Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹11.9 L+₹1.0 L (9.48%)Admitted-Finance SC 79 A SHASTRI NAGAR THANA KAVINAGAR GHAZIABAD UTTAR PRADESH 201001 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Hariom Sharma L2 | M/S SHREE JEE CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Silt clearance including lift upto 1.50 mt. and lead upto 6 mt. by Poclain including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but including rough dressing. | 17,396.25 | Cum | 41 ₹7,13,246.25 | 36 ₹6,26,265 Lowest |
| 2.00 | Earth work in silt clearance with slush, lahel and cartage upto 1.0 Km. Including lift upto 1.50 mt. and lead upto 6 mt. by Poclain including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but including rough dressing . | 2,542 | Cum | 161 ₹4,09,262 | 160 ₹4,06,720 Lowest |
| 3.00 | Scrapping internal Section of Existing Channel i.e. Bed & Slope with silt upto 5 cm. | 13,467 | Sqm | 5 ₹67,335 | 4 ₹53,868 Lowest |
Tender Value
₹12.2 L
EMD Value
₹24,380
Closing Date
26 Sept 2026, 1:00 pmClosed
EE BGGC BSR
EE BGGC BSR
Silt Clearance of Main kalda Dy From Km 19.815 to km 34.500 and from km 40.500 to km 46.170
2026_UPIDC_1188144_32
04/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹24,380
1 Oct 2026
21 Sept 2026
26 Sept 2026
21 Sept 2026
26 Sept 2026
21 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance including lift upto 1.50 mt. and lead upto 6 mt. by Poclain including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but including rough dressing. | 17,396.25 | Cum | - | - |
| 2 | Earth work in silt clearance with slush, lahel and cartage upto 1.0 Km. Including lift upto 1.50 mt. and lead upto 6 mt. by Poclain including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but including rough dressing . | 2,542 | Cum | - | - |
| 3 | Scrapping internal Section of Existing Channel i.e. Bed & Slope with silt upto 5 cm. | 13,467 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.90 MB
BOQ_2238208.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .