Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-Finance | ₹12.0 L | L1 | Accepted-Finance Rate as per BSR |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
12 Aug 2026, 1:00 pmClosed
VDO GP Khiyera
GP Khiyera
Sewer Line nirmaan kary main Guwaad se harjiram meghwal ke ghar se kishan regar ki dukaan ki or Khiyera
2026_PRD_584220_1
278-280/2026/Khiyera
Open Tender
Miscellaneous Works
Percentage
180 days
as per tender document
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Sarpanch GP Khiyera, MD RISL
₹24,000
Yes
21 Aug 2026
7 Aug 2026
12 Aug 2026
7 Aug 2026
12 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | work detial | - | - | - | - |
| 1.01 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus
soil with in a | 757.8 | cum | 178.46 | ₹1,35,236.99 |
| 1.02 | Work of laying/installing a single row of RCC (Reinforced Cement Concrete) NP3 Hume pipes—including collars—in a 1:2 cement mortar bed, ensuring the required slope for culvert construction (excluding earthwork,
concrete, and masonry work). ( dia | 421 | Mtr. | 2,265.41 | ₹9,53,737.61 |
| 1.03 | Stone/Ballast (crushed stone) 40 mm
nominal size crushed stone aggregate at the work site. | 21.05 | cum | 1,225 | ₹25,786.25 |
| 1.04 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus
soil with in a | 15.55 | cum | 178.46 | ₹2,775.05 |
| 1.05 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing
and compaction etc in 1:4:8 mix | 1.87 | cum | 3,531.8 | ₹6,604.47 |
| 1.06 | Brick work in foundation and plinth using
Ist | 10.57 | cum | 4,698.68 | ₹49,665.05 |
| 1.07 | 20mm thick plaster on new work including
curing and racking of joints in CM 1:4 | 35.36 | Sqm | 173.75 | ₹6,143.8 |
| 1.08 | chamber cover based on ruidp bsr less 10% | 11 | no. | 1,143 | ₹12,573 |
| 1.09 | Yojna board & Contingency charges | - | no. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.00 MB
Tendernotice_1.pdf
PDF • 3.11 MB
BOQ_1037587.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .