Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LQualified SF NO 421 1B PALLADAM DOOR NO 3 166J CHINNIYAGOUNDAMPALAYAM 2A PREMIER BUILDING VILLAGE TOWN PALLADAM VILLAGE CITY PALLADAM | ₹11.6 L | L1 | Qualified MSE, Category: General |
| 2 | L2₹12.8 L+₹1.3 L (10.8%)Not Evaluated 1 9 383 4 KUSHAIGUDA SRICHAKRA PIPES ECIL POST KUSHAIGUDA HYDERABAD TELANGANA 500062 | MEDCHAL MALKAJGIRI | TELANGANA | 500062 | ₹12.8 L+₹1.3 L (10.8%) | L2 | Not Evaluated Category: General |
| 3 | L3₹13.3 L+₹1.7 L (14.5%)Not Evaluated 16 N S ROAD 2ND FLOOR BHANDARI BROTHERS BUILDING KOLKATA KOLKATA WEST BENGAL 700001 | KOLKATA | WEST BENGAL | 700001 | ₹13.3 L+₹1.7 L (14.5%) | L3 | Not Evaluated Category: General |
| 4 | L4₹13.4 L+₹1.8 L (15.8%)Not Evaluated 2 1 2ND FLOOR J J HEIGHTS J J HEIGHTS R ROAD PRABHUJI BUILDING NEAR GANGTORI COMPLEX EAST SINGHBHUM JHARKHAND 831001 | EAST SINGHBUM | JHARKHAND | 831001 | ₹13.4 L+₹1.8 L (15.8%) | L4 | Not Evaluated Category: General |
| 5 | L5₹13.4 L+₹1.9 L (16.1%)Not Evaluated 121 7 MUDIGERE KASABA HOBLI GUBBI TUMKUR KARNATAKA 572216 | TUMAKURU | KARNATAKA | 572216 | ₹13.4 L+₹1.9 L (16.1%) | L5 | Not Evaluated Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
27 Nov 2025, 10:00 amClosed
Polyethylene Pipes for Water Supply conforming to IS 4984 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6881901 Dated : 12-11-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
8578050
GEM/2025/B/6881901
Single Packet Bid
Polyethylene Pipes for Water Supply conforming to IS 4984 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
45 days
636005, Office of the Senior Section Engineer Electrical Works Southern Railway Salem SALEM
Total value wise evaluation
PRODUCT
2 documents required · 2 mandatory
Exempted
12 Nov 2025
12 Nov 2025
27 Nov 2025
Polyethylene Pipes for Water Supply conforming to IS 4984 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6881901 Dated : 12-11-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8578050.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .