| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 LAccepted-AOC PLOT NO N 6 356 IRC VILLAGE NAYAPALLI BHUBANESWAR DIST KHORDHA | BHUBANESWAR | KHORDHA | ODISHA | ₹19.1 L | L1 | Accepted-AOC L1 bidder is declared as the successful biddder |
| 2 | L2₹20.0 L+₹92,395.50 (4.85%)Rejected-AOC | ₹20.0 L+₹92,395.50 (4.85%) | L2 | Rejected-AOC Rejected because the contract is awarded to the L1 bidder |
| 3 | L3₹23.9 L+₹4.8 L (25.3%)Rejected-AOC | ₹23.9 L+₹4.8 L (25.3%) | L3 | Rejected-AOC Rejected because the contract is awarded to the L1 bidder |
| 4 | L4₹24.1 L+₹5.1 L (26.6%)Rejected-AOC | ₹24.1 L+₹5.1 L (26.6%) | L4 | Rejected-AOC Rejected because the contract is awarded to the L1 bidder |
Tender Value
Refer Docs
EMD Value
₹24,124
Closing Date
21 Mar 2026, 5:00 pmClosed
Divisional Head,IDCO Cuttack Division
Division Office , IDCO, Cuttack Division.
Construction of Paver Work
2026_IDCO_126877_1
CTC/CIV/EST/E-04/2025-26
National Competitive Bid
Civil Works - Others
Percentage
Divisional Office, IDCO, Jagatpur IE
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,080
₹24,124
Yes
25 Jun 2026
9 Mar 2026
23 Mar 2026
9 Mar 2026
21 Mar 2026
9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of existing stumps of trees dead or cut earlier stacking serviceable material for use or auction within the road land & disposal of all unserviceable material including removal top 150mm thick organic soil away from the road land as under Clause no. 201 & Section 200, section 100 & Cl.112 of technical specification Part- I/II specification for Road & Bridge work of MORT&H (5th revision) including full compensation inclusive costs for all contingencies, incidentals involved for the finished operations defect free item work to specification complete & direction of Engineer or his representative to satisfaction. | 1,063 | Sqm | 8.45 | ₹8,982.35 |
| 2 | Earth work in ordinary soil within the initial lead of 50 m. and initial lift of 1.50 m. including rough dressing and breaking of clods to maximum 5 cm. To 7 cm. etc. all complete. | 478.35 | Cum | 171.72 | ₹82,142.26 |
| 3 | filling foundation & plinth with excavated earth | 318.9 | Cum | 113.33 | ₹36,140.94 |
| 4 | Supplying & filling Foundation & Plinth with sand, well watered and rammed etc complete. | 53.15 | Cum | 1,159.14 | ₹61,608.29 |
| 5 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead | 24 | Cum | 1,696.95 | ₹40,726.8 |
| 6 | Loosening minimum 150mm thick, levelling Compacting original ground supporting embankment to facilitate construction of earthen embankment, sprinkling water to OMC and compacting by rolling so as to achieve minimum required, density table 300-1, 300-2 in embankment construction as per technical specification Part I / II under Cl. 303 & 112 table No.- 300-1 of specification for road and bridge works MORT&H (5th revision) complete including full compensation of all operations, all inclusive costs, contigencies, incidentals involved for the finished defect free item of work complete to specification as per direction of Engineer or his representative to satisfaction. | 40 | Cum | 143.75 | ₹5,750 |
| 7 | Construction of G.S.B. by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory power roller to achieve the desired density, complete as per clause no. 401. | 212.6 | Cum | 3,694.62 | ₹7,85,476.21 |
| 8 | P.C.C (1:3:6) Using 40 mm H.G (Hard granite) metal in foundation. | 106.3 | Cum | 6,953.08 | ₹7,39,112.4 |
| 9 | supplying and fixing of 80mm thick cement concrete interlocking paver block of m-40 | 1,063 | Sqm | 608.4 | ₹6,46,729.2 |
| 10 | supplying of subgrade and earthen shoulders with approved material obtained from borrowpit having CBR not less than 5% with all lift and leads, transporting to sit, spreading , grading to required slope and compacted to meet | 159.45 | Cum | 36.04 | ₹5,746.58 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
DTCN1.pdf
Tender Documents • 1.37 MB
BOQ_583986.xls
BOQ • 0.31 MB
20260320154245.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .