| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | -25.50% | ₹5.7 L | L1 | Admitted-Finance |
| 2 | L2₹7.3 LAdmitted-Finance | -5.00% | ₹7.3 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-As request letter submit by the bidder, who failed to note the condition of e-NIT regarding commencement of work after opening of the FB, considering the emergent nature of the work, his request has been considered, however bid has not been admitted |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-As request letter submit by the bidder, who failed to note the condition of e-NIT regarding commencement of work after opening of the FB, considering the emergent nature of the work, request has been considered, however the bid has not been admitted |
Tender Value
₹7.7 L
EMD Value
₹15,400
Closing Date
9 Apr 2026, 6:00 pmClosed
Er Parvez Malik
PWD Div Jammu East
Preparation of MA Stadium for the function under Nasha Mukth Bharat Abhiyan alongwith route of the rally
2026_PWDJK_307342_1
01 of 2026-2027 Dated 04-04-2026
Open Tender
Civil Works
5 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
as per NIT
₹15,400
10 Apr 2026
4 Apr 2026
10 Apr 2026
4 Apr 2026
9 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work. | - | Sqm | - | - |
| 2 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | - | Kg | - | - |
| 3 | Finishing walls with water proofing cement paint of required shade: Old work (one or more coats applied @ 2.20 kg/10sqm) over priming coat of primer applied @ 0.80 liters/10sqm complete including cost of priming coat. | - | Sqm | - | - |
| 4 | White washing with lime to give an even shade : Old work (two or more coats) | - | Sqm | - | - |
| 5 | Supply of material and errection of temporary sheds and santry posts for Security forces for days as per requirement of security forces which includes supply of 10 feet balli of suitable dia, including digging of pits of suitable depth for stability of temporary structure, errection of frame structure with ballies by way of using nails/binding wire as per the site requirement and fixing of CGI sheet with nails as desired by the Security forces and directed by the Engineer-in-charge including covering with Tarpaulin sheet on roof and sides by covering all sides with sand bags upto the height of 4'-6'' to 5'-0'' except doors for entrance as per the requirement of security forces and dismentaling the same along with removal of the material outside the periphery of the site all job complete. (Area enclosed by sand bags will be measured for payment) | - | Sft | - | - |
| 6 | Supply of material and errection of temporary sheds for frisking points as per the required days of Security forces which includes supply of 10 feet balli of suitable dia, including digging of pits of suitable depth for stability of temporary structure, errection of frame structure with ballies by way of using nails/binding wire as per the site requirement and fixing of CGI sheet with nails as desired by the Security forces and directed by the Engineer-in-charge including covering with Tarpaulin sheet on roof and sides as per the requirement of security forces and dismentaling the same along with removal of the material outside the periphery of the site all job complete. (Area enclosed by outer ballies will be measured for payment) | - | Sft | - | - |
| 7 | Supply of spung sheet of 3 feet X 6 feet x 4 inches | - | No. | - | - |
| 8 | Supply of sufficient labour for 8 working hours in a day along with passport size photographs and adhar cards and police verification of the persons as desired by the security forces for baricating and allied works. | - | No. | - | - |
| 9 | River bed material (RBM) filling including carriage, supply, filling, rolling, complete job as per the direction of Engineer-in-charge. | - | Cum | - | - |
| 10 | Supplying, stacking at site graded crushed stone aggregate of size 13.20mm nominal size (Type A) and crusher dust (In Ratio 70%,30%) laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fill up interstices of coarse aggregate, watering and compacting. | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_997183.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid