Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.8 L
EMD Value
₹26,000
Closing Date
21 Apr 2026, 10:00 amClosed
XEN PHE DIVISION SHOPIAN
PHE Division Shopian
Shifting of PHE Utilities falling within the ROW of Khudpora Memender road from Aharbal Sedow junction upto FP site of Palpora Bemnipora
2026_PHE_307544_2
03/JSDS 2026-27
Open Tender
Civil Works - Water Works
Percentage
XEN PHE DIVISION SHOPIAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹400
XEN PHE DIVISION SHOPIAN
₹26,000
21 Apr 2026
9 Apr 2026
21 Apr 2026
9 Apr 2026
21 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling D.I pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge: | |||||
| 1.1 | Upto 150 mm diameter. | - | Mtr | 109.66 | - |
| 1.2 | Above 150 mm diameter. | - | Mtr | 121.66 | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | - | cum | 479.3 | - |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
: | - | cum | 256.85 | - |
| 4 | Laying in position centrifugally cast (spun) iron S&S or flanged pipes (excluding cost of pipe) | - | Qlts. | 270.1 | - |
| 5Providing push-on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket. | |||||
| 5.1 | 200 mm dia pipes | - | each | 221.9 | - |
| 5.2 | 150 mm dia pipes | - | each | 150.35 | - |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations etc. in layers not exceeding 20 cm in depth, consolidating each depositedlayer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | - | cum | 218.4 | - |
stage.html
html • 0.03 MB
finance_997708.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
Enit3.pdf
Tender Documents • 1.02 MB
BOQ_997708.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .