GEMC-511687762471435
Awarded to VARINDER KUMAR BANSAL CONTRACTOR
₹43.8 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| 1 | CENTRAL LAB General Cleaning of Lab shelves, benches, working tables, reagent bottles, glass wares and instruments etc . | HSN not specified by seller | 365 days | 1,369.2 | 499,758 |
| 2 | To carry samples from various plants and sites like cooling towers , stores, coal handling area , effluent drains, urea silo, effluent ponds, ash ponds, water ponds, sub soil water, lube oil, petrol, diesel etc. | HSN not specified by seller | 365 days | 1,369.2 | 499,758 |
| 3a | Preparation of coal samples, grinding & sieving. | HSN not specified by seller | 700 each | 19.56 | 13,692 |
| 3b | Cutting & Testing of HDPE Bags ( 216) test specimensper lot) | HSN not specified by seller | 130 each | 48.9 | 6,357 |
| 3c | Preparation of scale samples by grinding etc. | HSN not specified by seller | 55 each | 48.9 | 2,689.5 |
| 4a | Shifting of HVS machines to Air Monitoring Station No.1, 2 & 3 for sampling etc. | HSN not specified by seller | 104 round | 58.68 | 6,102.72 |
| 4b | Shifting of Stack Monitoring Kit to SGP, CPP, Ammonia & Urea Prilling Tower etc. | HSN not specified by seller | 50 round | 68.46 | 3,423 |
| 4c | Assistance for work room study | HSN not specified by seller | 12 round | 33,252 | 399,024 |
| 4d | Assistance for boundary wall sampling | HSN not specified by seller | 104 round | 88.02 | 9,154.08 |
| 5 | Shifting of material like LPG, O2, H2, N2, and He cylinders, chemicals, Glassware, and instrument etc from stores to C.Lab/Plant Labs and vice versa. Weight per trip is up to 100 Kg Approx. Hand cart will be provided by NFL free of cost | HSN not specified by seller | 130 round | 28.36 | 3,686.8 |
| 6 | Shifting of instruments / equipments for repairs etc from Central Lab/ Plant Labs toInstrument,mechanical,electricalworkshop& Stores etc. and vice versa. Weight per trip is up to 100 Kg Approx. Hand cart will be provided by NFL free of cost | HSN not specified by seller | 50 round | 55.74 | 2,787 |
| 7 | To deliver dak /documents etc. from Central lab to Plant labs and various departments/stores etc and vice versa. | HSN not specified by seller | 300 days | 1,173.6 | 352,080 |
| 8 | PLANT LABS To carry samples like Raw material, Cooling water , effluent , oil & various water & gas samples etc from AFCP, SGP, CPP, DM , Urea , ETP plants and stores etc to Central Lab , Ammonia Lab, Urea Lab, DM Lab etc and General Cleaning of Plant Labs shelves, benches, working tables, reagent bottles, glass wares and instruments etc in General shift, A,B and C shifts. | HSN not specified by seller | 1,464 man days | 1,271.4 | 1,861,329.6 |
| 9 | Supply of manpower (if required) for unforeseen jobs | HSN not specified by seller | 150 man days | 48.9 | 7,335 |
| 10 | Upkeep washroom peripheral central lab of floors and area of central lab | HSN not specified by seller | 365 man days | 978 | 356,970 |
| 11 | Cleaning Agrochemical floors, slabs of lab`s floors | HSN not specified by seller | 365 man days | 978 | 356,970 |