| 1 | 1₹3.9 LAccepted-AOC 2 116 K KARSHINI ILLAM NEW SUNDARAM NAGAR WEST KORAMPALLAM TUTICORIN 628 101 | TUTICORIN | TAMIL NADU | 628101 | 1 | Accepted-AOC L1 | |
| 2 | 2₹4.8 L+₹39,752 (9.12%)Rejected-AOC 5 57 CALDWELL COLONY 1ST STREET TUTICORIN 628 008 | TUTICORIN | TAMIL NADU | 628008 | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹5,300
Closing Date
3 Jul 2023, 2:00 pmClosed
SE/M.II/TTPS
Superintending Engineer, Mechanical-II, Tuticorin Thermal Power Station, Tuticorin
TTPS MII AHP Unit IV Overhauling and replacement of valves spool piece rubber expansion bellow flushing apparatus jetting nozzle etc in Unit IV ECO APH BAH and chimney hoppers during the forthcoming overhaul
2023_EB_329134_1
SE/M.II/TTPS/No.196/2023-2024
Open Tender
Miscellaneous Works
Item Rate
20 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹5,300
Yes
2 Dec 2023
17 Jun 2023
4 Jul 2023
17 Jun 2023
3 Jul 2023
17 Jun 2023
Charges for changing worn-out / overhauling of 300/250/200 NB valves at ECO and APH hopper and other location including cost of welding rod, consumables and T&Ps etc.,.
Charges for changing worn-out /overhauling of 150/100 NB valves at ECO and other location including cost of consumables and hire charges for T&Ps.,
Charges for changing valves/ Overhauling of 50/40 NB diaphragm/ ball valve in ECO, APH and BAH hopper location including cost of welding rod , T&Ps hire charges etc.,
Charges for dismantling of worn-out expansion bellow, M.S sleeve and assembling of same (or) new expansion bellow and sleeve including consumables and T&Ps etc complete.
Charges for changing W/O 150NB Bend 90˚/45˚, equal Tees, Reducers in APH, ECO and BAH hopper as per site condition including cost of consumables like gas, T&P’s hire charges.
Charges for fabrication of 150 bend (90˚/45˚) equal /unequal Tee as per site condition including cost of cutting gas welding rod, consumables and hire charges for T&P etc., complete.
Charges for fabrication of 150 NB flange including cost of cutting gas, consumables and T&Ps etc complete.
Charges for dismantling and re erection of 150 NB pipe lines with proper supports including cost of cutting gas, welding rods consumables and T&Ps etc complete.
Charges for welding of 150 NB flanges in 150NB M.S pipe, bends /spool pieces including cost of cutting gas, welding rods consumables and T&Ps etc complete.
Charges for fabrication of 250 /200 NB elbow 90˚/45˚ as per site condition including cost of cutting gas, welding rods consumables and T&Ps etc complete.
Charges for dismantling of quenching nozzle with holder wonrout, changing (or) choke releasing and cleaning and assembling of same including cost of welding rod, consumables and T&P etc.
Charges for dismantling the BAH jetting nozzle assembly cleaning and reassembling with new/same including cost of transportation, welding electrodes, cutting gas T&Ps.,
Charges for works for changing wornout 250NB/200NB Bend 90˚/45˚ as per site Condition in APH and Eco hopper and including cost of cutting gas, T&P hire Charges etc.,
Charges for cutting and dismantling the existing wornout structurals supports from Unit IV BAH and transporting the same to stores and devolution including all consumables like cutting gas and hire charges for T&P’s etc.,
Charges for fabrication and erection of structuals supports in Unit IV BAH including all consumable and hire charges for T&P’s etc., complete.
Charges for painting pipe lines, fittings with two coats of good quality enamel paint including consumables etc., complete.
Charges for dismantling of rubber expansion bellow / spool piece and flushing apparatus and its sea water line from cleaning slag deposits from flushing apparatus, changing worn-out rubber expansion bellow, M.S sleeve, flushing apparatus, etc and reassembling the same /new after completion of water washing including cost of consumables like M.S bolts & nut, cutting gas and hire charges for T&Ps complete.
Charges for removing the flushing apparatus inside chimney and overhauling and renewal of spares if necessary and cleaning with fire service hose including cost of welding rod, consumables and T&Ps etc.,
Charges for dismantling the sealing assembly of Eco hopper flushing apparatus after releasing the distance piece, removing lowering and cleaning the flushing apparatus and seal trough free flow slag, foreign materials, reassembling the same after completion of Economizer work including cost of consumables and hire charges for T&Ps.,
Charges for painting newly erected structural supports in Unit IV BAH with one coat red - oxide and two coats of good quality enamel paint including consumables etc., complete.
KUMAAR ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .