Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC Lowest Quoted bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Documents not found in order |
| 3 | Rejected-Technical | - | - | Rejected-Technical Documents not found in order |
| 4 | Rejected-Technical DR R P ROAD NOVAMILAN PATH HOUSE NO 17 HOUSE NO 22A GUWAHATI P O ASSAM SACHIBALAYA P S DISPUR DISTRICT KAMRUP METRO PIN 781006 | KAMRUP METRO | ASSAM | 781006 | - | - | Rejected-Technical Documents not found in order |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
7 Feb 2025, 12:00 pmClosed
CHD, Irrigation, BTC Kokrajhar
o/o the Addl CE cum CHD, Irrigation, BTC Kokrajhar
Construction of R.C.C Canal, Box Culvert, Earthen Canal Including Protection Work of No.1 Bengtal FIS under SOPD-BTC for the year 2024-25
2025_BoTC_42356_2
ACE/CHDI/10/2025/1
Open Tender
Civil Works
Works
90 days
Bijni
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹3.0 L
Yes
11 Mar 2025
27 Jan 2025
8 Feb 2025
27 Jan 2025
7 Feb 2025
27 Jan 2025
Amount
Downstream Left Side Box Culvert at No. 1 Bengtal FIS (As per sub Estimate - 1) Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m)
Collection of gravels including stacking at suitable place at quarry site free from dust, dirt and other foreign impurities paying forest royalty etc. complete.
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
Carriage of sand, gravel boulder etc by truck including loading unloading and stacking in measurable stacks etc. complete as directed ( Rate for 1ST KM)
Cement Concrete work in proportion 1: 4: 8 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (ii)With shuttering & without Dewatering
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. work as directed complete. (measurement to be taken on the face area timbered) a) Shuttering Beam (Fitting and dismantling) with prop.
Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mmto 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed.(Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles , (ii)With shuttering & without Dewatering
12mm thick cement plastering including clearing surfaces and curing etc. complete as directed. ii) In Prop. 1:4
Earth work in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 Km. including paying compensation of earth obtained from private land if any, loading, unloading and stacking in measurable stacks not more than 1m height, spreading the same in 15 cm thick including clearing light jungles, removing trees up to 15cm dia uprooting roots and stumps etc. from the seat of embankment, profiling with all lift complete as directed. (Payment will be made after 12.5% shrinkage allowances from the gross quantity.)
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed. A) With ordinary Soil
Construction of 1.50 M x 1.00 M rectangular boulder sausage including supplying of materials with 25 cm to 30 cm size boulders collecting from a lead of 25 KM encased in 15 cm mesh of 8G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18 cm in size tied with 8G galvanized tying wire at 30 cm apart, laid in position as directed including necessary local carriage of materials, paying necessary forest royalty including providing 1 (one) no. of jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.20 M apart driven at least 0.60 M below ground and tying with sausage etc, all complete as directed. (ii) With river boulder
Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and complete as directed
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For Normal Road upto 25.00 KM. (i) Without Contractor's Profit & GST
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed.
Extension of Left Side Earthen Canal at No. 1 Bengtal FIS (As per sub Estimate - 2) Earth work in filling in marginal bund/ Guide bund/ Afflux bund/ Canal embankment etc. in the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungles, removing trees up to 15cm dia and uprooting roots and stumps from the seat of the embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, dressing, watering and roughening the seat of the embankment before throwing earth, profiling etc., paying compensation of earth borrowed from private land or forest land if any, lead up to 30m and lift up to 1.5m, complete as directed.
Earth work in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 Km. including paying compensation of earth obtained from private land if any, loading, unloading and stacking in measurable stacks not more than 1m height, spreading the same in 15 cm thick including clearing light jungles, removing trees up to 15cm dia uprooting roots and stumps etc. from the seat of embankment, profiling with all lift complete as directed. (Payment will be made after 12.5% shrinkage allowances from the gross quantity.)
Extension of Right Side R.C.C Canal Work at No. 1 Bengtal FIS (As per sub Estimate - 3) Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m)
Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directed. (A) In ordinary Soil
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) Distance of work site from quarry @ 50 Km
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A River Singles (ii) With Shuttering with out dewatering
Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mmto 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed.(Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A River Singles (ii)With shuttering & without Dewatering
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Earth work in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 Km. including paying compensation of earth obtained from private land if any, loading, unloading and stacking in measurable stacks not more than 1m height, spreading the same in 15 cm thick including clearing light jungles, removing trees up to 15cm dia uprooting roots and stumps etc. from the seat of embankment, profiling with all lift complete as directed. (Payment will be made after 12.5% shrinkage allowances from the gross quantity.)
Upstream Embankment Left Side Protection Work at No. 1 Bengtal FIS (As per sub Estimate - 4) Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed. A) With ordinary Soil
Construction of 1.50 M x 1.00 M rectangular boulder sausage including supplying of materials with 25 cm to 30 cm size boulders collecting from a lead of 25 KM encased in 15 cm mesh of 8G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18 cm in size tied with 8G galvanized tying wire at 30 cm apart, laid in position as directed including necessary local carriage of materials, paying necessary forest royalty including providing 1 (one) no. of jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.20 M apart driven at least 0.60 M below ground and tying with sausage etc, all complete as directed. (ii) With river boulder
Extension of Left Bank R.C.C Main Canal of No. 1 Bengtal FIS (As per sub Estimate - 5) Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m)
Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directed. (A) In ordinary Soil
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) Distance of work site from quarry @ 50 Km
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A River Singles (ii) With Shuttering with out dewatering
Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mmto 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed.(Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A River Singles (ii)With shuttering & without Dewatering
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Earth work in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 Km. including paying compensation of earth obtained from private land if any, loading, unloading and stacking in measurable stacks not more than 1m height, spreading the same in 15 cm thick including clearing light jungles, removing trees up to 15cm dia uprooting roots and stumps etc. from the seat of embankment, profiling with all lift complete as directed. (Payment will be made after 12.5% shrinkage allowances from the gross quantity.)
Protection Work at Upstream Afflux Bund at No. 1 Bengtal FIS (As per sub Estimate - 6) Earthwork in excavation in irrigation canal to the design section and grade by depositing the spoils in the form ofembankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment with a lead upto 30 M and lift upto 1.50 M, complete as directed. A) In ordinary Soil
Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and complete as directed.
Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.50 M, complete as
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Plain CC work in 40% plum hard blasted boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size stone aggregate including curing, shuttering etc, complete as directed. (Shuttering cost will be paid separately).
Earth work in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 Km. including paying compensation of earth obtained from private land if any, loading, unloading and stacking in measurable stacks not more than 1m height, spreading the same in 15 cm thick including clearing light jungles, removing trees up to 15cm dia uprooting roots and stumps etc. from the seat of embankment, profiling with all lift complete as directed. (Payment will be made after 12.5% shrinkage allowances from the gross quantity.)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .