Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Finance | -28.48% | ₹7.3 L | L1 | Admitted-Finance |
| 2 | L2₹7.4 L+₹5,933.81 (0.81%)Admitted-Finance RZ H 5 NANDA BLOCK MAHAVIR ENCLAVE PART 1 PAL AM SOUTH WEST DELHI DELHI 110045 | SOUTH WEST DELHI | DELHI | 110045 | -27.90% | ₹7.4 L+₹5,933.81 (0.81%) | L2 | Admitted-Finance |
| 3 | L3₹7.5 L+₹22,814.49 (3.12%)Admitted-Finance HOUSE NO 8 589 BEHIND PHC HOSPITAL OLD BUS STAND KORBA KORBA CHHATTISGARH 495678 | 495678 | -26.25% | ₹7.5 L+₹22,814.49 (3.12%) | L3 | Admitted-Finance |
| 4 | L4₹7.6 L+₹27,622.92 (3.78%)Admitted-Finance 208 L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | -25.78% | ₹7.6 L+₹27,622.92 (3.78%) | L4 | Admitted-Finance |
| 5 | L5₹7.7 L+₹35,398.27 (4.84%)Admitted-Finance | -25.02% | ₹7.7 L+₹35,398.27 (4.84%) | L5 | Admitted-Finance |
Tender Value
₹10.2 L
EMD Value
₹20,460
Closing Date
30 Jun 2026, 6:00 pmClosed
municipal board sanchore
municipal board sanchore
CONSTRUCTION OF CC ROAD FROM SAKIL BHAI BETRY HOME TO ARTULA BHAI HOME AND NERA BY AREA
2026_DLB_568233_3
nit no 1510 date 12/06/2026 in nagar palika sanchore
Open Tender
Civil Works
Percentage
municipal board sanchore
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MDIRSL/ Executive Officer municipal board sanchore
₹20,460
Yes
6 Jul 2026
15 Jun 2026
1 Jul 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. Depth upto 1.5 m Add extra for overall depth of excavation above 3.0 m and upto 4.5 m over item no | - | Cum | 235 | - |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: up to 3km | - | cum | 185.54 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | cum | 3,070 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | - | Cum | 6,740 | - |
| 5 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 7.5 metre from floor level) including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 1 | sqm | 236.5 | ₹236.26 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.74 MB
BOQ_1010844.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .