Superintending Engineer
EDC, Ayodhya
Maintaning of 11 KV Feeder line ans Interpoling of Different Places, Incrising Capacity of Transformer and Cable Laying Under Electricity Distribution Division-IInd, Ayodhya
2023_MVVNL_849074_1
95 H(F)(W)/2023-24
Open Tender
Electrical Works
Item Wise
90 days
Faizabad
As Per Tender Specification
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EDC
₹2,000
25 Oct 2023
11 Oct 2023
18 Oct 2023
11 Oct 2023
17 Oct 2023
11 Oct 2023
Amount
Part - A ( Material) Following Material Supplied by the Contractor:-
Alluminum Lug
LT Clamp
LT Shackle Insulator
11 KV X- Arm Holding Clamp
11 KV F Clamp for PCC Pole
Holding Clamp Top & Dropper Channel
Nut & Bolt
Carriage including loading,unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 20 Kms. (distance approx)
PCC Pole 8.5 Mtr. Long
ST Pole 11 Mtr. Long
AB Cable (3x120+1x95+1x16)
ACSR Weasel Conductor
T/F 63 KVA
T/F 100 KVA
Other matching Materials
Dragging of PCC/ST Pole from dump site to pit site
Fabrication and Errection of Double Pole Support on PCC Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Single Pole Support on PCC Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Stringing, Sagging, Binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Stringing, Sagging, Binding and jumpering of AB Cable 3x120 Conductor as per RESSPO Norms
Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Mounting of 63 KVA Transformer as per RESSPO Norms.
Mounting of 100 KVA Transformer as per RESSPO Norms.
Rect. Back 25 KVA Transformer
Rect. Back 63 KVA Transformer
M/S ALOK CONSTRUCTION
ALOK KUMAR SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .