Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.3 LAdmitted-Finance | -1.51% | ₹16.3 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Not Qualified as agency fulfills the eligibility criteria as per NIT |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Not Qualified as agency fulfills the eligibility criteria as per NIT |
Tender Value
₹16.6 L
EMD Value
₹33,107
Closing Date
23 May 2026, 3:00 pmClosed
EXECUTIVE ENGINEER (E)
EE(E), Electrical Division-3, Siri Fort, Behind Gargi College New Delhi-49
Running Maintenance and Operation of STP and RO System at Dwarka Sports Complex Sector-17
2026_DDA_908598_1
04/EE/ELD-3/DDA/2026-27
Open Tender
Electrical Works
Percentage
365 days
As Per Tender Document
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹33,107
EE(E), Electrical Division-3, Siri Fort, Behind Ga
16 Jun 2026
13 May 2026
25 May 2026
13 May 2026
23 May 2026
14 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sub Head-I STP
Running, maintenance & Operation of STP System as per details of installations given in Annexure-A i/c routine and preventive maintenance as per Annexure-B by deploying one no. Operator in each shift (total 2 shift, 9 am to 5pm & 9 pm to 5pm) & 1 nos. helper for general shift. | 12 | Per Month | 1,15,826 | ₹13,89,912 |
| 2 | Requirement of chemicals i.e. Polyelectrolyte, Die Aluminium Chloride, Sodium Hypochloride (12% concentration), ACF Carbon, chlorine for disinfection & oil and grease for motor lubricating for operation of 50 KLD STP plant. | 12 | Per Month | 8,500 | ₹1,02,000 |
| 3 | Sub Head-II RO
Maintenance Contract for RO 150/50 L.P.H (Summer Session)
Details of installation are given in Annexure A & schedule of routine | 8 | Per Month | 9,694 | ₹77,552 |
| 4 | Maintenance Contract for RO 150/50 L.P.H (Lean Period / Winter Session)
Details of installation are given in Annexure A & schedule of routine | 4 | Per Month | 4,847 | ₹19,388 |
| 5 | Supply and Replacement of following parts of 150/50 L.P.H connection testing etc. as required. a) RO Booster Pump | 5 | Each | 2,125 | ₹10,625 |
| 5.01 | b) Adapter 24 to 48 Volt | 6 | Each | 935 | ₹5,610 |
| 5.02 | c) Membranes | 16 | Each | 1,785 | ₹28,560 |
| 5.03 | d) Carbon Filter (20”) Set | 8 | Each | 1,190 | ₹9,520 |
| 5.04 | e) Carbon Filter (10”) Se | 8 | Each | 850 | ₹6,800 |
| 5.05 | f) Pipe 1/4 or 1/3 inches | 20 | Meter | 13 | ₹260 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.56 MB
BOQ_954950.xls
BOQ • 0.73 MB
NIT.pdf
Tender Documents • 4.90 MB
Corrigendum1.pdf
PDF • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .