Loading…
Loading…
Tender Value
₹4127.5 Cr
EMD Value
₹20.6 Cr
Closing Date
16 Sept 2026, 5:00 pm
Executive Engineer, North Mumbai (P.W.) Division
Executive Engineer, North Mumbai (P.W.) Division, Andheri , Mumbai , Administrative Building , First floor , Near Bhavans Collage , Andheri 400058
Construction of the New Integrated High Court Complex on plot bearing CT.S. No. 629/1234/A/1 at Bandra Government colony Bandra (E)Mumbai. EPC (Engineering, Procurement and Construction)
2025_PWR_1239154_1
NIT_NO_01_FOR_2025_26 EPC
Open Tender
Civil Works
Lump-sum
1800 days
Bandra
As Per Tender Documents
6 documents required · 6 mandatory
₹11,800
₹20.6 Cr
Yes
Chief Engineer, Mumbai, (P.W.) Region, Mumbai
16 Sept 2026
4 Nov 2025
18 Sept 2026
4 Nov 2025
16 Sept 2026
4 Nov 2025
4 Nov 2025 - 21 Aug 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of the New Integrated High Court Complex on plot bearing CT.S. No. 629/1234/A/1 at Bandra Government colony Bandra (E)Mumbai. EPC (Engineering, Procurement and Construction) | - | Nos | 41,27,48,53,128 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_2137902.xls
BOQ • 0.28 MB
Volume-I.pdf
Tender Documents • 0.93 MB
Volume-II.pdf
Tender Documents • 0.98 MB
CorrigendumNo_08.pdf
PDF • 1.36 MB
CorrigendumNo_07.pdf
PDF • 1.41 MB
CorrigendumNo_06.pdf
PDF • 1.41 MB
CorrigendumNo5.pdf
PDF • 1.77 MB
CorrigendumNo_04.pdf
PDF • 1.70 MB
CorrigendumNo_03.pdf
PDF • 1.19 MB
CorrigendumNo_02.pdf
PDF • 0.93 MB
CorrigendumNo_01.pdf
PDF • 0.11 MB
CorrigendumNo1.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].