| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC | ₹14.3 L | L1 | Accepted-AOC BID ACCEPTED. HENCE, LOWEST L1 BIIDER |
| 2 | L2₹14.3 LRejected-AOC FIRST FLOOR 360 1 GREEN CITY KONDARASAMPALAYAM CHITHRAVUTHANPALAYAM DHARAPURAM TK TIRUPPUR 638657 | TIRUPPUR | TAMIL NADU | 638657 | ₹14.3 L | L2 | Rejected-AOC BID REJECTED. HENCE, HGHEST L2 BIIDER |
| Sl No | Description | Qty | Unit | SRI VELMURUGAN AND CO L1 | SRI SAKTHIVEL AND CO L2 |
|---|---|---|---|---|---|
| 1.00 | 1.Providing Cement Concrete Pavement From Subban House to Burial Ground East Street at Thottiyapalayam H/O Nathampaayam | 1 | nos | - | - |
| 2.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 118.42 | cum | 131 ₹15,513.02 | 140 ₹16,578.80 |
| 3.00 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,Complete | 72.58 | cum | 5,744.5 ₹4.2 L | 5,750 ₹4.2 L |
| 4.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 305.6 | sqm | 547.5 ₹1.7 L | 550 ₹1.7 L |
| 5.00 | Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 38.2 | cum | 7,158 ₹2.7 L | 7,160 ₹2.7 L |
| 6.00 | Cement Concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 42.98 | cum | 7,556 ₹3.2 L | 7,560 ₹3.2 L |
| 7.00 | Provision for Bituminous Tar Pad for expantion joints | 1 | nos | 10,000 ₹10,000 | 10,000 ₹10,000 |
| 8.00 | Provision for Name Board Charges | 1 | nos | 2,500 ₹2,500 | 2,500 ₹2,500 |
| 9.00 | Provision for Photos Charges | 1 | nos | 1,500 ₹1,500 | 1,500 ₹1,500 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 2,18,152 ₹2.2 L | 2,18,598 ₹2.2 L |
Tender Value
₹14.4 L
EMD Value
₹14,500
Closing Date
5 Jan 2026, 4:00 pmClosed
BDO VP
BDO Office Dharapuram
Providing CC Pavement from Subban House to Burial Ground At East Street Tottiyapalayam H/o Nathampalayam
2025_RDTN_637989_1
3426/2024/A5/Dharapuram
Open Tender
Civil Works
180 days
Dharapuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,500
Yes
12 Jan 2026
31 Dec 2025
5 Jan 2026
31 Dec 2025
5 Jan 2026
31 Dec 2025
Amount
1.Providing Cement Concrete Pavement From Subban House to Burial Ground East Street at Thottiyapalayam H/O Nathampaayam
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,Complete
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement Concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Provision for Bituminous Tar Pad for expantion joints
Provision for Name Board Charges
Provision for Photos Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SRI SAKTHIVEL AND CO (BID ID -1553715)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
tn.pdf
Tender Documents • 0.44 MB
BOQ_763540.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid