Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.3 LAccepted-AOC | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected as L-3 | |
| 3 | Rejected-Technical CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | Rejected-Technical Rejected as L-2 |
Tender Value
₹17.0 L
EMD Value
₹21,300
Closing Date
11 Jul 2023, 5:00 pmClosed
Staff Officer (Mining)
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Sump cleaning of 17LE/1D,23LE/1D in VIB seam and 16LE/1D VII seam at Khairaha UG Mine,of Sohagpur Area
2023_SECL_282620_1
SECL/SGP/ET/23-24/620 dt30/06/2023
Open Tender
Civil Works - Others
Item Rate
180 days
khairaha UG Mine
As per NIT
8 documents required · 8 mandatory
₹21,300
5 Aug 2023
30 Jun 2023
13 Jul 2023
30 Jun 2023
11 Jul 2023
1 Jul 2023
30 Jun 2023 - 7 Jul 2023
Amount
Item Description/ Heading Part (A) labour Cost
(e) Cleaning/removal of malma/muck from UG sump and stacking within 50m distance or as per instruction of work incharge. (A)VII Seam- (1) 16 LE/1DE= 60.00 x [(4.60+4.80+4.70)/3] x [(1.20+1.10+0.95+1.15+0.85+0.90+1.10+1.00 1.05+0.85)/10]............... = 284.82 m3 (2) 15LE/1DE= 65.00 x [(4.65+4.80+4.75+4.60+4.70)/5] x[(1.10+0.95+1.05+1.00+0.85+0.90+0.80+0.90+1.00+ 1.05)/10] ..............= 293.28 m3 (3) 2DE/15L= 32.00x[(4.55+4.60+4.65)/3] x [(1.00+0.90+0.80+0.85+0.75)/5].= 126.59 m3 (4) 3DE/15L=30.00 x [(4.45+4.55+4.70+4.65)/4] x [(0.80+0.60+0.65+0.75)/4].= 96.39m3 (B)VIB Seam- (5) 17LE/1D= 35.00 x [(4.65+4.55+4.70+4.80)/4] x [(1.20+1.10+1.05+0.90+1.00+0.90)/6].= 166.72m3 (6) 16LE/1D= 30.00 x [(4.60+4.80+4.65+4.75)/4 x[(0.90+1.00+0.95+1.10+0.80+0.90)/6].....= 132.54m3 (7) 15LE/1D= 25.00 x [(4.55+4.65+4.60)/3] x [(1.05+0.90+0.80+0.95+0.85)/5].= 104.65 m3 (8) 2DE/15L= 18.00 x [(4.60+4.45+4.55)/3] x[(0.65+0.45+0.80+0.90)/4]= 57.08 m3 (9) 23LE/OD= 80.00 x [(4.40+4.60+4.55+4.45+4.60+4.70+4.55+4.45)/8] x [(0.90+0.70+0.85+1.00+0.95+0.80+0.75+0.95)/8] = 312.35 m3 (10) 22LE/OD= 77.00 x [(4.65+4.45+4.60+4.40+4.70+4.50+4.55+4.75)/8] x [(0.60+0.40+0.80+0.50+0.70+0.45+0.65+0.60)/8].= 207.61 m3 (11) 1DE/22L= 20.00 x [(4.60+4.70)/2] x [(0.60+0.40)/2].= 46.50 m3 (12) 2DE/22L= 18.00 x [(4.50+4.80)/2] x [(0.70+0.80)/2].= 62.78 m3 (13) 3DE/22L= 18.00 x [(4.55+4.75)/2] x [(0.90+0.70)/2]= 66.96 m3 (14) 4DE/22L= 18.00 x [(4.60+4.80)/2] x [(0.95+0.75)/2].= 71.91 m3 Total = 2030.18 m3
Total impact of GST for the purpose of CTC
Ram Awadh Singh
NAGENDRA KUMAR SINGH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .