Tender Value
Refer Docs
Closing Date
1 Sept 2026, 12:00 pm4d left
MR L.K. Dewangan(DFLT)
MMSSK
794-03 General AMC Servicing & Fabrication & Civil Works Second E-Tender (Non Authorized)
198163
794-03 General AMC Servicing & Fabrication & Civil Works Second E-Tender (Non Authorized)
OPEN TENDER
Goods
RATE CONTRACT
1 days
MMSSK
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
13 documents required · 13 mandatory
Maa Mahamaya Shahkari Shakkar Karkhana Maryadit Ambikapur(MMSSKM)
Goods
MR L.K. Dewangan(DFLT)
OPEN TENDER
RATE CONTRACT
OPEN TO ALL
MMSSK
SUGAR FACTORY
ADMIN_OFFICE
15
1
No
168
198163
1 Sep, 2026 12:00:00 PM IST
1 Sep, 2026 2:00:00 PM IST
22 Aug, 2026 8:00:00 PM IST
794-03 General AMC Servicing & Fabrication & Civil Works Second E-Tender (Non Authorized)
794-03 General AMC Servicing & Fabrication & Civil Works Second E-Tender (Non Authorized)
0.00 INR
RTGS/NEFT (OFFLINE)
No
2
1 Sep, 2026 12:30:00 PM IST
AS PER NIT
AS PER NIT
AS PER NIT
2000.00 INR
9d 16h 4m
13 documents required · 13 mandatory
₹2,000
Exempted
22 Aug 2026
22 Aug 2026
1 Sept 2026
22 Aug 2026
1 Sept 2026
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-100, RPM-1450/1000, STATOR, INSULATION-F. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-120, RPM-1450/1000, STATOR, INSULATION-F. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-150, RPM-1450/1000, STATOR, INSULATION-F. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-120, RPM-600, ROTOR, INSULATION-F. . TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-120, RPM-1000, ROTOR, INSULATION-F. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-200, RPM-738, STATOR, INSULATION-F TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB 2 YEARS EXPERIENCE SUGAR FACTORY Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-268, RPM-2900, STATOR, INSULATION-F TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-177, RPM-1000, STATOR, INSULATION -F TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-177, RPM-1000, ROTOR, INSULATION-F TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-0.5, RPM- 1450/1000, STATOR , INSULATION-B TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-1.0-3, RPM- 1450/1000, STATOR, INSULATION- B. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-5-7.5, RPM- 1450/1000, STATOR, INSULATION- B. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-10-15, RPM- 1450/1000, STATOR, INSULATION- B. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-12.5, RPM-2900, STATOR, INSULATIO-B TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-20, RPM- 1450/1000, STATOR, INSULATION-F TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-25, RPM-1450/1000, STATOR, INSULATION-F. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-30,RPM-1450/1000, STATOR, INSULATION-F. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-40,RPM-1450/1000, STATOR, INSULATION-F. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-50, RPM-1450/1000, STATOR, INSULATION-F. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-60, RPM-1450/1000, STATOR, INSULATION-F. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE SQ. CAGE MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP-75, RPM-1450/1000, STATOR, INSULATION-F. TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
3 PHASE EXHAUST FAN REWINDING, REPAIRING AND MAINTENANCE, 18 RPM-900 TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
MOTOR REWINDING, REPAIRING AND MAINTENANCE, HP- 0.5, (THRUSTOR MOTOR) TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
EXHAUST FAN REWINDING, REPAIRING AND MAINTENANCE, 12 RPM-900 TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
SUBMERSIBLE PUMP REPAIRING AND MAINTENANCE, 03 TO 05 H.P, RPM- 2900 TERMS & CONDITIONS 1 - REPLACEMENT BUSHING AND IPMLLOR AS PER REQUIREMETN 2- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - VARUNA Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
SUBMERSIBLE MOTOR REWINDING, AND MAINTENANCE, 03 TO 05 H.P, RPM- 2900 TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - MERATHAN/SEIMENS/ABB Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
SUBMERSIBLE MOTOR , MAINTENANCE, 03 TO 05 H.P, RPM- 2900 TERMS & CONDITIONS 1-REPLACEMENT BUSING AND BEARING ON REQUARE .2- MOTOR FINALIZE AFTER LOAD TRIAL . 3- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 4- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - VARUNA Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
SUBMERSIBLE MOTOR REWINDING, AND MAINTENANCE, 7.5 TO 10 H.P, RPM- 2900 TERMS & CONDITIONS 1-SUPER ENAMIL COPPER WIRE MUST TO BE STANDARD QUALITY. 2- INSULATING PAPER TAPE & VARNISH (DR BACK) STANDARD QUALITY. 3- MOTOR TERMINAL LEAD MUST BE GLASS BRAIDED WIRE WITH PROPERLY GLASS TAPING & WINDING .4- OLD SCRAP MATERIAL REVINDER PROPERTY 5- MOTOR FINALIZE AFTER LOAD TRIAL . 6- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 7- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - VARUNA Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
SUBMERSIBLE MOTER REPAIRING AND MAINTENANCE, 7.5 TO 10 H.P, RPM- 2900 TERMS & CONDITIONS 1-REPLACEMENT BUSING AND BEARING ON REQUARE 2.MOTOR FINALIZE AFTER LOAD TRIAL . 3- MOTOR BEARING / BUSHESH REPLACEMENT PERIOR INSTRUCTION APPROVAL 4- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - VARUNA Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
SUBMERSIBLE PUMP REPAIRING AND MAINTENANCE, 7.5 TO 10 H.P, RPM- 2900 TERMS & CONDITIONS 1 - REPLACEMENT BUSHING AND IPMLLOR AS PER REQUIREMETN 2- ONE CRUSHING SEASON UNDER GUARANTEE/ WARANTEE MOTOR MAKE - VARUNA Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY
BALANCING OF CANE CHOPPER ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF CANE LEVELLER ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF FIBRIZER ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF I.D. FAN ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF F.D. FAN ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF S.A. FAN ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF HOT AIR BLOWER FAN ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF COLD AIR BLOWER FAN ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF DUST CATCHER BLOWER FAN ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF A- C/F MACHINE ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF B - C/F MACHINE ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF C C/F MACHINE ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BALANCING OF MILL DC MOTOR BLOWER FAN ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORY
BOILER & ECONOMISSOR, SUPER HEATER TUBE THICKNESS TESTING COMPLETE JOB - BOILER TUBE THICKNESS TESTING FROM APPROVED I.B.R AGENCY AS INDIAN BOILER ACT BOILER CAPACITY - 65 TON/LTR WORKING PRESSURE - 67 KG/CM2 HEATING SURFACE - 2872 M2 BOILER & ECONOMISSER THICKNESS TESTING ,MINIMUM WORK EXPERIENCE 5 YEAR IN SUGAR FACTORYTECH
DISMENTLING , ERECTION,(GRINDING ,ALIGNMENT .FITTING AND WELDING) OF FLAT RUNNER,SIZE - 65X8 MM CANE CARRIER,LONG RAKE , INTER RAKE , AS PER EXISTING RUNNER,RATE - PER MTR Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
WORK FOR SIDE PLATE OF CANE CARRIER,INTER RAKE,LONG RAKE,BAGASSE ELIVATOR, MBC,RBC, FABRICATION AND ERECTION OF MS SIDE PLATE OF CANE CARRIER,INTER RAKE,LONG RAKE,BAGASSE ELIVATOR, MBC,RBC, BY 6 TO 10 MM THICKNESS. M.S. PLATE.,WITH ONE COAT RED OXIDE ,RATE - PER TON Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING , FABRICATION AND ERECTION OF BOTTOM TRAY/TROUGH OF BAGASSE CARRIER M.B.C., R.B.C AND BAGASSE ELIVATOR. AS PER EXISTING TRAY ,RATE - PER TON Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
REPLACEMENT OF WORNOUT SIDE PLATE OF FIBRIZER ( OPENING & DISCHARGE SHOOT AND BODY IN SIDE) BY M.S. PLATE OF 6 MM, 8 MM, 10 MM, M.S. PLATE INCLUDING HOOD,,WITH ONE COAT RED OXIDE ,RATE - PER TON Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION ERRECTION OF MS STRUCTURE BEAMCHANELANGLE HAND RAILING PIPECHEQUIRED PLATEMS PLATE ETCWITH ONE COAT RED OXIDE RATE PER TON Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING AND FABRICATION AND ERECTION OF AMMONIA COIL OF JUICE HEATER COIL PIPE DIA 25 AS PER EXISTING WORN OUT AMMONIA GAS COIL WITH ONE COAT RED OXIDE RATE PER COILNO Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF CIRCULAR AMMONIA COIL OF VAPOUR CELL SEMIKESTNER ALL PAN AND ALL QUAD BODY RATE PER COIL NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING FITING FEBRICATION AND ERRACTION OF WATER WASHING COIL OF ALL EVAPORATORALL PAN RATE SHOULD BE PROVIDED PER BODYNOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FEBRICATION ERRACTION AND FITTING DISMENTLING OF WORN OUT STEAM WASHING COIL OF ALL PAN RATE SHOULD BE PROVIDED PER COIL NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION AND ERECTION REPLACEMENT OF SCRUBBER OF SULPHER FURNACE BY MS PLATE OR MSPIPE AS PER EXISTING SCRUBBERWITH ONE COAT RED OXIDE RATE PER SCRUBBERNOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING FABRICATION AND ERECTION OF SULPHER MELTER OF SULPHER PHURNACE AS PER EXISTING MELTER BY MS PLATE OR MS PIPE WITH ONE COAT RED OXIDE RATE PER MELTERNOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING FEBRICATION AND ERACTION AND FITTING OF JUICE COIL OF DORRMS COIL SIZE4 AND OVER FLOW CLEAR JUICE MS PIPE SIZE3 RATE PER COIL OF 3 NOS PER COMPARTMENT 1 SET NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION AND ERECTION REPLACEMENT OF JUICE COIL WITH NIPPLE & REDUCER OF DOORS COIL SIZE4 & OVER FLOW CLEAR JUICE MS PIPE SIZE3 AS PER EXISTING COILWITH ONE COAT RED OXIDE RATE PER COIL OF 3 NOS PER COMPARTMENT 1 SET NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING FABRICATION AND ERECTION OF TOP COVER PLATE OF DORR CAPACITY 400 HL AS PER EXISTING COVER PLATE BY 10 MM 8 MM MS PLATE AND STEEL STRUCTURE ETC WITH ONE COAT RED OXIDE RATE PER TON Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING FABRICATION AND ERECTION OF MS STRUCTURE ARM OF JUICE SULPHITER AS PER EXISTING ARM WITH TRAILWITH ONE COAT RED OXIDE RATE ALL ARM ONE SETNO Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING FABRICATION AND ERECTION OF PIPE CYCLONE BY 2 MM MSSHEET AS PER EXISTING CYCLONE RATE WITH ONE COAT RED OXIDE PER CYCLONNOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING FABRICATION AND ERECTION OF QUAD STEAM CONDENSATE RECEIVING TANK AS PER EXISTING CONDENSATE RECEIVING TANK TANK SIZE OD 920 X HEIGHT 940 MS PLATE THICKNES 10 MMWITH ONE COAT RED OXIDE RATE PER TANKNOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING FABRICATION AND ERECTION OF SEMIKESTNER VAPOUR CELL JUICE HEATER CONDENSATE RECEIVING TANK AS PER EXISTING TANK SIZE OD 920 X HEIGHT 1880 MMMS PLATE THICK 10 MMWITH ONE COAT RED OXIDE RATE PER TANKNOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION OF MILL ROLLER JUICE COLLER AS PER EXISTING JUICE COLLOR BY M.S. PLATE - 8 MM ,WITH ONE COAT RED OXIDE , RATE PER COLLER./NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION ERECTION, MOTOR AND PUMP BED ,MOTOR SIZE - 5 HP TO 50 HP ,WITH ONE COAT RED OXIDE ,, RATE PER BED/NOS. Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION ERECTION, MOTOR AND PUMP BED ,MOTOR SIZE - 60 HP TO 200 KW, ,WITH ONE COAT RED OXIDE , RATE - PER BED/NOS. Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
REPLACEMENT OF SLUICE (VALVE DISMANTLING & FITTING) SIZE- 8 INCH TO 18 INCH RATE PER VALVE./ NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
REPLACEMENT OF SLUICE (VALVE DISMANTLING & FITTING) SIZE- 20 INCH TO 40 INCH RATE PER VALVE./ NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING OF WORN OUT MS BEND PLATE AND STEEL STRUCTURE ARM OF ALL TYPE OF PAN CRYSTLIZER BEND PLATE SIZE LENGTH 15 MTRWIDTH 150 MMTHICKNESS OF PLATE 20 MM RATE PER MTR BEND PLATEMTR Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING FABRICATION AND ERECTION OF VACCUMM BOTTLE OF OLIVER SIZE DIA 680 MM X HIGHT 2950 MMPLATE THICK 10 MM WITH CONOCAL AND CYLINDRICAL SAPEAS PER EXISTING BOTTLEWITH ONE COAT RED OXIDE RATE PER BOTTLE NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING FARICATION AND ERECTION OF VACCUMM BOTTLE OF OLIVER SIZE DIA 500 MM X HIGHT 1800 MMPLATE THICK 10 MM WITH CONOCAL AND CYLINDRICAL SAPEAS PER EXISTING BOTTLE WITH ONE COAT RED OXIDE RATE PER BOTTLE NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING FABRICATIONERECTIONREPARING OF WORN OUT PORTION OF SHAVE ALL OF PAN EVAPORATOR AS PER EXISITING BY MS PLATE WITH TRAILWITH ONE COAT RED OXIDE RATE PER SHAVE ALL Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
REPLACEMENT AND EXPANDATION OF SS TUBE OF QUAD , VAPOURCELL, SEMIKESTNER, JUICE HEATER AND PAN , AS PER EXISTING TUBE .WITH HYDRAULICALLY TRAIL/TESTING AT 7 Kg/CM2 ALSO. RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH. Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION AND ERECTION OF JUICE BOX OF DOUBLE BEAT VALVE OF JUICE HEATER BY 8 MM 10 MM MS PLATE AS PER EXISTING BOX SIZE WIDTH 710 MM X LENGTH 600 MM X 130 MM DEPTHWITH ONE COAT RED OXIDE RATE PER BOXNOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION AND ERECTION OF MUD SCRAPER OF DORR BY MS ROD,PLATE ETC.ASPER EXISTING. RATE PER NO Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING FABRICATION ERECTION FITTING OF WATER DRAIN GUTTER ,WITH ONE COAT RED OXIDE, RATE PER MT. AS PER EXISTING AND WELDING OF WATER DRAIN GUTTER UP TO 15 MTR HIGHT, - RATE PER MT. Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING AND FITTING PROFILE SHEETING WORK WITH MATERIAL THICK OF PROFILE SHEET 05 MM MAKE APOLO TATA RATE PER SHEET Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTALING AND FITTING CEMENT SHEETING WORK WITH MATERIAL PER SHEET WITH DISMENTLING OF EXISTING SHEETMAKE ACCEVEREST RATE PER SHEET Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION AND ERECTION OF SCREW TYPE MUD MIXER BY MS ,PLATE ETC.ASPER EXISTING. Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION OF BEND ,WITH ONE COAT RED OXIDE ,SIZE - 2 INCH TO 6 INCH PIPE DIA, RATE - PER NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION OF BEND ,WITH ONE COAT RED OXIDE ,SIZE - 8 INCH TO 16 INCH PIPE DIA, RATE - PER NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION OF BEND ,WITH ONE COAT RED OXIDE ,SIZE - 18 INCH TO 30 INCH PIPE DIA, RATE - PER NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION OF BEND SIZE - 32 INCH TO 44 INCH PIPE DIA, RATE - PER NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION AND ERECTION OF FLANGE 2 INCH TO 6 INCH WITH ONE COAT RED OXIDE , Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION AND ERECTION OF FLANGE 8 INCH TO 18 INCH ,WITH ONE COAT RED OXIDE , Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION AND ERECTION OF FLANGE 20 INCH TO 30 INCH ,WITH ONE COAT RED OXIDE , Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION AND ERECTION OF FLANGE 32 INCH TO 44 INCH ,WITH ONE COAT RED OXIDE Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION & ERRECTION OF MS PIPE LINE FOR NIPPLE & REDUCER SIZE-1/2 INCH WITH ONE COAT RED OXIDE RATE SHOULD BE PROVIDE IN PER INCH DIA Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION ERRECTION OF MS PIPE LINE FOR NIPPLE & REDUCER SIZE-1 INCH WITH ONE COAT RED OXIDE RATE SHOULD BE PROVIDE IN PER INCH DIA Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION & ERRECTION OF MS PIPE LINE FOR NIPPLE & REDUCER SIZE-1.1/2 INCH RATE SHOULD BE PROVIDE IN PER NO Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION & ERRECTION OF MS PIPE LINE FOR NIPPLE & REDUCER SIZE-2 INCH WITH ONE COAT RED OXIDE RATE SHOULD BE PROVIDE IN PER NO Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION & ERRECTION OF MS PIPE LINE FOR NIPPLE & REDUCER SIZE-2.1/2 INCH WITH ONE COAT RED OXIDE RATE SHOULD BE PROVIDE IN PER NO Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION & ERRECTION OF MS PIPE LINE FOR NIPPLE & REDUCER SIZE-3 INCH RATE SHOULD BE PROVIDE IN PER NO Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION & ERRECTION OF MS PIPE LINE FOR NIPPLE & REDUCER PIPE SIZE DIA-4 WITH ONE COAT RED OXIDE RATE SHOULD BE PROVIDE IN PER NO Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION & ERRECTION OF MS PIPE LINE FOR NIPPLE & REDUCER PIPE SIZE DIA-5 INCH RATE SHOULD BE PROVIDE IN PER NO Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMANTLING OF MS PIPE LINE FOR NIPPLE & REDUCER PIPE SIZE-6 INCH RATE SHOULD BE PROVIDE IN PER NO Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION & ERECTION OF MS PIPE LINE FOR NIPPLE, REDUCER & BEND PIPE SIZE-8 INCH WITH ONE COAT RED OXIDE RATE SHOULD BE PROVIDE IN PER NO Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION & ERECTION OF MS PIPE LINE FOR NIPPLE, REDUCER & BEND PIPE SIZE-10 INCH WITH ONE COAT RED OXIDE RATE PER NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
FABRICATION & ERECTION OF MS PIPE LINE FOR NIPPLE, REDUCER & BEND PIPE SIZE-10 INCH RATE SHOULD BE ONE COAT RED OXIDE PER NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
REPLACEMENT OF IBR VALVE (VALVE DISMANTLING & FITTING) SIZE-1/2 INCH TO 4 INCH RATE PER VALVE./ NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
REPLACEMENT OF IBR VALVE (VALVE DISMANTLING & FITTING) SIZE-6 INCH TO1 4 INCH RATE PER VALVE./ NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF IBR PIPE LINE DIA SIZE-1 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF IBR PIPE LINE DIA SIZE-1/2 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF IBR PIPE LINE DIA SIZE-2 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF IBR PIPE LINE DIA SIZE-1.1/2 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF IBR PIPE LINE DIA SIZE-3/4 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF IBR PIPE LINE DIA SIZE-4 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA 1/2 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA 1 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF PIPE LINE DIA-1.1/2 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF PIPE LINE DIA SIZE-2 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF PIPE LINE DIA SIZE-2.1/2 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF PIPE LINE DIA SIZE-3 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA SIZE-4 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA SIZE-5 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA SIZE-6 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA SIZE-8 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF M.S. PIPE LINE DIA SIZE-14 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA SIZE-16 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA SIZE-18 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA SIZE-20 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA SIZE-24 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA SIZE-28 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF M.S. PIPE LINE DIA SIZE-42 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF M.S. PIPE LINE DIA SIZE- 44 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF M.S. PIPE LINE DIA SIZE-3/4 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF M.S. PIPE LINE DIA SIZE-3 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF M.S. PIPE LINE DIA SIZE-32 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF M.S. PIPE LINE DIA SIZE-30 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF M.S. PIPE LINE DIA SIZE-36 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF M.S. PIPE LINE DIA SIZE-40 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA SIZE-10 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF MS PIPE LINE DIA SIZE-12 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF S.S PIPE LINE DIA SIZE-1 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF S.S PIPE LINE DIA SIZE-2 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF S.S PIPE LINE DIA SIZE-3 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF S.S PIPE LINE DIA SIZE-4 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF S.S PIPE LINE DIA SIZE-6 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING,FEBRICTION,ERECTION & FITTING OF S.S PIPE LINE DIA SIZE-8 INCH RATE SHOULD BE PROVIDE IN PER INCH DIA PER METER LENGTH Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING FABRICATIONERECTION OF INSPECTION BOX MANHOLE UP TO 2 SQUARE FEET DIA AS PER EXISTING MANHOLE WITH COVER RATE PER MANHOLE NOS Note :- 2 YEARS EXPERIENCE IN SUGAR FACTORY OF FEBRICATION WORKS
DISMENTLING & FITTING OF CEMENT SHEET RATE SQ. METER
MILL LUBRICATION SYSTEM REPAIRING & SERVICING AND TRAIL TESTING WITH MATERIAL
AMC FOR SERVICING AND TRAIL OF AIR COMPRESSOR (BOILER/CF) WITH MATERIAL MODEL - 2340, MAKE - IR
AMC FOR SERVICING AND TRAIL OF AIR COMPRESSOR (BOILER) MODEL - 2545, MAKE - IR
AMC FOR SERVICING AND TRAIL OF AIR COMPRESSOR MODEL - 7X5, NL CAPACITY- 1200 M3/HR, WITH TRIAL. AND MATERIAL MODELMAKE - IR
AMC FOR SERVICING AND TRAIL OF AIR COMPRESSOR (ETP) MODEL - UPS-22-7 SERIAL NO. 29752003, AND WITH MATERIALMAKE - IR
REPAIRING & MAINTENANCE CIVIL WORK OF BOILER FURNACE TO PROVODE HIGH TEMPERATURE (1200 DIGREE) NOTE:- 1.CASTABLE BRICK WORK WITH FIRE TILES(REFRACTING TILES) 2.TILES SIZE-300MM X 150MM WITH SIDE INTERLOCKING. 3.WORK WILL BE DONE AS PER SITE REQUIRMENT WITH MATERIAL. 4. IT IS MANDATERY FOR THE PARTY HAVE 5 YEAR EXPERIENCE IN BOILER
EXISTING BOILER FRONT ARCH 23 NOS OLD TUBE DIS, & NEW TUBE ERECTION & FABRICATION NOTE:- 1.THE CONTRACTOR SHALL CARRY OUT THE COMPLECT REPLACEMENT OF 23 NO FRONT ARCH WATER WALL TUBES FROM HEADER TO HEADER,IN THE BOILER USEING 23NOS FRONT ARCH TUBE PROVIDE BY FACTORY. 2.HYDROLIC TESTING & COMMISNING OF BOILER TUBES AS PER APPLICABE IBR (INDIAN BOILER REGULATION) 3.THE WORK SHALLBE CARRIED OUT AFTER THE OBTAING THE NECCESARY PERMISTION FORM THE BOILER INSPECTORATE OF BOILER. 4.ALL WELDING INSPACTION TESTING DOCUMETATION & CERTIFICATION SHALL BE COMPLECTED IN ACCRODANCE WITH THE LETEST IBR RULLS & ACCPLICABLE STATUTERY RECURMENTS. 5. THE CONTRACTOR SHALL PROVIDE ALL REQUIRE SKILLED MAN POWER,TOOLS & TACKLS,WELDING COSUMABLES & TESTING EQUPMENT FOT THE SUCCESS FULL COMPLETION OF THE WORK.RATE PER TUBES
REWINDING,REPAIRING & SERVICEING TESTING & TRIALS OF SLIPRING MOTOR DETAIL 3 PHASE 160 KW,177 HP,960 RPM,AMP=226 Note :- 2 YEARS EXPERIENCE IN AC MOTOR
MOTOR REWINDING & REPAIRING 160KW 1250 RPM DC MOTOR COMMULATOR AND ARMATUR FLIED COIL S1 AND S2 WITH F CLASS COPPER AND F CLASS INSULATION 2 YEARS EXPERIENCE IN DC MOTOR
SERVICING & REPAIRING OF TURBINE ACCUMULATOR WITH NITROZEN REFFILING
OVERHOLING REPAIRING & SERVICING FOR RO PLANT CAP- 25000 LTR PER/HOUR, MAKE-ECCOLINE
BELT JOINTING WORK WITH CHEMICAL & PEST, BELT WIDTH - 600 MM , RATE- PER JOINT / NOS
BELT JOINTING WORK WITH CHEMICAL & PEST, BELT WIDTH - 1500 MM, RATE- PER JOINT / NOS
AMC SERVICEING OF ESP , ESP MAKE - UNICORN,BOILER CAPACITY - 65 TON , - ELECTRICAL /MECHANICAL ,REPARING WITH TRIAL AND TESTED AT 150 M.,RATE - PER SEASON /NOS. 2 YEARS EXPERIENCE IN ESP
AMC SERVICING,TESTING AND TRIAL OF SUGAR BAGGING MACHINE MAKE - KVSON
SHUTTER REPAIRING WORK AS PER EXISTING WITH MATERIAL FITTING SERVICING & TRIAL WITH ONE YEAR WARRENTY
AMC FOR SERVICING ,TESTING AND TRIAL OF TRANSFORMER COMPLETE JOB WITH TAPE CHANGER CAPACITY-. 5000 KVA ,VOLT-33000,LV-11000,CURRENT HV- 87.47 A,LV - 262.43 A,PHASE - HV - 3,LV - 3, MAKE - VOLTAMP
AMC FOR SERVICING ,BUSHING,TESTING AND TRIAL OF TRANSFORMER COMPLETE JOB. 1500 KVA MAKE - VOLTAMP
AMC OF D.G.SETS. 625 KVA /UTA-25-G5-1 SERVICE P.A. MAKE INCHCUMINSINCH JAKSON MAKE - CUMMINS JACKSON Note :- 2 YEARS EXPERIENCE IN DG SET SERVICING
AMC OF D.G.SETS. 320 KVA/NTA-855-G2-1 SERVICE P.A. MAKE - CUMMINS JACKSON Note :- 2 YEARS EXPERIENCE IN DG SET SERVICING
AMC OF D.G.SETS 125 KVA/6BTAA S-9-G3 SERVICE P.A. . MAKE - CUMMINS JACKSON Note :- 2 YEARS EXPERIENCE IN DG SET SERVICING
AMC OF D.G.SETS 25 KVA/SX - 3 SERVICE P.A. MAKE - CUMMINS JACKSON Note :- 2 YEARS EXPERIENCE IN DG SET SERVICING
AMC FOR SERVICING ,TESTING AND TRIAL OF TRANSFORMER COMPLETE JOB. 2500 KVA 2500 KVA MAKE - VOLTAMP
FOR PAINTING OF TRANSFORMER COMPLETE JOB. 2500 KVA MAKE - VOLTAMP
AMC FOR SERVICING AND TRAIL OF WEIGH BRIDGE WITH MATERIAL, BRIDGE CAPACITY - 60 MT, MAKE - JYOTI 2 YEARS EXPERIENCE IN WEIGH BRIDGE SERVICE
AMC FOR SERVICING AND TRAIL OF WEIGH BRIDGE WITH MATERIAL ,BRIDGE CAPACITY - 40 MT MAKE - JYOTI 2 YEARS EXPERIENCE IN WEIGH BRIDGE SERVICE
SERVICING TESTING AND TRAIL OF CANE UNLOADER HYDRAULIC GRAV PUMP ,CAP - 5 MT, WITH MATERIAL 2 YEARS EXPERIENCE IN GRAV PUMP
SERVICEING OF MILL HYDRAULIC ACCUMULATOR CYLINDER AND FILLING OF GAS AS PER REQUIREMENT ,WITH , MATERIAL TESTING AND TRIAL MAKE - MALIK/HIGH FLOW 2 YEARS EXPERIENCE IN SUGAR FACTORY
UOM Name
Percentage
% of Cost of Bridge (excluding Maintenance) sanctioned by competent authority
Per mile
1000 piece
Per Diem Rate
MAN DAYS
1 Piece
1 Strip
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.10 MB
8048158279640377604_198163_General AMC Servicing and Febrication and Civil Works Second E Tender.pdf
NIT • 7.24 MB
6161282262056915822_198163_General AMC Servicing and Febrication and Civil Works Second Tender.xlsx
BOQ • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].