| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.6 LAccepted-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | ₹48.6 L | L1 | Accepted-AOC ACCEPT |
| 2 | L2₹49.1 LRejected-AOC 4 107 EDAYARPALAYAM KUNIYAMUTHUR COIMBATORE 641 008 | COIMBATORE | TAMIL NADU | 641008 | ₹49.1 L | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | M RAMARAJ L1 | JAYALAKSHMI BUKDERS L2 |
|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | |||||
| 1.01 | First Depth | 315 | cum | 220 ₹69,300 | 225 ₹70,875 |
| 1.02 | Plinth Beam | 53 | cum | 110 ₹5,830 | 115 ₹6,095 |
| 2.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 26 | cum | 5,962.25 ₹1,55,018.5 | 5,962.25 ₹1,55,018.5 |
| 3.00Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | |||||
| 3.01 | Footings Centering | 185 | sqm | 1,068 ₹1,97,580 | 1,068 ₹1,97,580 |
| 3.02 | Plinth Beam Centering | 187 | sqm | 356 ₹66,572 | 400 ₹74,800 |
| 3.03 | Column Centering | 370 | sqm | 1,417 ₹5,24,290 | 1,417 ₹5,24,290 |
| 4.00Providing and laying in position Standardised Concrete Mix M-25 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 350Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone sand (M- Sand) but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS standards. | |||||
| 4.01 | Foundation and Basement | 90 | cum | 9,238.5 ₹8,31,465 | 9,238.5 ₹8,31,465 |
Tender Value
₹60 L
EMD Value
₹60,000
Closing Date
16 Dec 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of compound wall at Nehru play ground Gandhipuram,ward no.83 central zone.
2025_MAWS_629881_2
e58/2025-TWO COVER
Open Tender
Civil Works
150 days
Coimbatore corporation
As per Tender Documents
5 documents required · 5 mandatory
₹0
₹60,000
23 Mar 2026
8 Dec 2025
17 Dec 2025
8 Dec 2025
16 Dec 2025
8 Dec 2025
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
First Depth
Plinth Beam
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Footings Centering
Plinth Beam Centering
Column Centering
Providing and laying in position Standardised Concrete Mix M-25 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 350Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone sand (M- Sand) but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS standards.
Foundation and Basement
Ground Floor
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT
Foundation and Basement Wall
Ground Floor Wall
Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Wall Plastering
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
Supplying and laying in flooring with fully polished Sinthetic Grey colour Granite stone of 20mm thick (average) of 4' X 2' in size laid over base layer of cementmortar 1:3 (one cement and three Plastering sand) - 20 mm thick and applying cement slurry &pointed with white cement and colour pigments to the colour of stones and polished neatly as directed by the deparmental officers
Painting two coats of newly plastered wall surface with ready mixed Cement paint of first quality and of approved colour over a priming coat including preparing the surface, clean removal of dirt and including necessary plaster of paris putty wherever required etc., complete complying with standard specification.
Painting two coats for Exterior surface with approved Exterior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification.
Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
Stucco Plastering 12 mm thick using blue granite chips of size 10 mm and below over a base plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)), 12mm thick,including cost and conveyance of all materials to site etc,complete as per standard specification.
JAYALAKSHMI BUKDERS (BID ID -1535121)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
building_compressed.pdf
Tender Documents • 0.47 MB
BOQ_753400.xls
BOQ • 0.33 MB
ITB.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid