| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC 39 19 NAINI STREET ATHUR SALEM 636 102 | SALEM | TAMIL NADU | 636102 | L1 | Accepted-AOC L 1 IS ACCEPTED | |
| 2 | L2₹8.4 L+₹9,174 (1.11%)Rejected-Finance | L2 | Rejected-Finance REJECT |
| Sl No | Description | Qty | Unit | V S ASSOCIATES L1 | Blue Tech Infra Structure Private Ltd L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged Reinforced Cement concrete surface including dismantling clearing away and carefully stacleing materials useful for reused for any thinlenes of wass etc.,Complete as per standard specifications | 3 | M3 | 4,308 ₹12,924 Lowest | 4,325 ₹12,975 |
| 2.00 | Dismantling the existing damaged Plain Cement concrete surface including dismantling clearing away and carefully stacleing materials useful for reused for any thinlenes of wass etc.,Complete as per standard specifications | 64 | M3 | 486 ₹31,104 Lowest | 495 ₹31,680 |
| 3.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock requiring blasting inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including clearing leveling the site etc., complete complying with standard specification (TNDSS No. 23, 24) | 46 | M3 | 107 ₹4,922 Lowest | 125 ₹5,750 |
| 4.00 | Cement concrete 1:4:8 mix (One cement four sand and Eight metal) using 40mm ISS hard broken granite stone jelly for foundation and flooring including dewatering wherever necessary and laid in layers of not exceeding 15cm thick to required thickness including all labour charges ect complete as per standard specification | 14 | M3 | 5,342 ₹74,788 Lowest | 5,355 ₹74,970 |
| 5.00Centering for soffits of RCC slabs plane surface including strutting upto 3.00m height using mild steel of size 90cmx60cmx10 gauge fitted with MS angle of size 25mmx25mmx3mm laid over silver oak (CW) joists of size 10cmx6cm spaced at 90cm c/c and supported by causrina props of 10cm to 13cm dia spaced at 75cm c/c complying with standard specification | |||||
| 5.01 | a) Side Wall without Strutting | 351 | M2 | 482 ₹1,69,182 Lowest | 495 ₹1,73,745 |
| 5.02 | b) Culvert Slab ( With strutting) | 11 | M2 | 1,067 ₹11,737 Lowest | 1,125 ₹12,375 |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two M Sand and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 70 | M3 | 6,714 ₹4,69,980 Lowest | 6,725 ₹4,70,750 |
| 7.00 | Reinforced Cement Concrete 1:1.5:3 (one cement, one and half M Sand and three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 3 | M3 | 9,153 ₹27,459 Lowest | 9,175 ₹27,525 |
| 8.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 300 | M3 | 90 ₹27,000 Lowest | 95 ₹28,500 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
17 Jul 2025, 3:00 pmClosed
THE COMMISSIONER ERODE CITY MUNICIPAL CORPORATION
246,MEENAKSHI SUNDHARANAR SALAI,ERODE
Construction of Strom water Drain and Culvert at Radhakrishnan 2nd Cross (CC Road) in Ward No-21
2025_MAWS_581981_1
E1-4907-2024-05 ERODE CITY MUNICIPAL CORPORATION
Open Tender
Civil Works
Works
90 days
ERODE CITY MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
₹10,000
29 Sept 2025
15 Jul 2025
17 Jul 2025
15 Jul 2025
17 Jul 2025
15 Jul 2025
Amount
Dismantling the existing damaged Reinforced Cement concrete surface including dismantling clearing away and carefully stacleing materials useful for reused for any thinlenes of wass etc.,Complete as per standard specifications
Dismantling the existing damaged Plain Cement concrete surface including dismantling clearing away and carefully stacleing materials useful for reused for any thinlenes of wass etc.,Complete as per standard specifications
Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock requiring blasting inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including clearing leveling the site etc., complete complying with standard specification (TNDSS No. 23, 24)
Cement concrete 1:4:8 mix (One cement four sand and Eight metal) using 40mm ISS hard broken granite stone jelly for foundation and flooring including dewatering wherever necessary and laid in layers of not exceeding 15cm thick to required thickness including all labour charges ect complete as per standard specification
Centering for soffits of RCC slabs plane surface including strutting upto 3.00m height using mild steel of size 90cmx60cmx10 gauge fitted with MS angle of size 25mmx25mmx3mm laid over silver oak (CW) joists of size 10cmx6cm spaced at 90cm c/c and supported by causrina props of 10cm to 13cm dia spaced at 75cm c/c complying with standard specification
a) Side Wall without Strutting
b) Culvert Slab ( With strutting)
Plain Cement Concrete 1:2:4 (one cement, two M Sand and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Reinforced Cement Concrete 1:1.5:3 (one cement, one and half M Sand and three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Blue Tech Infra Structure Private Ltd (BID ID -1405616)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_695457.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .