| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 CrAccepted-AOC | ₹8.6 Cr | L1 | Accepted-AOC QUOTED LOWEST |
| 2 | L2₹10.1 CrRejected-Finance NO 17 WABAG HOUSE 200 FEET THORAIPAKKAM PALLAVARAM MAIN ROAD SUNNAMBU KOLATHUR CHENNAI KANCHIPURAM TAMIL NADU 600117 | CHENGALPATTU | TAMIL NADU | 600117 | ₹10.1 Cr | L2 | Rejected-Finance 2ND HIGHEST BID VALUE |
| 3 | L3₹10.1 CrRejected-Finance | ₹10.1 Cr | L3 | Rejected-Finance 3RD HIGHEST BID VALUE |
| 4 | L4₹10.3 CrRejected-Finance | ₹10.3 Cr | L4 | Rejected-Finance HIGHEST BID VALUE |
| 5 | Rejected-Technical 86 PURUSOTTAM ROY STREET KOLKATA 700007 | KOLKATA | WEST BENGAL | 700007 | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| Sl No | Description | Qty | Unit | Traders and Engineers Private Limited L4 | M/s, TRIGONE AND COMPANY L1 | VA Tech Wabag Limited L2 | Vishvaraj Environment Private Limited L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Operation & Maintenance of 60 MGD capacity Water Treatment Plant of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 60 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 60 MGD WTP. (For the period of first 12 months). | 12 | month | 27,47,750 ₹3.3 Cr | 22,89,781.48 ₹2.7 Cr | 26,90,500 ₹3.2 Cr | 27,01,945 ₹3.2 Cr |
| 1.10Labour component (Approx. 24.4% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till a new order (as per circular of mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the first increment will be in effect. | |||||||
| 1.20Other than labour component (Approx. 75.6% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till end of first twelve months. This also indicates the base cost upon which monthly cost of second year will be determined. | |||||||
| 2.00 | Operation & Maintenance of 60 MGD capacity Water Treatment Plant of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 60 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 60 MGD WTP. (For the period of first 12 months). | 12 | month | 28,51,614.95 ₹3.4 Cr | 23,76,335.22 ₹2.9 Cr | 27,92,200.9 ₹3.4 Cr | 28,04,078.52 ₹3.4 Cr |
| 2.10Labour component : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect. | |||||||
| 2.20Other than labour component : This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. | |||||||
| 3.00 | Operation & Maintenance of 60 MGD capacity Water Treatment Plant of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 60 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 60 MGD WTP. (For the period of first 12 months).. | 12 | month | 29,60,673.15 ₹3.6 Cr | 24,67,216.65 ₹3.0 Cr | 28,98,986.85 ₹3.5 Cr | 29,11,318.72 ₹3.5 Cr |
| 3.10Labour component : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect. | |||||||
| 3.20Other than labour component : This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. | |||||||
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
23 Aug 2025, 1:00 pmClosed
DIRECTOR GENERAL (WATER SUPPLY)
KOLKATA MUNICIPAL CORPORATION (H/Q), KOL-13
OPERATION AND MAINTENANCE OF 60 MGD CAPACITY WATER TREATMENT PLANT, PHASE- I ON ROUND THE CLOCK BASIS AT GARDEN REACH WATER WORKS (GRWW) FOR A PERIOD OF THREE YEARS.
2025_KMC_884784_1
KMC/WS/GRWW/T-12/2025-26
Open Tender
Project Work
1096 days
Garden Reach Water Works
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10 L
KOLKATA MUNICIPAL CORPORATION (H/Q), KOL-13
28 Mar 2026
1 Aug 2025
25 Aug 2025
1 Aug 2025
23 Aug 2025
1 Aug 2025
12 Aug 2025
Amount
Operation & Maintenance of 60 MGD capacity Water Treatment Plant of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 60 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 60 MGD WTP. (For the period of first 12 months).
Labour component (Approx. 24.4% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till a new order (as per circular of mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the first increment will be in effect.
Other than labour component (Approx. 75.6% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till end of first twelve months. This also indicates the base cost upon which monthly cost of second year will be determined.
Operation & Maintenance of 60 MGD capacity Water Treatment Plant of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 60 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 60 MGD WTP. (For the period of first 12 months).
Labour component : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect.
Other than labour component : This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined.
Operation & Maintenance of 60 MGD capacity Water Treatment Plant of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 60 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 60 MGD WTP. (For the period of first 12 months)..
Labour component : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect.
Other than labour component : This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined.
VA Tech Wabag Limited (BID ID -6859483)
Vishvaraj Environment Private Limited (BID ID -6862634)
Traders and Engineers Private Limited (BID ID -6850450)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
TECHBID.pdf
Tender Documents • 1.68 MB
BOQ_1995625.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid