Tender Value
₹42,075
Closing Date
24 Aug 2026, 5:00 pmDue tomorrow
EE RMC
RMC
Construction of RCC Culvert at Lalpur Peace road under ward No-08
2026_UDD_117333_1
308/eng 2026
Open Tender
Civil Works
Works
30 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
13 Aug 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Dismantling of PCC work ……do….all complete as per specification and direction of E/I, | 0.6 | M³ | 955.89 | ₹573.53 |
| 2 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts,levelling,ramming the foundation trenches,removing roots of trees,shrubs all complete as per approved design,building specification and direction of E/I. | 3.09 | M³ | 151.82 | ₹469.12 |
| 3 | Providing,supplying & spreding of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials, labour,royality and taxes all complete as per specification and direction of E/I ( Mode of measurment compacted volume.) | 0.19 | m3 | 347.85 | ₹66.09 |
| 4 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | 0.49 | M2 | 1,756.4 | ₹860.64 |
| 5 | Reinforced cement concrete work in walls (any thickness),including attached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc.above plinth level upto to five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½:3 (1 cemet : 1½ coarse sand (zone-iii) : 3 graded stone aggregate 20mm nominal size ) | 1.46 | M³ | 6,082.45 | ₹8,880.38 |
| 6 | Reinforced cement concrete work in beam, suspended floors, roofs having slope up to 15° landing,balconies, shelves, chajjas, lintel, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinfocement, with 1:1.5:3(1 cement : 1.5 coarse sand(zone-iii) : 3 graded stone aggregate 20mm nominal size) | 0.81 | M³ | 6,308.87 | ₹5,110.18 |
| 7 | Providing Tor steel reinforcement of 8 mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. | 0.07 | MT | 83,314.02 | ₹5,998.61 |
| 8 | Providing Tor steel reinforcement of 10mm and 12mm dia rods as per approved …...........do…..........TMT Fe 500(Only valid for Tata (Tiscon),SAIL,JSPL,Electrosteel Steels Ltd, Bokaro and Vizag(RINL) | 0.11 | MT | 82,096.54 | ₹8,866.43 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of from for Foundations,footings, bases of columns, etc. for mass concrete. | 10.23 | M² | 194.5 | ₹1,989.74 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
Tendernotice_2.pdf
PDF • 1.71 MB
BOQ_158564.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].