| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-Finance | ₹16.3 L | L1 | Accepted-Finance as per financial evaluation |
| 2 | L2₹16.6 LRejected-Finance | ₹16.6 L | L2 | Rejected-Finance as per financial evaluation |
| Sl No | Description | Qty | Unit | AJS Contractors L1 | Annamar Karthi Constructions L2 |
|---|---|---|---|---|---|
| 1.00Strengthening the existing wornout BT road in front of E,F&C Godown at SAGOSERVE ,Salem | |||||
| 2.00Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m | |||||
| 3.00 | KM 0/0 - 0/090 | 297 | m2 | 22.19 ₹6,590.43 | 22.66 ₹6,730.02 |
| 4.00collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. | |||||
| 5.00 | KM 0/0 - 0/090 | 8.02 | m2 | 139.83 ₹1,121.44 | 142.77 ₹1,145.02 |
| 6.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 7.00 | KM 0/0 - 0/090 | 222.75 | m3 | 2,308.87 ₹5.1 L | 2,358.5 ₹5.3 L |
| 8.00Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | |||||
| 9.00 | KM 0/0 - 0/090 | 891 | m2 | 82.34 ₹73,364.94 | 84.07 ₹74,906.37 |
| 10.00Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | |||||
Tender Value
₹17.3 L
EMD Value
₹34,620
Closing Date
2 Mar 2026, 3:00 pmClosed
Karthikeyan S
BDO VP salem
Salem Block - Sagoserve General Fund 2025-26- Strengthening the existing wornout BT road in front of E,F and C Godown at SAGOSERVE ,Salem
2026_RDTN_666306_1
205-2026-T1
Open Tender
Civil Works - Roads
BDO Office
as per document
3 documents required · 3 mandatory
₹0
₹34,620
Yes
4 Mar 2026
25 Feb 2026
2 Mar 2026
25 Feb 2026
2 Mar 2026
25 Feb 2026
Strengthening the existing wornout BT road in front of E,F&C Godown at SAGOSERVE ,Salem
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
01.pdf
Tender Documents • 0.78 MB
BOQ_800352.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid