| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.9 LRejected-AOC | ₹4.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K SEKAR L2 | V KARTHIKEYAN L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF DRAINAGE AND COVER SLAB AT PUES SCHOOL IN KODAIKKAL MOTTUR H/O KODAIKKAL PANCHAYAT IN SHOLINGHUR BLOCK RANIPET DISTRICT | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per | 40.8 | Cum | 263.78 ₹10,762.22 | 263.7 ₹10,758.96 |
| 3.00 | Cement concretel:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc. | 10 | Cum | 5,612.64 ₹56,126.40 | 5,612.6 ₹56,126 |
| 4.00 | Supplying and erecting centering for sides and soffits including cost and conveyance of materials and all labour charges. | 165 | Sqm | 547.5 ₹90,337.50 | 547 ₹90,255 |
| 5.00 | Cement concretel:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc. | 13.8 | Cum | 6,380.8 ₹88,055.04 | 6,380 ₹88,044 |
| 6.00 | Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete | 30 | Sqm | 594.51 ₹17,835.30 | 594.5 ₹17,835 |
| 7.00 | Cement concrete1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc. | 2.4 | Cum | 7,012.03 ₹16,828.87 | 7,012 ₹16,828.80 |
| 8.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 0.51 | Mt | 91,924.1 ₹46,421.67 | 91,524.1 ₹46,219.67 |
| 9.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 9.54 | Cum | 9,655.17 ₹92,110.32 | 9,655.17 ₹92,110.32 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 75,325.92 ₹75,325.92 | 75,272 ₹75,272 |
Updated dates
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
28 Oct 2025, 3:00 pmClosed
BDO BP
Panchayat Unon Sholinghur
CONSTRUCTION OF DRAINAGE AND COVER SLAB AT PUES SCHOOL IN KODAIKKAL MOTTUR H/O KODAIKKAL PANCHAYAT IN SHOLINGHUR BLOCK RANIPET DISTRICT
2025_RDTN_614258_1
A2/719/2025
Open Tender
Civil Works
180 days
Sholinghur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,000
Yes
10 Dec 2025
15 Oct 2025
28 Oct 2025
15 Oct 2025
28 Oct 2025
15 Oct 2025
Amount
CONSTRUCTION OF DRAINAGE AND COVER SLAB AT PUES SCHOOL IN KODAIKKAL MOTTUR H/O KODAIKKAL PANCHAYAT IN SHOLINGHUR BLOCK RANIPET DISTRICT
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per
Cement concretel:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering for sides and soffits including cost and conveyance of materials and all labour charges.
Cement concretel:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K SEKAR (BID ID -1491655)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.