Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹10.9 L+₹1.4 L (14.1%)Admitted-Finance 2H 703 ANNAI THERESA NAGAR 2ND STREET TUTICORIN 628008 | TUTICORIN | TAMIL NADU | 628008 | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RELIABLE ENGINEERS L2 | K.Murugan Works Contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Sweeping and cleaning open space inside & around Pump house, Offices, Dispensery and other buildings and clear away the debris from the location including cost of broom sticks, baskets, labour, safety appliances , lead, lift etc., complete. | 95,133 | Sq.m | 0.8 ₹76,106.4 | 0.4 ₹38,053.2 Lowest |
| 2.00 | Thorough cleaning of cob web and dirts on wall inside, outside and ceiling of Pump House and other office buildings and clear away the debris from the location including cost of broom sticks, baskets, safety appliances, labour, lead, lift, etc., complete. | 747 | Rm | 3 ₹2,241 | 1.4 ₹1,045.8 Lowest |
| 3.00 | Cleaning the toilet & utilities in Pump House, Office and Dispensery building including cost of cleaning materials (brush, bleaching powder, phenoil, etc.) and labour for cleaning, safety appliances etc., complete. | 2,937 | Nos. | 20 ₹58,740 | 16 ₹46,992 Lowest |
| 4.00 | Cleaning of open drain in Pump House, Office and quaters building etc, and clearing away the debris from the location including cost of cleaning materials, bleaching powder,safety appliances labour, lead, lift, etc, complete. | 22,776 | rm | 2 ₹45,552 Lowest | 3 ₹68,328 |
| 5.00 | Cleaning the Inspection chamber\Manhole and clear away the debris from the location including cost of cleaning materials, bleaching powder, phenoil, labour, lead, safety appliances, lift, etc, complete. | 164 | nos | 150 ₹24,600 | 3 ₹492 Lowest |
| 6.00 | Cleaning of sewer line including removing the block wherever required and clear away the debris from the location including cost of cleaning materials, bleaching powder, phenoil, labour,safety appliances, lead, lift, etc, complete. | 1,528 | rm | 2.8 ₹4,278.4 Lowest | 4 ₹6,112 |
| 7.00 | Attending Masonry works / Carpentry works / Plumbing works including chipping, plastering, brick works and concreting works wherever required and clear away the debris from the location including cost of labour, lead, lift, T & P, safty appliances etc, complete. | 12 | ope | 1,350 ₹16,200 Lowest | 1,700 ₹20,400 |
| 8.00 | Maintenence of Dam by cleaning of Gallery, sweeping top of Dam etc works complete including cost of all materials, labour, safety appliances, lead, lift, T&P, transportation, etc complete. | 12 | ope | 730 ₹8,760 Lowest | 1,750 ₹21,000 |
| 9.00 | Maintenance of Main Water Tank Cleaning near Filter House including cost of all cleaning material, labour, safety appliances ,T&P etc Complete | 36 | nos | 730 ₹26,280 | 195 ₹7,020 Lowest |
| 10.00 | Maintenance of Water Tank Cleaning in Kodayar Pump House, Office Tank, etc including cost of all material, labour, safety appliances T&P etc Complete | 18 | Nos | 730 ₹13,140 | 450 ₹8,100 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,100
Closing Date
16 Sept 2026, 2:00 pmClosed
SE/Generation/TNGECL/Tin
maharaja nagar,Tirunelveli -11
maintenance work kodaiyar lower
2026_EB_700413_1
SE/GC/Tin/C12/2026-27
Open Tender
Maintenance Works
Works
365 days
kodayar
enclosed
2 documents required · 2 mandatory
₹0
₹12,100
Yes
10 Oct 2026
2 Sept 2026
17 Sept 2026
2 Sept 2026
16 Sept 2026
2 Sept 2026
2 Sept 2026 - 16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sweeping and cleaning open space inside & around Pump house, Offices, Dispensery and other buildings and clear away the debris from the location including cost of broom sticks, baskets, labour, safety appliances , lead, lift etc., complete. | 95,133 | Sq.m | 0.48 | ₹45,663.84 |
| 2 | Thorough cleaning of cob web and dirts on wall inside, outside and ceiling of Pump House and other office buildings and clear away the debris from the location including cost of broom sticks, baskets, safety appliances, labour, lead, lift, etc., complete. | 747 | Rm | 2.59 | ₹1,934.73 |
| 3 | Cleaning the toilet & utilities in Pump House, Office and Dispensery building including cost of cleaning materials (brush, bleaching powder, phenoil, etc.) and labour for cleaning, safety appliances etc., complete. | 2,937 | Nos. | 15.43 | ₹45,317.91 |
| 4 | Cleaning of open drain in Pump House, Office and quaters building etc, and clearing away the debris from the location including cost of cleaning materials, bleaching powder,safety appliances labour, lead, lift, etc, complete. | 22,776 | rm | 1.64 | ₹37,352.64 |
| 5 | Cleaning the Inspection chamber\Manhole and clear away the debris from the location including cost of cleaning materials, bleaching powder, phenoil, labour, lead, safety appliances, lift, etc, complete. | 164 | nos | 144.17 | ₹23,643.88 |
| 6 | Cleaning of sewer line including removing the block wherever required and clear away the debris from the location including cost of cleaning materials, bleaching powder, phenoil, labour,safety appliances, lead, lift, etc, complete. | 1,528 | rm | 2.26 | ₹3,453.28 |
| 7 | Attending Masonry works / Carpentry works / Plumbing works including chipping, plastering, brick works and concreting works wherever required and clear away the debris from the location including cost of labour, lead, lift, T & P, safty appliances etc, complete. | 12 | ope | 8,500 | ₹1,02,000 |
| 8 | Maintenence of Dam by cleaning of Gallery, sweeping top of Dam etc works complete including cost of all materials, labour, safety appliances, lead, lift, T&P, transportation, etc complete. | 12 | ope | - | - |
| 9 | Maintenance of Main Water Tank Cleaning near Filter House including cost of all cleaning material, labour, safety appliances ,T&P etc Complete | 36 | nos | 1 | ₹35.96 |
| 10 | Maintenance of Water Tank Cleaning in Kodayar Pump House, Office Tank, etc including cost of all material, labour, safety appliances T&P etc Complete | 18 | Nos | 1 | ₹17.98 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_842082.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .