Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹31.8 LAccepted-AOC CAMP VILLAGE DEVGAI POST KUDARI SHAHDOL MP | NOWROZABAD | UMARIA | MADHYA PRADESH | 484110 | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical KUNJ BHAVAN JARHI BHATGAON COLLIERY BHATGAON SURGUJA CHHATTISGARH 497235 | SURAJPUR | CHHATTISGARH | 497235 | - | Rejected-Technical Rejected as L-2 | |
| 3 | Rejected-Technical CAMP DHANPURI NO 01 DHANPURI DIST SHADOL MP | DHANPURI | SHADOL | MADHYA PRADESH | 484114 | - | Rejected-Technical Rejected as L-3 | |
| 4 | Rejected-Technical AMLAI COLLIERY ANUPPUR MADHYA PRADESH 484114 | AMLAI | ANUPPUR | MADHYA PRADESH | 484114 | - | Rejected-Technical Rejected as L-4 |
Tender Value
₹47.1 L
EMD Value
₹58,900
Closing Date
26 Dec 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Mining)
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Construction of 48 Nos. RCC Isolation stoppings for Sectionalization of Panels VIBE11 in VI Bottom Seam and VE10, VE11 in V Seam at Damini UG mine of Sohagpur Area
2023_SECL_295966_1
SECL/SGP/ET/23-24/642 dt13/12/2023
Open Tender
Civil Works - Others
Item Rate
270 days
Damini UG Mine
As per NIT
8 documents required · 8 mandatory
₹58,900
13 Jan 2024
13 Dec 2023
28 Dec 2023
13 Dec 2023
26 Dec 2023
14 Dec 2023
13 Dec 2023 - 22 Dec 2023
Amount
Item Description/ Heading Part (A) labour Cost
Cleaning/removal of malma /muck from UG sump and stacking within 50m distance . 48 X 8.00m. X 4.60m. X 0.20m. = 353.28m3
Groove cutting in soft stone In roof – 32X(5.60m.x0.30m.X0.15 m.) =8.06m3 In floor – 16X(5.60m.x0.30m.X0.15 m.) = 4.03m3 Total = 12.09 m3
Groove cutting in coal/shale - In floor – 32X(5.60m.x0.30m.X0.30 m.) = 16.13m3 In floor – 16X(5.60m.x0.30m.X0.30 m.) = 8.06m3 In side – 2X32 (3.00m.x0.30m.X0.50 m.)= 28.80m3 In side – 2X16 (2.80m.x0.30m.X0.50 m.)= 13.44m3 Total = 66.43m3
Reinforced cement concrete (1:2:4) in Wall /roof ceiling of air crossing/stopping (any thickness)in u/g(Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials). Wall – 32X 5.60m. X 3.45.m X 0.30m.= 185.47m3 16X 5.60m. X 3.25m. X 0.30m.= 87.36m3 Total = 272.83m3
Centring, shuttering, finishing and reinforce- Ment including cutting, bending, placing in position and binding and strutting, propping etc complete. Wall – 2 X 32X 4.60m. X 3.00m.= 883.20 m2 2 X 16X 4.60m. X 2.80m.= 412.16 m2 Total = 1295.36m2
Cement concrete/PCC(1:2:4) in foundation /plinth/flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials). In floor- 32X4.60m. X 1.00m.X0.05m.) = 7.36 m3 In floor- 16X4.60m. X 1.00m.X0.05m.) = 3.68 m3 Water tank- 4X 2.20m. X 0.70m. X0.10m.= 0.62 m3 Total = 11.66 m3
6 mm thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete (exclusive cost of materials) Wall – 32X 4.60m. X 3.00m.= 441.60 m2 16X 4.60m. X 2.80m.= 206.08 m2 In sides of galleries- 32X2 X 3.00m. X 1.00m. = 192.00 m2 16X2 X 2.80m. X 1.00m. = 89.60 m2 In roof- 32X 4.60m. X 1.00 m = 147.20 m2 16X 4.60m. X 1.00 m = 73.60 m2 TOTAL = 1150.08 m2
Loading of all kind building materials in to tub at Inc. mouth- a) Stone chips - 253.20 m³ b) Sand - 135.23 m³ c) Cement - 64.80 m³ d) Steel rod(12) - 1.18 m³ TOTAL = 454.41 m³
Unloading of all kind building materials in to tub at destination
Lead for transportation/carriage of all kinds building materials by manually in u/g. Upto 75m
Transportation of all kind of building material from surface to u/g through haulages with tram ing and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface.
Pushing of tub for every 30m after free pushing of first 30.00m upto 480m. (480-30=450/30= 15*4.33=64.95/ m3)
Part-B Material Cost supply and stacking of building materials Cement
Stone chips(20mm)
Steel rod(12mm)
Total impact of GST for the purpose of CTC
JEEWAN SINGH RAUTELA
SURENDRA KUMAR SINGH
UDAY RAJ SINGH
stage.html
html • 0.04 MB
techsummary_306541.pdf
PDF • 0.13 MB
finsummary_306541.pdf
PDF • 0.08 MB
AOC642.pdf
PDF • 1.12 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .