Loading…
Loading…
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
9 Jun 2026, 6:00 pm3d left
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_311350_3
e-NIT No. 12 REW UDHAMPUR of 2026-27 Dated 02-06-2026
Open Tender
Civil Works
90 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹8,000
2 Jun 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
9 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 14.94 | cum | 479.3 | ₹7,160.74 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.06 | cum | 4,826.2 | ₹5,115.77 |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5.03 | cum | 5,733.6 | ₹28,840.01 |
| 4 | Dumping of stones incluiding all leds lifts and carriages complete | 1.38 | cum | 937.9 | ₹1,294.3 |
| 5 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in:1cement : 6 coarse sand mortar. | 10.88 | cum | 9,027.2 | ₹98,215.94 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 2 coarse sand : 4 graded stone aggregates 20mm nominal size. | 2.35 | cum | 9,821.85 | ₹23,081.35 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 231.16 | KG | 123.2 | ₹28,478.91 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:
foundation and footing | 10.04 | sqm | 286.35 | ₹2,874.95 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:
suspended floor | 17.1 | sqm | 718.2 | ₹12,281.22 |
| 10 | Centering and shuttering including strutting,propping etc. and removal of form work for: edgs of Slabs | 17.38 | sqm | 262.2 | ₹4,557.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_1008188.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid