Water Tank with allied work in Govt Lower High School Wno 2 Pyt Bain Bajalta Block Nagrota for the year 2026-2027 under head DDC Block Level
2026_RDPR_323789_4
e-NIT No. 519 REWJ of 2026-27 dated 09-09-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹2,060
9 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | 2.1 | cum | 479.3 | ₹1,006.53 |
| 2 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 0.91 | cum | 4,826.5 | ₹4,392.12 |
| 3 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 1.63 | cum | 5,733.6 | ₹9,345.77 |
| 4 | SUPPLY of stone | 0.41 | CUM | 937.6 | ₹384.42 |
| 5 | Brick Masonary with bricks of class designation 75 in superstructure mix 1:6 | 3.19 | cum | 7,571.55 | ₹24,153.24 |
| 6 | Providing and Laying c.concrete M20 using 20mm s.aggregate for RCC Slab. | 1.87 | cum | 7,788.4 | ₹14,564.31 |
| 7 | Providing Tor steel including bending,cutting,straightening & placing etc. | 117.6 | KG | 123.2 | ₹14,488.32 |
| 8 | Centering and shuttering including strutting,propping etc and removal of form work | 25.3 | cum | 286.35 | ₹7,244.66 |
| 9 | Sofit of slab | 4.55 | cum | 718.2 | ₹3,267.81 |
| 10 | Edges of slab | 41.46 | RMT | 262.2 | ₹10,870.81 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1090998.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .