Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹7.6 L (6.19%)Admitted-Finance | ₹1.3 Cr+₹7.6 L (6.19%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹17.3 L (14.1%)Admitted-Finance | ₹1.4 Cr+₹17.3 L (14.1%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹21.1 L (17.2%)Admitted-Finance | ₹1.4 Cr+₹21.1 L (17.2%) | L4 | Admitted-Finance |
| 5 | L5₹1.7 Cr+₹45.2 L (36.9%)Admitted-Finance | ₹1.7 Cr+₹45.2 L (36.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SINGO ENGINEERING INDIA PRIVATE LIMITED L5 | Aakar Infra Engineers PVT Ltd L8 | DURGA MADHABA FABRICATION L3 | PADMABATI INFRAPROJECTS PVT. LTD. L7 | SUBRAT KUMAR BEHURA L4 | M/S BHAIRAB CHARAN SWAIN L1 | Naresh Chandra Bhatta L6 | P.S. Construction L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Engagement of following equipments/machinaries for cutting/dressing the heaped cargo mixed debrises or earths, dismantling of damaged RCC drain sections, structures etc for any other purpose & disposing the same away from worksite at designated place including Port entry fees, hire & running charges of equipments, fuel, lubricants, operation charge T&P, all taxes, operation expenses etc. all complete excluding GST and as per direction of Engineer in charge. NB: No idle hours shall be paid. | |||||||||||
| 1.01 | Excavator of 2 cum bucket capacity. | 120 | Each Hour | 1,205.83 ₹1,44,699.6 | 1,650 ₹1,98,000 | 1,500 ₹1,80,000 | 1,500 ₹1,80,000 | 1,600 ₹1,92,000 | 420 ₹50,400 Lowest | 1,400 ₹1,68,000 | 1,600 ₹1,92,000 |
| 1.02 | Tipper of 5 cum capacity for disposal of waste excavated materials | 120 | Each Hour | 594.46 ₹71,335.2 | 1,100 ₹1,32,000 | 400 ₹48,000 | 300 ₹36,000 | 700 ₹84,000 | 100 ₹12,000 Lowest | 400 ₹48,000 | 580 ₹69,600 |
| 2.00 | Filling with saline sand/dredged spoil up to required level including collecting, conveying by private trucks / dumpers with all lead and lifts, loading and unloading spreading and laying, watering, compacting by using VRR, dressing, leveling to required height, level and slope etc. with supply of all labour, materials, T&P, taxes, royalties, running & hire charges of VRR, trucks, dumpers, Port entry fees etc. complete excluding GST and as per direction of Engineer in charge.
N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity. | 13,490 | Each Cum | 800 ₹1,07,92,000 | 750 ₹1,01,17,500 | 380 ₹51,26,200 | 160 ₹21,58,400 | 170 ₹22,93,300 | 139 ₹18,75,110 Lowest | 160 ₹21,58,400 | 140 ₹18,88,600 |
| 3.00 | Collecting, Conveying, Supplying and transportation of Quarry Dust of approved quality, conveying the same by private Trucks including loading, unloading, spreading quarry dust over the approved surface in suitable layers, compacting with VRR for both Dry & Wet rolling all complete including cost of all materials, labour, T&P, royalties, Taxes, hire & running charges of all equipments, Port entry fees, operator expenses cost of water, fuel, lubricants etc all complete excluding GST and as directed by the Engineer in charge. | 3,163.5 | Each Cum | 849.38 ₹26,87,013.63 | 1,150 ₹36,38,025 | 650 ₹20,56,275 | 950 ₹30,05,325 | 800 ₹25,30,800 | 500 ₹15,81,750 Lowest | 1,000 ₹31,63,500 | 780 ₹24,67,530 |
| 4.00 | Collecting,conveying and supplying of broken hard soling stone of 15cm & above size of approved quality other than granite or laterite laying in layers on the existing profile to proper grade & camber and collecting required quantity of moorum for filling the interstics of soling, watering, consolidating by PRR with supply of all materials, labour, T&P, hire & running charges of all equipments, Port entry fees, operator expenses cost of water, fuel, lubricants etc all complete excluding GST and as directed by the Engineer in charge.
N.B: Payment will be made basing on the initial & final level after through compaction | 7,208 | Each Cum | 232.37 ₹16,74,922.96 Lowest | 1,250 ₹90,10,000 | 780 ₹56,22,240 | 1,550 ₹1,11,72,400 | 1,100 ₹79,28,800 | 1,050 ₹75,68,400 | 1,350 ₹97,30,800 | 980 ₹70,63,840 |
| 5.00 | Collecting, Conveying, Supplying & Spreading of good laterite moorum of approved quality , laying over the compacted surface to required slope, compacting by PRR including supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, royalties, Taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge. | 1,054.5 | Each Cum | 423 ₹4,46,053.5 Lowest | 650 ₹6,85,425 | 600 ₹6,32,700 | 1,100 ₹11,59,950 | 900 ₹9,49,050 | 790 ₹8,33,055 | 1,150 ₹12,12,675 | 950 ₹10,01,775 |
| 6.00 | Dewatering the stagnated seepage water from the excavated areas using Diesel pump sets, discharging water to near by drains, basins and other points by sufficient length delivery pipe, including supply of all labour, T&P, all taxes, hire and running charges of pump, transportation of pumps from one location to other location, all POL, suction and delivery pipe, engagement of pump operator in all three shifts as and when required etc. complete excluding GST and as directed by Engineer in charge.
NB : No idle hours shall be paid. | 160 | Each Hour | 1,128 ₹1,80,480 | 240 ₹38,400 | 100 ₹16,000 | 100 ₹16,000 | 40 ₹6,400 Lowest | 40 ₹6,400 Lowest | 45 ₹7,200 | 60 ₹9,600 |
| 7.00 | Cement concrete of M-20 grade (using Crusher broken hard granite chips of 12 mm to 20.0 mm size of approved quality for R.C.C work), mixing in a Batching Plant of required capacity, transporting the concrete by any approved means including admixture in recommended proportion as per IS-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with hoisting, laying, compacting by mechanical Vibrator, curing etc. with supply of all materials, labour, T&P, all taxes, Port entry fees, royalties, tollage, all transportation charges, all testing, cost for design mix, engagement, hire & running charges of all machineries, operator expences etc. all complete excluding GST and as directed by Engineer in charge.
N.B: The item is excluding cost of form work, cost of binding wire, cost of Steel & labour charges for bending & binding of steel. | 34 | Each Cum | 8,000 ₹2,72,000 | 5,800 ₹1,97,200 | 4,000 ₹1,36,000 | 6,500 ₹2,21,000 | 4,600 ₹1,56,400 | 3,980 ₹1,35,320 Lowest | 4,300 ₹1,46,200 | 4,000 ₹1,36,000 |
| 8.00 | Supply of Fe-500 steel confirming to I.S. Specifications including cutting, straightening, bending, binding & placing the grills in position for RCC works including cost of binding wire of 18 to 20 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge.
N.B: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid. | 30.6 | Each Qntl. | 10,000 ₹3,06,000 | 8,500 ₹2,60,100 | 4,500 ₹1,37,700 Lowest | 6,300 ₹1,92,780 | 6,200 ₹1,89,720 | 5,200 ₹1,59,120 | 6,000 ₹1,83,600 | 5,200 ₹1,59,120 |
Tender Value
₹1.5 Cr
Closing Date
13 Sept 2021, 5:15 pmClosed
G. D. Sethy ,EE ,HWD-I,PPT
Office of the Harbour Works Division No.I, Engineering Department, Paradip Port Trust, First Floor, Administrative Building, Tele -06722-222020 Mob-9437120010
Improvement work of Manual Iron Ore Plot between Indira Park Road and Concor Warehouse near Old Gate No.2.
2021_MoS_644453_1
CE/HWDI/ACCTS-19/20/338
Open Tender
Civil Works
Works
240 days
Paradip
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
Yes
As per eTCN and TD.
Exempted
20 Dec 2021
20 Aug 2021
14 Sept 2021
20 Aug 2021
13 Sept 2021
20 Aug 2021
Amount
Engagement of following equipments/machinaries for cutting/dressing the heaped cargo mixed debrises or earths, dismantling of damaged RCC drain sections, structures etc for any other purpose & disposing the same away from worksite at designated place including Port entry fees, hire & running charges of equipments, fuel, lubricants, operation charge T&P, all taxes, operation expenses etc. all complete excluding GST and as per direction of Engineer in charge. NB: No idle hours shall be paid.
Excavator of 2 cum bucket capacity.
Tipper of 5 cum capacity for disposal of waste excavated materials
Filling with saline sand/dredged spoil up to required level including collecting, conveying by private trucks / dumpers with all lead and lifts, loading and unloading spreading and laying, watering, compacting by using VRR, dressing, leveling to required height, level and slope etc. with supply of all labour, materials, T&P, taxes, royalties, running & hire charges of VRR, trucks, dumpers, Port entry fees etc. complete excluding GST and as per direction of Engineer in charge. N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity.
Collecting, Conveying, Supplying and transportation of Quarry Dust of approved quality, conveying the same by private Trucks including loading, unloading, spreading quarry dust over the approved surface in suitable layers, compacting with VRR for both Dry & Wet rolling all complete including cost of all materials, labour, T&P, royalties, Taxes, hire & running charges of all equipments, Port entry fees, operator expenses cost of water, fuel, lubricants etc all complete excluding GST and as directed by the Engineer in charge.
Collecting,conveying and supplying of broken hard soling stone of 15cm & above size of approved quality other than granite or laterite laying in layers on the existing profile to proper grade & camber and collecting required quantity of moorum for filling the interstics of soling, watering, consolidating by PRR with supply of all materials, labour, T&P, hire & running charges of all equipments, Port entry fees, operator expenses cost of water, fuel, lubricants etc all complete excluding GST and as directed by the Engineer in charge. N.B: Payment will be made basing on the initial & final level after through compaction
Collecting, Conveying, Supplying & Spreading of good laterite moorum of approved quality , laying over the compacted surface to required slope, compacting by PRR including supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, royalties, Taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge.
Dewatering the stagnated seepage water from the excavated areas using Diesel pump sets, discharging water to near by drains, basins and other points by sufficient length delivery pipe, including supply of all labour, T&P, all taxes, hire and running charges of pump, transportation of pumps from one location to other location, all POL, suction and delivery pipe, engagement of pump operator in all three shifts as and when required etc. complete excluding GST and as directed by Engineer in charge. NB : No idle hours shall be paid.
Cement concrete of M-20 grade (using Crusher broken hard granite chips of 12 mm to 20.0 mm size of approved quality for R.C.C work), mixing in a Batching Plant of required capacity, transporting the concrete by any approved means including admixture in recommended proportion as per IS-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with hoisting, laying, compacting by mechanical Vibrator, curing etc. with supply of all materials, labour, T&P, all taxes, Port entry fees, royalties, tollage, all transportation charges, all testing, cost for design mix, engagement, hire & running charges of all machineries, operator expences etc. all complete excluding GST and as directed by Engineer in charge. N.B: The item is excluding cost of form work, cost of binding wire, cost of Steel & labour charges for bending & binding of steel.
Supply of Fe-500 steel confirming to I.S. Specifications including cutting, straightening, bending, binding & placing the grills in position for RCC works including cost of binding wire of 18 to 20 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge. N.B: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid.
Providing Rigid and smooth leak proof centering & shuttering for RCC works in slabs/foundation plinth including dismantling them after setting period with cost of all material, labour, T&P, taxes, tollage, gate entry fees etc all complete excluding GST and as per direction of Engineer in charge.
P.S. Construction
DURGA MADHABA FABRICATION
SUBRAT KUMAR BEHURA
SINGO ENGINEERING INDIA PRIVATE LIMITED
Naresh Chandra Bhatta
PADMABATI INFRAPROJECTS PVT. LTD.
Aakar Infra Engineers PVT Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
ImpvPlot_TD.pdf
Tender Documents • 1.21 MB
BOQ_678331.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .