Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | -41.10% | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.6 LAdmitted-Finance | -33.65% | ₹6.6 L | L2 | Admitted-Finance |
| 3 | L3₹7.3 LAdmitted-Finance | -27.50% | ₹7.3 L | L3 | Admitted-Finance |
| 4 | L4₹7.5 LAdmitted-Finance | -25.00% | ₹7.5 L | L4 | Admitted-Finance |
| 5 | L5₹7.9 LAdmitted-Finance | -21.10% | ₹7.9 L | L5 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
25 Apr 2026, 4:00 pmClosed
Executive Engineer
PWD RnB Division Bhaderwah
Permanent Restoration for Construction of Katyara to Kansar via Haddal.
2026_PWDJK_308152_2
e-NIT No. 10 of 2026-27 Dt. 18-04-2026
Open Tender
Civil Works
60 days
Bhaderwah
These documents are to be submitted as non-sensitive document from my document area of bidder
3 documents required · 3 mandatory
₹600
Executive Engineer
₹20,000
2 May 2026
18 Apr 2026
27 Apr 2026
18 Apr 2026
25 Apr 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge All kinds of soil | |||||
| 2Slip Clearance In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. | |||||
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 1 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 1 | Cum | 1 | ₹1 |
| 5 | Hand-packing stones in wire-crates; excluding cost of crates and including cost of stones | 1 | Cum | - | - |
| 6Supply of B.A. wire crates size 20' x 4' x 4' mesh size 4" x 4" dia of mesh 4mm | |||||
| 7Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | |||||
| 8Carriage of Materials | |||||
| 8.01 | Sand for an Avg. distance of 40 Kms by MT | - | Cum | - | - |
| 8.02 | Bajree for an Avg. distance of 40 Kms by MT | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_998967.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid