Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹12.9 L+₹14,007.61 (1.10%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹13.1 L+₹38,179.21 (3.00%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Banwari Lal Meena L1 | M/s Sankalp Developers L2 | Rakesh Infra Construction L3 |
|---|---|---|---|---|---|---|
| 1.00MASTIC FLOORING WORK IN LPG CYLINDER STORAGE GODOWN AS PER IS:1195,1196 Bitumen mastic flooring is provided in LPG cylinder storage godown to ensure a smooth, durable, non-sparking and safe surface for storage and handling of LPG cylinders. The work shall be carried out using approved materials and standard procedures | ||||||
| 1.01Terminology Asphalt/Bitumen: IS 702:1988/2022 specifies the requirements for industrial grade bitumen (such as 85/25 or 90/15) used in mastic flooring. Fillers and Aggregates Limestone or Marble Powder: • Naturally occurring consolidated stratified calcareous rock or marble powder, clean and free from impurities. • Aggregate/Bajri (Fine Aggregate): • Naturally occurring stone or rock ground to required grading and free from dust or foreign matter. Coarse Aggregate/Marble Granules: Consisting of clean igneous or calcareous rock or siliceous material obtained from natural deposits by screening, crushing or mechanical process and as free from dust as practicable | ||||||
| 1.02Preparation and Laying of Bitumen Mastic The aggregates, coarse aggregates and other fillers shall be thoroughly incorporated manually at high temperature with the requisite proportion of hot bitumen of approved grade. The materials shall be heated and mixed until a homogeneous and properly cooked mastic is obtained. The prepared hot mastic shall then be transported carefully and spread over the prepared surface of the LPG godown floor to the specified thickness using suitable wooden hand tools. The surface shall be properly leveled and finished with heavy wooden floats to obtain a smooth and even finish | ||||||
| 1.03 | After completing the entire flooring surface, the joints separating each bay shall be sealed with melted bitumen. Limestone or marble powder shall then be uniformly sprinkled over the finished surface, which will be absorbed into the mastic in due course of time and provide a proper finish.
The newly laid mastic floor shall be allowed to cool naturally. The floor shall not be used or subjected to traffic until it is thoroughly cooled and hardened to ensure proper setting and durability.
This mastic flooring provides a strong, smooth and safe surface suitable for LPG cylinder storage godown operations | 160 | Sqm | 500 ₹80,000 Lowest | 1,300 ₹2,08,000 | 1,700 ₹2,72,000 |
| 2.00 | Supplying and fixing fixed Brass wire gauge of 14 mesh x 24 gauge to the metal frame of rolled section by metal beading 20x3 mm with suitable screw at not exceeding 150mm distance. Double layer (1.00 X.28) | 48 | Nos | 500 ₹24,000 Lowest | 800 ₹38,400 | 525 ₹25,200 |
Tender Value
₹13.8 L
EMD Value
₹27,520
Closing Date
20 Mar 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
RSAMB Division-II Jaipur
Construction of Boundary wall with Main Gate of Gas Godown (RAJFED) at Jhotwara Jaipur
2026_RSAMB_544865_1
RSAMB/Jaipur-II/NIT-15/2025-26
Open Tender
Civil Works
Percentage
Jaipur
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
EE RSAMB Division-II Jaipur
₹27,520
Yes
23 Mar 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
20 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MASTIC FLOORING WORK IN LPG CYLINDER STORAGE GODOWN AS PER IS:1195,1196 Bitumen mastic flooring is provided in LPG cylinder storage godown to ensure a smooth, durable, non-sparking and safe surface for storage and handling of LPG cylinders. The work shall be carried out using approved materials and standard procedures | |||||
| 1.01 | Terminology
Asphalt/Bitumen:
IS 702:1988/2022 specifies the requirements for industrial grade bitumen (such as 85/25 or 90/15) used in mastic flooring.
Fillers and Aggregates
Limestone or Marble Powder:
• Naturally occurring consolidated stratified calcareous rock or marble powder, clean and free from impurities.
• Aggregate/Bajri (Fine Aggregate):
• Naturally occurring stone or rock ground to required grading and free from dust or foreign matter.
Coarse Aggregate/Marble Granules:
Consisting of clean igneous or calcareous rock or siliceous material obtained from natural deposits by screening, crushing or mechanical process and as free from dust as practicable | - | - | - | - |
| 1.02 | Preparation and Laying of Bitumen Mastic
The aggregates, coarse aggregates and other fillers shall be thoroughly incorporated manually at high temperature with the requisite proportion of hot bitumen of approved grade. The materials shall be heated and mixed until a homogeneous and properly cooked mastic is obtained.
The prepared hot mastic shall then be transported carefully and spread over the prepared surface of the LPG godown floor to the specified thickness using suitable wooden hand tools. The surface shall be properly leveled and finished with heavy wooden floats to obtain a smooth and even finish | - | - | - | - |
| 1.03 | After completing the entire flooring surface, the joints separating each bay shall be sealed with melted bitumen. Limestone or marble powder shall then be uniformly sprinkled over the finished surface, which will be absorbed into the mastic in due course of time and provide a proper finish.
The newly laid mastic floor shall be allowed to cool naturally. The floor shall not be used or subjected to traffic until it is thoroughly cooled and hardened to ensure proper setting and durability.
This mastic flooring provides a strong, smooth and safe surface suitable for LPG cylinder storage godown operations | 160 | Sqm | - | - |
| 2 | Supplying and fixing fixed Brass wire gauge of 14 mesh x 24 gauge to the metal frame of rolled section by metal beading 20x3 mm with suitable screw at not exceeding 150mm distance. Double layer (1.00 X.28) | 48 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 0.49 MB
Tendernotice_3.pdf
PDF • 0.34 MB
Tendernotice_4.pdf
PDF • 0.12 MB
Tendernotice_5.pdf
PDF • 0.43 MB
Tendernotice_6.pdf
PDF • 1.45 MB
Tendernotice_7.pdf
PDF • 0.61 MB
BOQ_971974.xls
BOQ • 0.29 MB
Bid-Doc-Jhotwara.pdf
Tender Documents • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .