Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 CrAdmitted-Finance | ₹4.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.6 Cr+₹71.8 L (14.8%)Admitted-Finance | ₹5.6 Cr+₹71.8 L (14.8%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S RAM NARAYAN CONTRACTOR L2 | dayanand contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Cutting and burning cactus and thorny bushes and sarkanda. | 12,192 | Per m² | 2 ₹24,384 Lowest | 2 ₹24,384 Lowest |
| 2.00 | Uprooting Juli Flora/ sarkanda, pahari kikar or arrows upto 0.50m depth below ground level | 822.96 | Per m² | 6.75 ₹5,554.98 Lowest | 6.75 ₹5,554.98 Lowest |
| 3.00 | De-watering by pumping water to maintain desired level including cost of POL/ power consumption etc complete
10 to 19 HP | 65.56 | Per hour | 525 ₹34,419 Lowest | 525 ₹34,419 Lowest |
| 4.00 | Silt clearance/ Removal of blown sand/ berm unloading undressed with combined lead up to 50m for lined canal section for FSD more than 2m | 5,139.39 | Per m³ | 90 ₹4,62,545.1 | 70.4 ₹3,61,813.06 Lowest |
| 5.00 | Add Extra over above item for additional lead upto 200 meters. | 5,262.73 | Per m³ | 23.5 ₹1,23,674.16 Lowest | 23.5 ₹1,23,674.16 Lowest |
| 6.00 | Extra for slush or daldal that which will support man's weight | 1,408.19 | Per m³ | 30 ₹42,245.7 Lowest | 30 ₹42,245.7 Lowest |
| 7.00 | Earth work excavation in ordinary soil for main canal and branches having discharge 10 cumecs & above: Kassi work undressed. | 3,062.68 | Per m³ | 45 ₹1,37,820.6 Lowest | 45 ₹1,37,820.6 Lowest |
| 8.00 | Extra on earthwork for laying in 15 to 25 cm layears including dressing and watering as per specifications | 135.69 | Per m³ | 14 ₹1,899.66 Lowest | 14.1 ₹1,913.23 |
| 9.00 | Ramming of earth work in layers by wooden or irom rammer as per specifications to attain a density 90% of maximum dry density. | 135.69 | Per m³ | 20 ₹2,713.8 Lowest | 20 ₹2,713.8 Lowest |
| 10.00 | Dressing of earthwork | 2,926.99 | Per m³ | 5 ₹14,634.95 Lowest | 5 ₹14,634.95 Lowest |
Tender Value
₹5.1 Cr
EMD Value
₹10.3 L
Closing Date
5 Mar 2026, 6:00 pmClosed
Project Director PMU (RWSRPD) and Chief Engineer
Office of the Project Director PMU (RWSRPD) and Chief Engineer Water Resources (North) Hanumangarh
Special Repair and Renovation of Cross Regulator at tail end of IGF RD 671.000 (Masitanwali) (P332)
2026_WRDAS_538404_1
PMU_NIB_17_2025-26
Open Tender
Civil Works
Item Rate
90 days
Hanumangarh
As per bid documents
3 documents required · 3 mandatory
₹10,000
Executive Engineer Regulation division Ist
₹10.3 L
Yes
Hanumangarh
19 Mar 2026
13 Feb 2026
6 Mar 2026
13 Feb 2026
5 Mar 2026
13 Feb 2026
13 Feb 2026 - 20 Feb 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and burning cactus and thorny bushes and sarkanda. | 12,192 | Per m² | - | - |
| 2 | Uprooting Juli Flora/ sarkanda, pahari kikar or arrows upto 0.50m depth below ground level | 822.96 | Per m² | - | - |
| 3 | De-watering by pumping water to maintain desired level including cost of POL/ power consumption etc complete
10 to 19 HP | 65.56 | Per hour | - | - |
| 4 | Silt clearance/ Removal of blown sand/ berm unloading undressed with combined lead up to 50m for lined canal section for FSD more than 2m | 5,139.39 | Per m³ | - | - |
| 5 | Add Extra over above item for additional lead upto 200 meters. | 5,262.73 | Per m³ | - | - |
| 6 | Extra for slush or daldal that which will support man's weight | 1,408.19 | Per m³ | - | - |
| 7 | Earth work excavation in ordinary soil for main canal and branches having discharge 10 cumecs & above: Kassi work undressed. | 3,062.68 | Per m³ | - | - |
| 8 | Extra on earthwork for laying in 15 to 25 cm layears including dressing and watering as per specifications | 135.69 | Per m³ | - | - |
| 9 | Ramming of earth work in layers by wooden or irom rammer as per specifications to attain a density 90% of maximum dry density. | 135.69 | Per m³ | - | - |
| 10 | Dressing of earthwork | 2,926.99 | Per m³ | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BIDDOCP332updated.pdf
Tender Documents • 4.13 MB
BOQ_959580.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .