGRAMME (JKIDFC).
2020_PHE_104612_2
e-NIT No.21/WSMP of 09/2020 dated 16-09-2020
Open Tender
Civil Works
Item Rate
10 days
Zawoora
Please refer Tender documents.
2 documents required · 2 mandatory
₹700
Ex.Engineer WSMP Div
₹9,200
Yes
6 Oct 2020
17 Sept 2020
26 Sept 2020
17 Sept 2020
25 Sept 2020
17 Sept 2020
Amount
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres
Providing and laying dry stone soling in foundation trenches hand packed and consolidated by hand ramming (Nallah).
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: i. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: i. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. i. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) V Wall / Counter forts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. i. Thermo-Mechanically Treated bars of grade Fe-500D or more. (For Thrust Block).
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Centering and shuttering including strutting, propping etc. and removal of form work for:
i. Foundations, footings, bases for columns. (Raft)
ii. Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. (V Wall).
12mm Cement plaster of mix: i. 1 : 4 ( 1 cement : 4 fine sand)
iProviding and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in- charge. i. Made of G.I. wire of dia 4 mm
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. i. Two or more coats on new work
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. i. Welded
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge. i. 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern.
Carriage of material from source upto site of work by mechanical transport including loading, unloading and stacking.
i. Cement and Steel for an avg. lead of 30Kms
ii. Sand for an avg. lead of 12Kms
iii. 40mm aggregate for an avg. lead of 5Kms.
iv. Stone soling for an avg. lead of 6Kms..
Naseer Ahmad Bhat
ASHIQ HUSSAIN SHAH
M/S MEHRAJ UDIN SHAH
M/S SHOWKAT FAROOQ MIR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .