Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-Finance | L1 | Accepted-Finance Agreement With L1 | |
| 2 | L2₹20.5 L+₹841.80 (0.04%)Rejected-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | L2 | Rejected-Finance Agreement With L1 | |
| 3 | L3₹20.5 L+₹4,112.23 (0.20%)Rejected-Finance | L3 | Rejected-Finance Agreement With L1 | |
| 4 | L4₹20.8 L+₹34,747.77 (1.70%)Rejected-Finance | L4 | Rejected-Finance Agreement With L1 |
| Sl No | Description | Qty | Unit | ARTIST BRO L2 | MITTAL BROTHERS L1 | M/S MOHD. IDRIS CONTRACTOR L3 | M/S YOGESH ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge | 29.21 | Cum | 500 ₹14,605 | 500 ₹14,605 | 500 ₹14,605 | 431.85 ₹12,614.34 Lowest |
| 2.00 | Dismantling reinforced cement concrete including stacking of material including all cost of material, labour and T&P etc complete | 8.42 | Cum | 700 ₹5,892.6 | 600 ₹5,050.8 | 600 ₹5,050.8 | 527.73 ₹4,442.43 Lowest |
| 3.00 | Earth work in foundation in dry ordinary soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as dircted by Engg.-in-Charge. | 99.4 | Cum | 100 ₹9,940 | 100 ₹9,940 | 50 ₹4,970 Lowest | 83.36 ₹8,285.98 |
| 4.00 | Earth work for filling in Approch road and strengthening of banks & diversion including all lift and all lead with ramming and dressing, proper completion of work as per direction of Engineer-in-charge. | 641.8 | Cum | 50 ₹32,090 Lowest | 50 ₹32,090 Lowest | 80 ₹51,344 | 83.36 ₹53,500.45 |
| 5.00 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete. | 265.42 | Sqm | 500 ₹1,32,711 Lowest | 500 ₹1,32,711 Lowest | 786 ₹2,08,621.69 | 671 ₹1,78,098.16 |
| 6.00 | Providing and laying C.C. (A-20M15)(1:2:4) including all cost of materials, labour and T&P etc complete. | 20.76 | Cum | 5,000 ₹1,03,805 | 5,000 ₹1,03,805 | 4,786 ₹99,362.15 Lowest | 5,395 ₹1,12,005.6 |
| 7.00 | Providing and laying R.C.C. (A-20M25)(1:1:2) including all cost of materials, labour and T&P etc complete. | 129.23 | Cum | 6,300 ₹8,14,123.8 | 6,300 ₹8,14,123.8 | 5,786 ₹7,47,701.64 Lowest | 6,900 ₹8,91,659.4 |
| 8.00 | Supplying & Laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete as per direction of Engineer-in-charge | 9.54 | M.T. | 73,000 ₹6,96,347 | 73,000 ₹6,96,347 | 69,786 ₹6,65,688.65 | 60,505 ₹5,77,157.19 Lowest |
| 9.00 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark including all cost of materials, T&P and labour etc. | 2.2 | R.M. | 200 ₹440 Lowest | 200 ₹440 Lowest | 250 ₹550 | 233 ₹512.6 |
| 10.00 | Providing & laying 1st class (M-150) Brick work pitching in 1:4 with cement mortar including all cost of materials, labour and T&P etc complete. | 42.43 | Cum | 4,900 ₹2,07,926.6 Lowest | 4,900 ₹2,07,926.6 Lowest | 5,100 ₹2,16,413.4 | 4,900 ₹2,07,926.6 Lowest |
Tender Value
₹24.9 L
EMD Value
₹49,840
Closing Date
24 Aug 2026, 11:00 amClosed
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-04/EE/2026-27 Reconstruction work (box culvert) of the damaged bridge located at km 3.443 of Rajwaha Anti. Lot No-02
2026_UPIDC_1176734_2
TN-04/EE/2026-27
Open Tender
Civil Works
Piece-work
90 days
As Per NIT
As per NIT And TD
3 documents required · 3 mandatory
₹944
₹49,840
25 Sept 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge | - | Cum | - | - |
| 2 | Dismantling reinforced cement concrete including stacking of material including all cost of material, labour and T&P etc complete | 1 | Cum | - | - |
| 3 | Earth work in foundation in dry ordinary soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as dircted by Engg.-in-Charge. | - | Cum | - | - |
| 4 | Earth work for filling in Approch road and strengthening of banks & diversion including all lift and all lead with ramming and dressing, proper completion of work as per direction of Engineer-in-charge. | 1 | Cum | - | - |
| 5 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete. | 0.8 | Sqm | - | - |
| 6 | Providing and laying C.C. (A-20M15)(1:2:4) including all cost of materials, labour and T&P etc complete. | 1 | Cum | - | - |
| 7 | Providing and laying R.C.C. (A-20M25)(1:1:2) including all cost of materials, labour and T&P etc complete. | 0.4 | Cum | - | - |
| 8 | Supplying & Laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete as per direction of Engineer-in-charge | 1 | M.T. | - | - |
| 9 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark including all cost of materials, T&P and labour etc. | - | R.M. | - | - |
| 10 | Providing & laying 1st class (M-150) Brick work pitching in 1:4 with cement mortar including all cost of materials, labour and T&P etc complete. | 1 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.28 MB
Tendernotice_2.pdf
PDF • 1.99 MB
BOQ_2211296.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .