Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹43.7 LAccepted-AOC 120 1A PARVEEN COLONY PARVEEN COLONY TRIKUTA NAGAR JAMMU JAMMU KASHMIR 180015 | JAMMU | JAMMU AND KASHMIR | 180015 | ₹43.7 L | l1 | Accepted-AOC Lowest |
| 2 | l2₹44.0 L+₹28,545.50 (0.65%)Rejected-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹44.0 L+₹28,545.50 (0.65%) | l2 | Rejected-Finance l2 |
| 3 | Rejected-Technical HILL VIEW COTTAGE KUFRIDHAR GHANAHATTI DISTT SHIMLA HP 171011 | SHIMLA | SHIMLA | HP | 171011 | - | - | Rejected-Technical Rejeceted |
| 4 | Rejected-Technical VILL ATHMAN PO AMB TEH AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | - | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹84,000
Closing Date
29 Nov 2023, 6:00 pmClosed
National Highway Division Hamirpur
National Highway Division Hamirpur
Construction of Retaining wall at RD 77/900 to 77/907.5 (L.H.S ) and 78/930 to 78/955 (RHS) Under FDR ( Job No. RO-HP-NH-503 -2023-24-019
2023_PWD_81735_1
NHD 6979-7005 dated 20.11.2023
Open Tender
Civil Works
Item Rate
EE NH Hamirpur
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,000
₹84,000
16 Jan 2024
22 Nov 2023
30 Nov 2023
22 Nov 2023
29 Nov 2023
22 Nov 2023
Amount
Earth work in excavation of foundation in all heights and depths in all kinds of soil including saturated soil comprising of Pick work, Jumper work, blasting work both in hard and soft rock, chiseling /wedging out of rock (Where blasting work is prohibited) and their intermediate classification, if water is met with in during the excavation due to spring seepage, rain and other case, it shall be removed by suitable diversion and bailing out and the excavation shall be kept by wherever so required by the contractor at his own cost including dressing of slopes and beds and setting out, conforming to required lines and side slopes as shown on the drawing including returning of soil when required into plinths sides of foundation etc. transportation of soil and disposal of surplus excavated soil in all leads and lifts by head load, mechanical transportation with all cases of labour and machineries or any other incidental required to complete the work as per MORTH Specification by Mechanical Means. All useful materials to be stacked along road side to maximum possible extent in all leads and lifts through all modes of transportation.Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor which have to be duly compensated by him in all cases with in all leads and lifts including all material, labour, machinery/ equipments and any other incidentals required to complete the job as per direction of Engineer-in-Charge.
Providing and laying filter media with granular materials/ stone crushed aggregate satisfying the requirements laid down of MORTH specifications to a thickness of not less than 600mm (Six Hundred Millimetre )with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutments Retaining wall, Breast wall to the full height compacted to firm condition complete as per the Drawings and Specifications. Item to include all leads and lifts materials, labour, machinery/ equipment and incidental work required to complete the job as per the direction of Engineer-in-Charge.
Providing and laying Plain cement concrete M15 (M -Fifteen)(1:2:5:5 ) (One Cement: two point five sand: five aggregate Grade with crushed stone aggregate) mechanically mixed vibrated placed in position and curing complete including cost of form work as per the Drawing and MoRT&H specifications with in all leads and lifts including all material, labour, machinery/ equipments and any other incidentals required to complete the job as per direction of Engineer-in-Charge. NOTES : A) The scope of work in the item includes: a) Pumping / bailing out of water, including its labour, material and equipments to keep the work area dry. b) All incidental work required to execute the job. B) Measurement: Measurements shall be made for actual volume of concrete.
Providing weep holes in abutment wall, wing wall/ return wall, Retaining wall, Breast wall with 100mm( One hundred Millimetre) dia AC pipe, extending through the full width of the structure with slope of 1V:20H (One vertical : twenty horizontal) towards drawing face as per the Drawings and MoRT&H Specifications and as per direction of Engineer-in-Charge. Item to include with in all leads and lifts, materials, labour, machinery/ equipments and incidental work required to complete the job. Measurement shall be made for actual length of weep holes.
RAKESH KUMAR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .