| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | -8.00% | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 CrAdmitted-Finance | -7.56% | ₹1.4 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Registration out of zone |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
8 Jun 2026, 6:00 pmClosed
Superintending Engineer, PWD Circle, Tonk
Superintending Engineer, PWD Circle, Tonk
Construction of Atal Pragati Path from Tejaji Chowk to Soda Darwaja in Gram Panchayat Lawa
2026_CEPWD_559873_1
NIT 01/2026-27 PWD CIRCLE TONK
Open Tender
Civil Works
150 days
Tonk
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Through online EGras Challan Office ID 23029
₹2.9 L
Yes
29 Jun 2026
18 May 2026
9 Jun 2026
18 May 2026
8 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART 'A' : ROAD WORK & C.C. PAVEMENT | |||||
| 2 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 1,809 | P.Cum | 515 | ₹9,31,635 |
| 3 | Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300-1 and 300-2 for subgrade construction as per MoRTH Specification Clause 305.3.4 | 2,010 | P.Cum | 28 | ₹56,280 |
| 4 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For Grading-I Material | 1,134 | P.Cum | 773 | ₹8,76,582 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. By Mechanical Means with a lead of 1 Km | 723.6 | P.Cum | 1,044 | ₹7,55,438.4 |
| 6 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.5 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately) | 1,452.16 | P.Cum | 4,811 | ₹69,86,341.76 |
| 7PART 'B' : DRAIN WORK | |||||
| 8 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | 3,802.5 | P.Cum | 137 | ₹5,20,942.5 |
| 9 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 Nominal mix 1:3:6 | 225 | P.Cum | 2,584 | ₹5,81,400 |
| 10 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C. grade M 20 Nominal mix (1:2:4) | 686.25 | P.Cum | 2,927 | ₹20,08,653.75 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.25 MB
Tendernotice_2.pdf
PDF • 1.45 MB
Tendernotice_3.pdf
PDF • 14.98 MB
BOQ_996668.xls
BOQ • 0.35 MB
Tender_docs_lawa.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid