Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-Finance GR 8 ADDA BUILDING 1ST FLOOR CITY CENTRE DURGAPUR 16 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | L1 | Accepted-Finance Quoting Lowest rate | |
| 2 | L2₹11.7 L+₹12,120 (1.05%)Rejected-Finance MAIRAKATA P O GARBETA DIST PASCHIM MEDINIPUR 721127 | GARBETA | PASCHIM MEDINIPUR | WEST BENGAL | 721127 | L2 | Rejected-Finance Quoting Higher rate | |
| 3 | L3₹12.8 L+₹1.2 L (10.1%)Rejected-Finance | L3 | Rejected-Finance Quoting Higher rate |
Tender Value
Refer Docs
EMD Value
₹24,230
Closing Date
12 Dec 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sr.Superintending Engineer
Office of the Sr. Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Annual Maintenance of Electrical Installation by engaging manpower at Newly constructed collectorate complex at Kalyanpur, Asansol in the district of Paschim Bardhaman (For 1year).
2025_WBPWD_951331_1
WBPWD/SSEWEC /AED /NIQ-29 /2025-26
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Asansol
Please refer Tender documents.
5 documents required · 5 mandatory
₹24,230
Office of the Sr. Superintending Engineer, Western
17 Dec 2025
17 Nov 2025
15 Dec 2025
17 Nov 2025
12 Dec 2025
26 Nov 2025
17 Nov 2025 - 20 Nov 2025
20 Nov 2025
Amount
Total day to day E.I maintanance (Indoor & Outdoor), Lift operation, AC operation,DG operation at newly constructed collectorate complex : First Shift (9AM to 5PM) Office Hour incl. sat,sunday and Holidays if requred…..Reliever staffs must be arranged by the Agency if required. (i) High Skilled Workman: 01 Man for 12 month. (Having atleast I(b), II, III, ITI/equivalent preferred Electrical/ workman's permit from licencing board): (Rate As per Min wages vide order no-24/stat/14/RW/24/2023/LCS/JLC, dt:17/06/2025 of Additional Labour Commissioner,West Bengal ).
(ii)Skilled Workman: 01 Man for 12 month.(Having atleast I(b) & II, DOE WB) Electrical workman's permit from licencing board): (Rate As per Min wages vide order no-24/stat/14/RW/24/2023/LCS/JLC, dt:17/06/2025 of Additional Labour Commissioner,West Bengal ).
iii) Two (02) Helper (Unskilled) for 12 month Electrical workman's permit from licencing board): (Rate As per Min wages vide order no-24/stat/14/RW/24/2023/LCS/JLC, dt:17/06/2025 of Additional Labour Commissioner,West Bengal ).
SCOPE OF WORK FOR ANNUAL MAINTENANCE OF ELECTRICAL INSTALLATION WORKS 1. Purpose of Maintenance The objective of preventive and corrective maintenance is to minimize electrical faults/breakdowns, prevent fire hazards due to electrical short circuits, and reduce downtime. Any incident such as fire due to electrical fault, falling of ceiling fans, luminaries, etc. because of lack of maintenance will be treated as serious negligence, and the agency will be held responsible. 2. Scope of Electrical Maintenance The agency shall undertake routine, preventive, and corrective maintenance of all electrical installations within the premises, including but not limited to: • LT Switchgear, LT cables, transformer (if any), main distribution panel, sub-panels, wiring, and distribution cables. • Power outlets for all air-conditioning systems. • Operation, configuration, repair/replacement of AC timers, compound light timers, glow signs, metal sign boards. • Electrical installation/distribution up to switchboard/panel of lift machine room, pump room/kiosk of water supply system. • Compound lighting, earthing attachments, and fixtures for the entire campus.
3. Manpower Deployment • Agency must deploy 3 nos. semi-skilled electricians (valid Works Permit-I(b) & II, DOE WB) and 1 no. skilled electrician (with valid Electrical/Workman Permit Part-I(b), II, III, ITI/equivalent preferred). • All staff must be permanent residents of West Bengal with voter IDs. • All staff must wear uniforms (navy blue trouser + sky blue shirt with PWD logo) and carry photo identity cards issued by the agency. • No maintenance staff shall work in more than two consecutive shifts. 4. Inspection, Cleaning & Upkeep • Regular cleaning/checking of all fittings, fixtures, panels, TPN/SPN DBs, SFUs, compound lights, etc., as directed by EIC. • Cleaning and minor repairs of light fittings, ceiling fans, exhaust fans, etc., except rewinding. • Mandatory inspection of ceiling fans once every three months for split pin, jam nut, etc. • Split pins once removed must not be reused. Agency must supply split pins and jam nuts at own cost. • Building Fan Register to be maintained with signatures of attending electrician, JE, and AE.
5. Measurement and Testing Monthly testing and recording in logbooks for: • Current, voltage, temperature (using infrared thermometer). • Insulation resistance, earth resistance, etc. • Thermal image printouts (with date & time) must be submitted to JE/AE. • Abnormal readings must be rectified immediately and re-measured. 6. Operation Responsibilities • Switching ON/OFF of corridor, staircase, compound lighting, AC machines, lights, fans, etc. • Cleaning of sub-station rooms, LT panel rooms, LT panels, switches, DBs. • Operation of HT switchgear and resetting of protective relays. • Lift rescue operations and all AC operations during duty hours.
7. Attendance & Supervision • Agency responsible for supervision, maintenance of logbooks, and attendance monitoring. • Attendance register to be maintained shift-wise and verified by JE. • Duty roster to be submitted monthly. • One dedicated smartphone must be provided by agency for the call centre. 8. Staff Availability • Absence of staff must be replaced within 1 hour, failing which pro-rata deduction will be made. • Staff must respond promptly to phone calls. • Any staff found irregular/unfit must be withdrawn. 9. Tools & Tackles Agency must provide at its own cost: • 500V/1kV Megger, Digital Multimeter, Earth Tester. • Crimping machine, screwdrivers, pliers, socket sets, line tester, insulating tape, fuse wire, nuts/bolts, washers, cleaning materials, split pins, etc. • Staff must be trained to operate thermal imaging scanner.
10. Safety & Vigilance • Continuous monitoring for heating, sparking, discoloration, burning smell, overload, loose termination, unbalanced loads, etc. • In case of power failure, coordinate with WBSEDCL and operate internal switching arrangement to maintain supply at critical points. 11. Preventive & Corrective Maintenance • Routine checking must be performed and recorded, signed by JE/AE. • Materials such as lamps, SFUs, DBs, cables, switches, fuses will be supplied by the Department against proper requisition. • Auxiliary items (fuse wires, screws, split pins, tapes, dusters, etc.) must be supplied by agency. • Dismantled/unserviceable materials must be deposited to the Section Office; no materials to be removed without challan. 12. Emergency and Breakdown Response • All faults must be detected, attended, and rectified immediately. • Temporary restoration arrangements must be made at agency’s cost if required. • All breakdown details must be recorded in the logbook. • Major faults must be communicated to JE/AE immediately (written + phone).
13. Damage Liability • Agency is responsible for damages due to mishandling/operational error by its staff. • Repair/replacement must be completed within EIC-specified timeframe, failing which cost will be recovered from agency bills. 14. Documentation • Logbooks (Preventive, Corrective, Fan Register) must be updated daily and available at call centre. • Photocopies of logbooks and attendance must accompany bills. 15. Wages & Statutory Compliance • Minimum wages (as per Labour Act) including PF, ESI must be paid. • Monthly PF/ESI payment receipts must accompany the bill. • Bills may be withheld if statutory compliance is not proved. 16. Billing & Payment Procedure • Bills to be submitted quarterly with JE/AE certification. • GST & LWC will be deducted as per rules. • Pre-receipted monthly bills with ESI, EPF, P Tax challans and returns must be submitted.
17. Conduct, Discipline & Safety • Staff must be polite; unruly behaviour will result in removal/legal action. • Fire-fighting readiness is mandatory for all staff. • Agency responsible for safety gear (shoes, helmet, raincoat, torch, umbrella, gumboots, etc.). • Agency not responsible for damage due to natural calamities (fire, earthquake, flood, etc.) if not caused by negligence. 18. Special Conditions • High alertness required during Puja vacation; staff must be available on mobile. • Any on-going/upcoming project within campus will fall under this maintenance contract. • EIC may modify/alter terms in the interest of public service. • DG set operation may be required without extra payment. 19. Termination • Contract may be terminated with 1-month notice from either side. • Non-compliance may lead to penalty, deduction, or immediate termination without notice.
R.K.ENTERPRISE (BID ID -7535962)
DELTA BROTHERS (BID ID -7492471)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 17.48 MB
new2911.pdf
Tender Documents • 0.51 MB
BOQ_2274264.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .