Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.6 L+₹44,948.27 (6.26%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹9.4 L+₹2.2 L (30.9%)Rejected-Finance | L3 | Rejected-Finance Higher Bid | |
| 4 | Rejected-Technical | - | Rejected-Technical Prime Machinaries agreement not found. | |
| 5 | Rejected-Technical | - | Rejected-Technical Prime Machinaries agreement not found. |
Tender Value
₹8.2 L
EMD Value
₹16,315
Closing Date
28 May 2026, 6:00 pmClosed
Executive Engineer, Cooch Behar Highway Division
Office of the Executive Engineer, Cooch Behar Highway Division, Cooch Behar
Nazirhat Bazar (5th km of Burirhat Salmara road) to Shyamganj B.S.F. Camp Road from 0.00 Km to 2.50 Km, Urgent Bituminous Patch Repairing Work, under Cooch Behar Highway Division in the district of Cooch Behar.
2026_WBPWD_5013875_2
NIT/01E/2026-27/EECHD/PWRD
Open Tender
CIVIL WORKS
Percentage
30 days
Cooch Behar
Please refer Tender documents.
5 documents required · 5 mandatory
₹16,315
Yes
27 Jul 2026
11 May 2026
1 Jun 2026
14 May 2026
28 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by any suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be followed by seal coat of either Type A or Type B as per Technical Specification Clause 508 for Rural Roads of MORD. (with pakur variety stone chips and VG-30 packed bitumen @ 1.46 kg/m² EXcluding cost of tack coat using cationic emulsion MS grade @0.25 kg/m² ) (PAKUR VARIETY STONE MATERIALS)
[With Stacking] | 2,812.5 | Sqm | 139.91 | ₹3,93,496.88 |
| 2 | Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (with pakur variety stone dust mixed with grit @0.006 m³/m²) (PAKUR VARIETY STONE MATERIALS)
II By Manual Means
With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.)
[With Stacking] | 2,812.5 | Sqm | 47.42 | ₹1,33,368.75 |
| 3 | Repairing pot-holes and making up small depressions with ramming or power rolling including screening, cleaning chips or metals and washing, drying as necessary and heating the chips or metal where necessary, cutting pot holes to regular shapes with vertical edges, cleaning the disintegrated materials, heating matrix and applying tack coat (including sides), finishing the top of repaired surface levelled with adjoining area, including cost and carriage of stone aggregates and matrix, excluding cost of applying tack coat. [Tack coat is to be considered separately]. With premixed Chips or Bajrees with 54 kg of bitumen per m3 of loose net volume of stone chips using concrete mixer machine. (The payment is to be made on the basis of loose net volume of stone materials consumed in the work). Using Mobile HMP (Light duty). Using Pakur Variety Stone Materials and Packed VG-30 Bitumen.
22.40 mm stone chips
11.20 mm stone chips
[With stacking] | 11.72 | Cum | 5,017.84 | ₹58,809.08 |
| 4 | Tack Coat : . Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and bricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). . (i) On Bituminous surfaces (Using Bitumen emulsion at the rate of 0.20 to 0.30 kg per sqm.) | 3,000 | Sqm | 10.18 | ₹30,540 |
| 5 | Bamboo Pile Walling made of 6.5cm to 7.5cm dia bamboo (in single line) driven about half-length into ground at very close spacing of 30cm c/c side by side, with stout stays at an interval of 90cm fixed with bamboo post of length 1.25m driven 1m below G.L., 3 nos. of half split bamboo runner of same dia fitted and fixed with nails etc. and lining exposed portion with sheets made from cut drums (empty bitumen drums) fitted and fixed with a lap width of 100 mm at each joint, complete as per direction including the cost of drum sheets and including the cost of nails, wires etc.
(iii) With bamboos of length above 2.50m and upto 3.00m | 26 | Mtr. | 448 | ₹11,648 |
| 6 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. | 1,393 | Bags | 14.81 | ₹20,630.33 |
| 7 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD. | 0.8 | Ha | 44,978 | ₹35,982.4 |
| 8 | Add GST@18% on Rs . 684475.44 i.e. total amount over item no1 to 7 | - | % percentage | 18 | - |
| 9 | Add Labour Welfare Cess @1% of Rs. 807681.02 i.e. total amount of Item No. 1 to 8 | - | % percentage | 1 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
Tendernotice_2.pdf
PDF • 2.22 MB
BOQ_5081756.xls
BOQ • 0.36 MB
Corrigendum.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .