| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.4 LAdmitted-Finance | -35.35% | ₹36.4 L | L1 | Admitted-Finance |
| 2 | L2₹37.4 LAdmitted-Finance | -33.67% | ₹37.4 L | L2 | Admitted-Finance |
| 3 | L3₹39.0 LAdmitted-Finance F 479 SECTOR 9 VIJAY NAGAR GHAZIABAD 201009 UTTAR PRADESH | GHAZIABAD | UTTAR PRADESH | 201009 | -30.90% | ₹39.0 L | L3 | Admitted-Finance |
| 4 | L4₹41.4 LAdmitted-Finance | -26.51% | ₹41.4 L | L4 | Admitted-Finance |
Tender Value
₹56.4 L
EMD Value
₹1.1 L
Closing Date
19 Jan 2026, 3:00 pmClosed
Executive Engineer, PWD M-113(N), Brar Square, New
Executive Engineer, PWD M-113(N), Brar Square, New Delhi.
Redevelopment of Central Verge of Premnath Dogra marg under Sub Division-II of Division SWR-1 Delhi during 2025-26. (SH Construction of RCC Crash Barrier at Central Verge of Road Premnath Dogra Marg
2026_PWD_284684_1
83/EE/SWR-I/PWD/2025-26 (2nd call)
Open Tender
Civil Works
90 days
New Delhi
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.1 L
20 Jan 2026
12 Jan 2026
19 Jan 2026
12 Jan 2026
19 Jan 2026
12 Jan 2026
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement : All works upto plinth level : Concrete of M25 grade with minimum cement content of 330 kg /cum
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
Modified Estimated cost after correction factor on on DSR 2023 on account of GST @ 0.973 on DSR Items
Add Cost Index 3% on DSR
Credit of old Kerb Stone received from the dismantling. The material so received shall be the property of contractor after dismantling dully weighed/ measured before removing from the site in the presence of Engineer-in-charge or his authorized representative all complete as per direction of Engineerin- charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_376534.xls
BOQ • 0.23 MB
recallnit83.pdf
Tender Documents • 1.66 MB
Download all tender documents and submit your bid