| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.8 LAccepted-AOC | ₹75.8 L | L1 | Accepted-AOC L1 contractor |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified |
| Sl No | Description | Qty | Unit | PRITHVI AND CO L1 |
|---|---|---|---|---|
| 1.00Name Of Work:- Strenthening of Road from Andarkottaram to Pappankudi Road KM 0/0 - 1/400 ( R 48 ) | ||||
| 2.00 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., complete. | 1,512 | sqm | 6 ₹9,072 |
| 3.00 | Picking the existing worn out BT surface including cost and conveyance and all other labour charges etc complete | 1,732.5 | sqm | 23 ₹39,847.50 |
| 4.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A | 346.5 | cum | 140 ₹48,510 |
| 5.00Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | ||||
| 6.00 | KM 0/0- 1/0 | 180 | cum | 702 ₹1.3 L |
| 7.00 | KM 1/0- 1/400 | 72 | cum | 702 ₹50,544 |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 630 | cum | 2,768 ₹17.4 L |
| 9.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 4,200 | sqm | 87 ₹3.7 L |
| 10.00 | Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.. etc., | 4,200 | sqm | 20 ₹84,000 |
Tender Value
₹75.8 L
EMD Value
₹78,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Joint Director/Project Director DRDA Madurai
o/o Joint Director/Project Director DRDA Madurai
Madurai District Strengthening of 1 no of Roads in Madurai East Block under Nabard (2026-27) Pakcage no Nabard 2026-27/MDU/01
2026_RDTN_656508_8
DIPR/1020/Tender/2026
Open Tender
Civil Works
180 days
Madurai East
Refer Tender document
3 documents required · 3 mandatory
₹0
₹78,000
o/o Joint Director DRDA Madurai
13 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
16 Feb 2026
16 Feb 2026
Clearingthe Scrub jungle including all labour charges for burrying and burning etc., complete.
Picking the existing worn out BT surface including cost and conveyance and all other labour charges etc complete
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.. etc.,
Providing Bituminousmacadam 50mm thick including all cost and conveyance of all the Materials all other Labour charges etc Comlete
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Road Marking
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Technical08.pdf
Tender Documents • 1.30 MB
BOQ_788635.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid