| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-Finance COLABA MUMBAI | ₹14.8 L | L1 | Accepted-Finance LOWEST AND ACCEPTED |
| 2 | L2₹16.0 LRejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | ₹16.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹16.4 LRejected-Finance | ₹16.4 L | L3 | Rejected-Finance L3 |
| 4 | L4₹17.0 LRejected-Finance COLABA MUMBAI | ₹17.0 L | L4 | Rejected-Finance L4 |
| 5 | L5₹17.8 LRejected-Finance | ₹17.8 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Monarch Enterprises L1 | Escon Elevators Pvt Ltd L2 | Veer High Tech Solution L4 | Shree Elevator Engineering Co. L3 | PHOENIX ELEVATOR INDIA PRIVATE LIMITED L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Comprehencive maintenance and repairs (Routine, preventive , breakdown) to electrically operated passengers/ Goods elevator for safety and optimal performance by skilled technician engaged by OEM or their accredited / authorised agencies / other OEM with regular interval perodical inspections- forthnightly / Monthly / quaterly and Annual lift maintenance tasks and prompt replacement of worn or damaged components as essential of and repairs including replacement of minor defective parts of Lift :- (a) 05 (Five) Nos of capacity 08/13 Passengers Lift(Make : M/S Monarch) in Bldg Gomti, Godavari, Cauvery, Saraswati, Sabarmati. Suitable to serve G+05 upper floors (b) 01 (One) No of capacity 2000 kg Goods Lift(Make : M/S Monarch) in Bldg No NS- 128 suitable to serve G+02 upper floors Note for Item Ser No 1 to 1.04 (i) Labour Cost of all the maintenance,repairs and including replacement of components and parts that too for the specific lifts as indicated therein to keep the lifts in perfect serviceable condition shall be deemed to be included in the quoted rate of the contractor. The contractor shall be responsible for handing over the lifts in serviceable condition at the time of completion of works. The payment for replacement of unforeseen parts / components expenditure upto Rs 1500/ not part of schedule A is deemed to be included in the quoted rate. (ii) MoU OEM or their accredited/authorised agencies/other OEM shall be produced by contractor to GE before issue of work order. (iii) Unserviceable parts beyond Rs 1500 required to make lift serviceable shall be measured and paid seperetaly however labour component is deemed to be included in unit rate quoated. Any defect noticed during maintenance period shall be attended immediately without any inconvenience to users. Contractor shall ensure proper maintenance and servicing of following compartments for smooth functioning of lift: (a) Mechanical components- (i) Door rollers, tracks, and sensors: - ensure smooth and safe operation of the elevator doors. (ii) Ropes or belts and pulleys: - responsible for lifting the cabin and require replacement if they show signs of wear or damage. (iii) Gears: Essential for traction lifts, drive the car up and down the shaft. (iv) Guide shoes and rails: Help keep the elevator car aligned and prevent swaying during travel. (v) Buffers: Act as safety devices to cushion the impact in case of a free fall (b) Electrical and control components (i) Control panel: Used by passengers to select floors, manage operations, and interface with the lift's functionalities. (ii) Sensors and switches: Detect the lift's position and activate safety mechanisms, such as overload protection. (iii) Wiring and connectors: Crucial for the lift's power supply and control systems. (iv) Emergency systems: Include alarms and backup power systems to ensure continued operation in the event of outages or malfunctions. (v) Lighting fixtures: Ensure the cabin is well-lit for safety and comfort (c) Hydraulic components (for hydraulic lifts) (i) Hoses and tubes: Transport hydraulic fluid and may need replacement due to wear and tear. (ii) Seals and gaskets: Prevent fluid leaks and maintain proper pressure within the system. (iii) Hydraulic pump and fluid: Regular maintenance and replacement are necessary to prevent performance degradation. (d) Safety devices (i) Brakes: Crucial for stopping and holding the elevator cabin securely. (ii) Overload sensors: Trigger alarms if the lift's weight capacity is exceeded. (iii) Speed governor:- ensure safety device that engages the brakes if the elevator starts to run too fast. (iv) Safety interlocks:-Ensure Prevent the elevator from moving if the doors are not properly closed | ||||||||
| 1.01 | Forthnightly lift maintenance tasks includes -
(i) Lubricating moving parts and hinges — Apply appropriate lubrication to moving parts such as pulleys, bearings, and hinges to reduce friction and maintain smooth operation.
(ii) Inspecting and cleaning door mechanisms — Check the door opening and closing mechanisms, including rollers, tracks, and sensors, for any obstructions, damage, or misalignment. Clean them to remove dust or debris that may affect proper functioning.
(iii) Testing emergency communication systems — Test the intercom or emergency communication system to ensure clear communication between passengers and the monitoring station in case of an emergency | 132 | Each Job | 1,320 ₹1.7 L | 1,160 ₹1.5 L | 1,790 ₹2.4 L | 1,300 ₹1.7 L | 1,290 ₹1.7 L |
| 1.02 | Monthly lift maintenance tasks includes
(i) Inspecting and cleaning the hoistway and pit area — Thoroughly inspect the hoistway and pit area for debris, oil leaks, or any signs of damage. Clean the area to maintain a safe and clean environment.
(ii) Testing and adjusting door closing and leveling — Check the door closing speed and leveling accuracy to ensure they are functioning properly. Make necessary adjustments to maintain proper door operation and alignment.
(iii) Checking and cleaning elevator shaft lighting — Inspect and clean the lighting fixtures in the lift shaft to ensure adequate illumination for maintenance and emergency situations | 66 | Each Job | 2,060 ₹1.4 L | 1,960 ₹1.3 L | 2,000 ₹1.3 L | 1,965 ₹1.3 L | 3,120 ₹2.1 L |
| 1.03 | Quarterly lift maintenance tasks includes
(i) Inspecting and testing safety features — Check the emergency brakes, overspeed governors, and other safety devices to ensure they are functioning correctly. Test their operation as per the manufacturer’s guidelines.
(ii) Testing and recalibrating elevator sensors and switches — Test the door sensors, limit switches, and other sensors to ensure accurate detection and smooth operation. Recalibrate if necessary.
(iii) Inspecting and adjusting door locks and latches — Check the door locks and latches for proper engagement and alignment. Adjust or replace any faulty components as needed | 18 | Each Job | 4,780 ₹86,040 | 4,665 ₹83,970 | 5,200 ₹93,600 | 5,120 ₹92,160 | 6,950 ₹1.3 L |
| 1.04 | Annual lift maintenance tasks includes
(i) Comprehensive inspection of all mechanical and electrical components — Conduct a thorough inspection of the lift’s mechanical and electrical systems, including motor, cables, brakes, control panels, and wiring. Identify any signs of wear, damage, or potential issues that require attention.
(ii) Testing and certification of safety systems — Perform a comprehensive safety inspection, including load testing, emergency stop functionality, and other critical safety checks. Obtain the necessary certifications and documentation.
(iii) Verifying compliance with relevant regulations and standards — Ensure that the lift system complies with all applicable codes, regulations, and industry standards. Make any necessary upgrades or modifications to meet the requirements. | 6 | Each Job | 11,680 ₹70,080 | 11,530 ₹69,180 | 11,300 ₹67,800 | 11,035 ₹66,210 | 11,440 ₹68,640 |
| 2.00 | Supply & fixing in repairs travelling cable (Shaft wiring) in hoist way upto lower limit switch with PVC insulated 12 core flat/round type with multistranded copper conductor 1100 Volts grade of size 0.75 Sqmm & 1 Sqmm for earthing conforming to IS including thimbless suspended type freely move with car cabin up and down movements between ground and upper floors including necessary proper connectiion with Mid way junction for control of all floor hall push button assembly, limit switches, terminal switches, fireman switches etc duly earthed at all points and other connection required in circuit suitable for passenger Lift complete all as specified and directed | 120 | RM | 185 ₹22,200 | 200 ₹24,000 | 179 ₹21,480 | 215 ₹25,800 | 240 ₹28,800 |
| 3.00 | Taking out existing unserviceable main hoist steel wire rope after disconnecting from counter weight pulley and car cabin and supply and fix new steel wire rope 13mm dia, ungalvanised, 8/19 construction conforming to IS-14665 including making necessary connection with weight, pully and car cabin with clamps, nuts, bolts washers etc Make : Usha Martine or equivalent as approved by the GE, complete all as specified and directed. | 120 | RM | 540 ₹64,800 | 536 ₹64,320 | 665 ₹79,800 | 625 ₹75,000 | 700 ₹84,000 |
| 4.00 | Taking out unserviceable Governor Steel wire rope after disconnection from car cabin and in lieu supply and fixing new steel wire rope 8mm dia, ungalvanised, 8/19 construction, including making necessary proper connection with machine room and shaft pit with clamps, nuts, bolts, washers complete all as specified and directed Make : USHA MARTIN or equivalent as approved by the GE. | 90 | RM | 430 ₹38,700 | 589 ₹53,010 | 425 ₹38,250 | 415 ₹37,350 | 480 ₹43,200 |
| 5.00 | Supply and fixing in repairs over speed Governor complete tripping arrangemant mechanism 300 mm dia pulley with ball bearing complete suitable for 08 mm governor rope suitable for passenger lift having different speed complete all as specified and directed .Make : As per OEM Recommendation | 1 | Each | 28,400 ₹28,400 | 44,600 ₹44,600 | 38,900 ₹38,900 | 27,690 ₹27,690 | 36,822 ₹36,822 |
| 6.00 | Supply and fixing in repairs new landing operating panel (LOP) assembley with and including digital car position indicator, direction signal with 2mm thick stainless steel face plate of size and shape to match with existing, also reconnecting with control /electric system and testing etc suitable for KONE/MONARCH/Escon/OTIS/Johnson make lifts, 8 /13 passenger lift and 1500/2000/3000 Kg Goods lift capacity, installed at Mo MB Ghatkopar upto (G+05 Floors), complete all as specified and directed.
Make : As per OEM Recommendation | 1 | Each | 4,100 ₹4,100 | 4,050 ₹4,050 | 3,980 ₹3,980 | 4,744 ₹4,744 | 4,000 ₹4,000 |
Updated dates
Tender Value
₹14.9 L
EMD Value
₹29,900
Closing Date
28 May 2026, 6:00 pmClosed
CWE (SUBS) MUMBAI
Commander Works Engineer Subs NCHC Powai Bhandup Post Office Mumbai 400 078
COMPREHENSIVE MAINT AND REPAIR OF PASSENGER LIFTS IN RESIDENTIAL AREA AND BUILDING NO NS-128 AT MO (MB) GHATKOPAR UNDER CWE (SUBS) MUMBAI
2026_MES_762846_1
8436/E8
Open Tender
Civil Works
330 days
GHATKOPAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (NW) BHANDUP
₹29,900
16 Jun 2026
30 Apr 2026
30 May 2026
30 Apr 2026
28 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for Daily Maintenance, Manning & Operation 01 No lift of capacity 08 Passanger suitable to serve G+05 Upper floors Installed at- Sea Hawk Bldg. in two shifts (Each shift of 08 Hours) operated by one lift operator per shift on all days/ holidays and all type of weather /climatic conditions, providing rescue to the trapped person, maintaining the lift, connected equipments and accessories in serviceable condition including upkeeping lift room , surrounding area clean and tidy during the operation period. | 670 | Per Shift 01 Lift | - | - |
| 2 | M&L for Daily Maintenance, Manning & Operation 02 Nos lifts of capacity 08 Passangers Suitable to serve G+07 Upper Floors Installed at-Sea Eagle -III Building in two shifts (Each shift of 08 Hours) operated by one lift operator per shift on all days/ holidays and all type of weather /climatic conditions, providing rescue to the trapped person, maintaining the lift, connected equipments and accessories in serviceable condition including upkeeping lift room , surrounding area clean and tidy during the operation period, also Manning & Operation of Lift in case of failure of commercial supply by running of DG Set installed within the vicinity meant for lift supply.
. | 670 | Per Shift 02 Lift | - | - |
| 3 | M&L for Daily Maintenance, Manning & Operation 02 Nos lifts of capacity 08 Passangers Suitable to serve G+08 Upper Floors Installed at-Sea Eagle -IV Building in two shifts (Each shift of 08 Hours) operated by one lift operator per shift on all days/ holidays and all type of weather /climatic conditions, providing rescue to the trapped person, maintaining the lift, connected equipments and accessories in serviceable condition including upkeeping lift room , surrounding area clean and tidy during the operation period, also Manning & Operation of Lift in case of failure of commercial supply by running of DG Set installed within the vicinity meant for lift supply. | 670 | Per Shift 02 Lift | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tenderdocus.pdf
Tender Documents • 0.89 MB
BOQ_854520.xls
BOQ • 1.05 MB
Download all tender documents and submit your bid