Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.2 LAccepted-Finance | ₹13.2 L | 1 | Accepted-Finance LOWEST BIDDER |
| 2 | 2₹14.5 L+₹1.2 L (9.37%)Accepted-Finance BLOCK D FIRST FLOOR COMMERCIAL COMPLEX KUNJ BIHARI AGRAWAL KORBA KORBA KORBA CHHATTISGARH 495677 | KORBA | CHHATTISGARH | 495677 | ₹14.5 L+₹1.2 L (9.37%) | 2 | Accepted-Finance 2ND LOWEST BIDDER |
| 3 | 3₹16.1 L+₹2.8 L (21.3%)Accepted-Finance | ₹16.1 L+₹2.8 L (21.3%) | 3 | Accepted-Finance HIGHEST BIDDER |
| 4 | Rejected-Technical | - | - | Rejected-Technical PQC DISQUALIFIED |
| Sl No | Description | Qty | Unit | M/S R L ENGINEERING L3 | BRITISH INDIA TRADING COMPANY L2 | M/S THERMAL INDIA L1 |
|---|---|---|---|---|---|---|
| 1.00 | Alignment and surface preparation of mono rail and electric hoist of APH of unit 6 and 7 , Capacity- 2 Ton | 2 | Job | 13,252 ₹26,504 | 11,512 ₹23,024 | 10,745 ₹21,490 Lowest |
| 2.00 | Alignment and surface preparation of mono rail and electric hoist of ESP of unit 6 and 7 , Capacity- 3 Ton | 2 | Job | 9,443 ₹18,886 | 8,204 ₹16,408 | 7,657 ₹15,314 Lowest |
| 3.00 | Alignment and surface preparation of mono rail and electric hoist of CC Pump of unit 6 and 7 , Capacity- 5 Ton | 2 | Job | 14,024 ₹28,048 | 12,183 ₹24,366 | 11,370 ₹22,740 Lowest |
| 4.00 | Alignment and surface preparation of mono rail and electric hoist of ECO/ LTSH of unit 6 and 7 , Capacity- 6 Ton | 2 | Job | 15,808 ₹31,616 | 13,733 ₹27,466 | 12,817 ₹25,634 Lowest |
| 5.00 | Alignment and surface preparation of mono rail and electric hoist of SCAPH of unit 6 and 7 , Capacity- 7.5 Ton | 2 | Job | 11,687 ₹23,374 | 10,153 ₹20,306 | 9,476 ₹18,952 Lowest |
| 6.00 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of APH of unit 6 and 7 , Capacity- 2 Ton | 4 | Job | 7,827 ₹31,308 | 6,800 ₹27,200 | 6,346 ₹25,384 Lowest |
| 7.00 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of ESP of unit 6 and 7 , Capacity- 3 Ton | 4 | Job | 6,858 ₹27,432 | 5,958 ₹23,832 | 5,561 ₹22,244 Lowest |
| 8.00 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of CC Pump of unit 6 and 7 , Capacity- 5 Ton | 4 | Job | 7,870 ₹31,480 | 6,837 ₹27,348 | 6,381 ₹25,524 Lowest |
| 9.00 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of ECO/ LTSH of unit 6 and 7 , Capacity- 6 Ton | 4 | Job | 7,870 ₹31,480 | 6,837 ₹27,348 | 6,381 ₹25,524 Lowest |
| 10.00 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of SCAPH of unit 6 and 7 , Capacity- 7.5 Ton | 4 | Job | 7,870 ₹31,480 | 6,837 ₹27,348 | 6,381 ₹25,524 Lowest |
Tender Value
₹13.0 L
EMD Value
₹14,000
Closing Date
17 Aug 2026, 6:00 pmClosed
SE OMC2 DTPS
OFFICE OF THE SE OMC2 DTPS
Routine and Preventive Breakdown Maintenance of all Mech. parts of Mono-Rail Electric hoist (01 to 10 Ton Capacity) of APH, ESP, SCAPH, CCP, Economizer /LTSH maintenance platform along with the Sky climber
2026_RVUNL_1139028_2
T04-ANP/D/OMC2/BMD1
Open Tender
Power/Energy Projects/Products
Fixed-rate
730 days
ANPARA
TENDER COST AND EARNEST MONEY
2 documents required · 2 mandatory
₹1,180
Dy. GM (F), Construction Unit, CFA BO,DTPS,Anpara
₹14,000
13 Sept 2026
6 Aug 2026
18 Aug 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Alignment and surface preparation of mono rail and electric hoist of APH of unit 6 and 7 , Capacity- 2 Ton | 2 | Job | 1.25 | ₹2.5 |
| 2 | Alignment and surface preparation of mono rail and electric hoist of ESP of unit 6 and 7 , Capacity- 3 Ton | 2 | Job | - | - |
| 3 | Alignment and surface preparation of mono rail and electric hoist of CC Pump of unit 6 and 7 , Capacity- 5 Ton | 2 | Job | -1.25 | - |
| 4 | Alignment and surface preparation of mono rail and electric hoist of ECO/ LTSH of unit 6 and 7 , Capacity- 6 Ton | 2 | Job | -2.5 | - |
| 5 | Alignment and surface preparation of mono rail and electric hoist of SCAPH of unit 6 and 7 , Capacity- 7.5 Ton | 2 | Job | -3.75 | - |
| 6 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of APH of unit 6 and 7 , Capacity- 2 Ton | 4 | Job | -5 | - |
| 7 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of ESP of unit 6 and 7 , Capacity- 3 Ton | 4 | Job | -6.25 | - |
| 8 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of CC Pump of unit 6 and 7 , Capacity- 5 Ton | 4 | Job | -7.5 | - |
| 9 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of ECO/ LTSH of unit 6 and 7 , Capacity- 6 Ton | 4 | Job | -8.75 | - |
| 10 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of SCAPH of unit 6 and 7 , Capacity- 7.5 Ton | 4 | Job | -10 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
tdoc.pdf
Tender Documents • 4.78 MB
BOQ_2207967.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .