Tender Value
₹3.1 Cr
EMD Value
₹1.6 L
Closing Date
28 Jul 2026, 11:00 am2d left
Executive Engineer MIDC Division Kolhapur
1st Floor MIDC Office Udyog Bhavan Nagala Park Kolhapur
Khandala Ph I industrial Area Providing Infrastructure facilities of roads and water supply distribution line in Part II layout along forest boundary and connecting roads
2026_MIDC_1317517_1
27 of 2026
Open Tender
Civil Works
Percentage
Satara
Please refer Tender Document
15 documents required · 15 mandatory
₹24,780
₹1.6 L
13 Jul 2026
13 Jul 2026
29 Jul 2026
13 Jul 2026
28 Jul 2026
23 Jul 2026
13 Jul 2026 - 17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub Estimate No. :SE-2...Road & CD work | |||||
| 0.0 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. | 3,815 | Cubic Meter | 130.9 | ₹4,99,383.5 |
| 0.0 | Excavation for roadway in soft rock, including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading or stacking as directed. | 5,246 | Cubic Meter | 194.7 | ₹10,21,396.2 |
| 0.0 | Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment
or stacking as directed. | 5,777 | Cubic Meter | 1,560.9 | ₹90,17,319.3 |
| 0.0 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) | 1,575 | Cubic Meter | 1,084.9 | ₹17,08,717.5 |
| 0.0 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401
-- Plant Mix Method and Grading - I Material | 1,523 | Cubic Meter | 2,579.8 | ₹39,29,035.4 |
| 0.0 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader / Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - II Material | 1,523 | Cubic Meter | 2,579.8 | ₹39,29,035.4 |
| 8Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. | |||||
| 0.9 | Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 100% crusher broken metal with conical crusher plant heating and spraying the bitumen of specified grade @ 1.75 kg/sqm, spreading 12mm.size chips compacting with static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) | 10,150 | Square Meter | 244.85 | ₹24,85,227.5 |
| 0.0 | Providing and applying tack coat on the prepared surface heating by flames in Boiler and spraying bitumen with sprayer on Concrete surface treated with primer @ 3.25 kg/10 sqm (VG-30 bulk bitumen rates are considered to arrive at rates) | 10,150 | Square Meter | 22.7 | ₹2,30,405 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
TenderDocument.pdf
Tender Documents • 0.51 MB
ItemSpecification.pdf
Other Document • 0.06 MB
BOQ_2258572.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].