| 1.00Strenthening to Arpisampalayam to Thathampalayam Road at Arpisampalayam Panchayat km 0/0 - 1/0 | |||||
| 1.01 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. | 1,200 | M 2 | 5 ₹6,000 | 10 ₹12,000 |
| 1.02 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal (Pot Holes Less than 25mm thick) | 18.38 | M 2 | 4,715.38 ₹86,668.68 | 7,000 ₹1.3 L |
| 1.03 | Applying tack coat over BT surface (not treated with primer) using 3.00Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. (Pot Holes) | 3,750 | M 2 | 33.4 ₹1.3 L | 33.4 ₹1.3 L |
| 1.04 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 93.75 | M 3 | 11,214.25 ₹10.5 L | 11,214.25 ₹10.5 L |
| 1.05 | Provision for KM Stones. | 1 | each | 2,197 ₹2,197 | 2,197 ₹2,197 |
| 1.06 | Provision for HM Stones of Size 75x23x10cm | 4 | each | 574.65 ₹2,298.60 | 574.65 ₹2,298.60 |
| 1.07 | Provision for 60Cm Equilateral Triangular Sign board Charges | 1 | each | 4,999 ₹4,999 | 4,999 ₹4,999 |
| 1.08 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,30,175 ₹2.3 L | 2,38,813 ₹2.4 L |
Tender Value
₹15.3 L
EMD Value
₹15,280
Closing Date
27 Nov 2025, 3:00 pmClosed
BDO BP
BDO Office Kandamangalam
Rural Road Maintanance 2025-26
2025_RDTN_625376_1
Rural Road Maintanance 2025-26
Open Tender
Civil Works
90 days
Kandamangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,280
Yes
8 May 2026
21 Nov 2025
27 Nov 2025
21 Nov 2025
27 Nov 2025
21 Nov 2025
Amount
Strenthening to Arpisampalayam to Thathampalayam Road at Arpisampalayam Panchayat km 0/0 - 1/0
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal (Pot Holes Less than 25mm thick)
Applying tack coat over BT surface (not treated with primer) using 3.00Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. (Pot Holes)
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for KM Stones.
Provision for HM Stones of Size 75x23x10cm
Provision for 60Cm Equilateral Triangular Sign board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Arulgnanam Contractor (BID ID -1521878)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
TenderNotice.pdf
Additional Documents • 1.05 MB
BOQ_747832.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid