Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.2 LAdmitted-Finance | ₹71.2 L | L1 | Admitted-Finance |
| 2 | L2₹71.5 L+₹30,434 (0.43%)Admitted-Finance | ₹71.5 L+₹30,434 (0.43%) | L2 | Admitted-Finance |
| 3 | L3₹72.0 L+₹73,189 (1.03%)Admitted-Finance | ₹72.0 L+₹73,189 (1.03%) | L3 | Admitted-Finance |
| 4 | L4₹74.7 L+₹3.5 L (4.91%)Admitted-Finance | ₹74.7 L+₹3.5 L (4.91%) | L4 | Admitted-Finance |
| 5 | L5₹75.0 L+₹3.8 L (5.34%)Admitted-Finance | ₹75.0 L+₹3.8 L (5.34%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AM CONSTRUCTION AND ENGINEERING L7 | MANGALA BUILDERS ASSOCIATES L13 | MAA DAKHINAKALI ENTERPRISERS L2 | GURU CHARAN DAS L10 | BIKRAM KESHARI ROUTARAY L8 | Abhimanyu Kar L1 | Manas Ranjan Pal L9 | Gyana Ranjan Mohanty L4 | Samir Ranjan Barman L14 | M/s.Bula Bilash Construction L6 | M/S SHREE MAA ENGINEERING L11 | J. R. PROJECT AND CONSTRUCTIONS PVT. LTD. L12 | DHARANIDHAR PRADHAN L3 | LAXMIDHAR ROUT L5 | sai nithya constructions pvt ltd L15 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick masonry in lime or cement mortar under 4m height including stacking the useful materials for reuse and removing the debris within 50m cleaning the debrises with supply of all labour, T&P, staging, scaffolding, etc. complete with all taxes, including leads & lifts transportation & disposing at specified place and as per direction of Engineer-in-charge. | 51 | Each Cum | 350 ₹17,850 | 1,000 ₹51,000 | 350 ₹17,850 | 600 ₹30,600 | 300 ₹15,300 | 241 ₹12,291 | 360 ₹18,360 | 500 ₹25,500 | 200 ₹10,200 Lowest | 250 ₹12,750 | 1,200 ₹61,200 | 324 ₹16,524 | 491 ₹25,041 | 810 ₹41,310 | 900 ₹45,900 |
| 2.00 | Dismantling and removing R.C.C. columns, beams, slab, including stacking the useful materials for reuse and removing the debris within 50m with supply of all labour, T&P, staging, scaffolding, etc. complete cleaning the debrises with all taxes, including leads & lifts transportation & disposing at specified place and as per direction of Engineer-in-charge. | 33 | Each Cum | 750 ₹24,750 | 1,200 ₹39,600 | 600 ₹19,800 | 600 ₹19,800 | 800 ₹26,400 | 220 ₹7,260 Lowest | 800 ₹26,400 | 1,500 ₹49,500 | 1,500 ₹49,500 | 650 ₹21,450 | 2,000 ₹66,000 | 1,782 ₹58,806 | 455 ₹15,015 | 1,080 ₹35,640 | 2,400 ₹79,200 |
| 3.00 | Earth work in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles with supply of all material labour transporation , taxes , tollage , royalties,port entry fees etc all complete but excluding GST as directed by EIC | 400 | Each Cum | 120 ₹48,000 | 132 ₹52,800 | 125 ₹50,000 | 200 ₹80,000 | 130 ₹52,000 | 150 ₹60,000 | 125 ₹50,000 | 150 ₹60,000 | 150 ₹60,000 | 220 ₹88,000 | 300 ₹1,20,000 | 243 ₹97,200 | 62.5 ₹25,000 Lowest | 207 ₹82,800 | 235 ₹94,000 |
| 4.00 | Filling the low laying area with saline sand or dreged spoil as per required level in layer wise ,each layer not exceed 1mtr.,watering,compacting with VRR to achive OMC etc. complete excluding GST and as per direction of Engineer in charge. | 673.5 | Each Cum | 200 ₹1,34,700 | 300 ₹2,02,050 | 230 ₹1,54,905 | 300 ₹2,02,050 | 250 ₹1,68,375 | 180 ₹1,21,230 | 250 ₹1,68,375 | 100 ₹67,350 Lowest | 250 ₹1,68,375 | 210 ₹1,41,435 | 220 ₹1,48,170 | 729 ₹4,90,981.5 | 149 ₹1,00,351.5 | 306 ₹2,06,091 | 2,300 ₹15,49,050 |
| 5.00 | P.C.C(1:3:6) of using 20 mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope consolidating, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC | 68 | Each Cum | 3,700 ₹2,51,600 | 4,900 ₹3,33,200 | 2,900 ₹1,97,200 Lowest | 4,500 ₹3,06,000 | 3,900 ₹2,65,200 | 3,900 ₹2,65,200 | 3,900 ₹2,65,200 | 3,200 ₹2,17,600 | 4,500 ₹3,06,000 | 5,000 ₹3,40,000 | 4,500 ₹3,06,000 | 4,456 ₹3,03,008 | 2,942 ₹2,00,056 | 3,600 ₹2,44,800 | 7,000 ₹4,76,000 |
| 6.00 | Reinforced Cement concrete (1 cement:1.5 Coarse sand:3 chips) using 12mm to 20mm size C.B.H.G. chips of approved quality for all floors, foundation & plinth etc. of including mixing in a mixer machine, hoisting, laying in proper level, consolidating by mechanical vibrator,finished smooth to the form work and exposed surface, curing, water charges, including cost of all materials, labour, Transportation, all testing, engagement & hire charges of all mechaniries,T&P , tollage, royalties, all taxes excluding GST etc.all complete but excluding cost of reinforcement,formwork and bending/binding charges as directed by Engineer-in-charge. | 300 | Each Cum | 5,200 ₹15,60,000 | 6,000 ₹18,00,000 | 5,000 ₹15,00,000 | 5,500 ₹16,50,000 | 5,300 ₹15,90,000 | 5,500 ₹16,50,000 | 5,500 ₹16,50,000 | 4,900 ₹14,70,000 | 6,300 ₹18,90,000 | 6,900 ₹20,70,000 | 350 ₹1,05,000 Lowest | 6,886 ₹20,65,800 | 6,000 ₹18,00,000 | 6,300 ₹18,90,000 | 9,020 ₹27,06,000 |
| 7.00 | Supply Tor/TMT steel manufactured by Original steel manufacture company not for rolling mills minimum Steel of Grade - Fe 500, confirming to IS-1786 including, cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges,loading at one end & unloading at other end,T&P, all taxes,etc. all complete as per the direction of Engineer-in-charge but excluding GST.
(NB: No Wastage shall be Paid, Steel Coefficient shall be considered as per IS1786 for Payment Purpose.) | 300 | Each Qntl. | 7,500 ₹22,50,000 | 7,200 ₹21,60,000 | 5,900 ₹17,70,000 | 7,500 ₹22,50,000 | 7,000 ₹21,00,000 | 6,400 ₹19,20,000 | 7,400 ₹22,20,000 | 7,000 ₹21,00,000 | 7,000 ₹21,00,000 | 6,900 ₹20,70,000 | 9,000 ₹27,00,000 | 5,671 ₹17,01,300 | 5,750 ₹17,25,000 | 5,400 ₹16,20,000 Lowest | 8,000 ₹24,00,000 |
| 8.00Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank & MS pipes, jacks and other accessories of approved quality for R.C.C. work for following structures and deshuttering, removing the same after due period with paining with coal tar /lubricants on the ply/steel surface after each use with supply of all materials, labour,transportation, T&P, all taxes, royalties, tollage, but excluding GST etc. complete as directed by Engineer-in-charge. | ||||||||||||||||||
| 8.01 | Foundation plinth | 729.5 | Each Sqm | 300 ₹2,18,850 | 300 ₹2,18,850 | 120 ₹87,540 | 110 ₹80,245 Lowest | 290 ₹2,11,555 | 120 ₹87,540 | 290 ₹2,11,555 | 115 ₹83,892.5 | 250 ₹1,82,375 | 200 ₹1,45,900 | 700 ₹5,10,650 | 203 ₹1,48,088.5 | 138 ₹1,00,671 | 300.6 ₹2,19,287.7 | 460 ₹3,35,570 |
| 8.02 | wall,column,beam | 1,123.5 | Each Sqm | 400 ₹4,49,400 | 510 ₹5,72,985 | 370 ₹4,15,695 | 450 ₹5,05,575 | 380 ₹4,26,930 | 350 ₹3,93,225 | 390 ₹4,38,165 | 400 ₹4,49,400 | 550 ₹6,17,925 | 190 ₹2,13,465 Lowest | 550 ₹6,17,925 | 324 ₹3,64,014 | 357 ₹4,01,089.5 | 333 ₹3,74,125.5 | 600 ₹6,74,100 |
Tender Value
₹95.5 L
EMD Value
₹1.9 L
Closing Date
10 Apr 2026, 5:15 pmClosed
JAMINI KANTA MOHANTY, EE, HWDIII, PPA
JAMINI KANTA MOHANTY, EE, HWDIII, PPA
Construction of Compound wall along with demolition of structures of Paradip Marine service near Badapadia Market
2026_MoS_903178_1
CE/HWD-III/ACCTS-09/25/794
Open Tender
Civil Works
Works
240 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹3,000
Yes
AS PER E-TCN AND TD
₹1.9 L
Yes
29 May 2026
20 Mar 2026
13 Apr 2026
20 Mar 2026
10 Apr 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling brick masonry in lime or cement mortar under 4m height including stacking the useful materials for reuse and removing the debris within 50m cleaning the debrises with supply of all labour, T&P, staging, scaffolding, etc. complete with all taxes, including leads & lifts transportation & disposing at specified place and as per direction of Engineer-in-charge. | |||||
| 2Dismantling and removing R.C.C. columns, beams, slab, including stacking the useful materials for reuse and removing the debris within 50m with supply of all labour, T&P, staging, scaffolding, etc. complete cleaning the debrises with all taxes, including leads & lifts transportation & disposing at specified place and as per direction of Engineer-in-charge. | |||||
| 3Earth work in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles with supply of all material labour transporation , taxes , tollage , royalties,port entry fees etc all complete but excluding GST as directed by EIC | |||||
| 4Filling the low laying area with saline sand or dreged spoil as per required level in layer wise ,each layer not exceed 1mtr.,watering,compacting with VRR to achive OMC etc. complete excluding GST and as per direction of Engineer in charge. | |||||
| 5P.C.C(1:3:6) of using 20 mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope consolidating, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC | |||||
| 6Reinforced Cement concrete (1 cement:1.5 Coarse sand:3 chips) using 12mm to 20mm size C.B.H.G. chips of approved quality for all floors, foundation & plinth etc. of including mixing in a mixer machine, hoisting, laying in proper level, consolidating by mechanical vibrator,finished smooth to the form work and exposed surface, curing, water charges, including cost of all materials, labour, Transportation, all testing, engagement & hire charges of all mechaniries,T&P , tollage, royalties, all taxes excluding GST etc.all complete but excluding cost of reinforcement,formwork and bending/binding charges as directed by Engineer-in-charge. | |||||
| 7Supply Tor/TMT steel manufactured by Original steel manufacture company not for rolling mills minimum Steel of Grade - Fe 500, confirming to IS-1786 including, cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges,loading at one end & unloading at other end,T&P, all taxes,etc. all complete as per the direction of Engineer-in-charge but excluding GST. (NB: No Wastage shall be Paid, Steel Coefficient shall be considered as per IS1786 for Payment Purpose.) | |||||
| 8Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank & MS pipes, jacks and other accessories of approved quality for R.C.C. work for following structures and deshuttering, removing the same after due period with paining with coal tar /lubricants on the ply/steel surface after each use with supply of all materials, labour,transportation, T&P, all taxes, royalties, tollage, but excluding GST etc. complete as directed by Engineer-in-charge. | |||||
| 8.01 | Foundation plinth | - | Each Sqm | - | - |
| 8.02 | wall,column,beam | - | Each Sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_949318.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .