Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74,400Accepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹99,600+₹25,200 (33.9%)Accepted-Finance | L2 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | ATTA MOHD L2 | RAJ SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Fencing renovation in comptt. .No. 3/bd, 44/B of Samba Forest Range as per requirement of Forest Department.(Detail of compartemnt wise quantity as per e-nit) | 1,600 | Rft | 40 ₹64,000 | 18 ₹28,800 Lowest |
| 2.00 | Planting of Polybag Plants in Pits :Transportation of saplings from Balode Nursery, site clearance, digging of pits of 45cmx 45cmx 45cm including excavation of soil and planting of saplings/seedlings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of one month including all carriage upto site of closure, loading, unloading. | 2,000 | Nos | 15 ₹30,000 Lowest | 20 ₹40,000 |
| 3.00 | Grass slips in patches ( The rates include the cost of grass slips, carriage charges upto site and planting charges.) | 1,400 | Nos | 4 ₹5,600 Lowest | 4 ₹5,600 Lowest |
Tender Value
₹1.1 L
EMD Value
₹2,192
Closing Date
7 Aug 2025, 6:00 pmClosed
DFO Samba
Mansar Morh Samba
see enit
2025_FD_281465_3
13 of 2025
Open Tender
Civil Works
Item Rate
20 days
co.3bd, 44bd of Samba Forest Range
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO Samba
₹2,192
8 Aug 2025
2 Aug 2025
8 Aug 2025
2 Aug 2025
7 Aug 2025
2 Aug 2025
Amount
Fencing renovation in comptt. .No. 3/bd, 44/B of Samba Forest Range as per requirement of Forest Department.(Detail of compartemnt wise quantity as per e-nit)
Planting of Polybag Plants in Pits :Transportation of saplings from Balode Nursery, site clearance, digging of pits of 45cmx 45cmx 45cm including excavation of soil and planting of saplings/seedlings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of one month including all carriage upto site of closure, loading, unloading.
Grass slips in patches ( The rates include the cost of grass slips, carriage charges upto site and planting charges.)
ATTA MOHD (BID ID -2434641)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .