Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | ₹5.0 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 UDYAM UP 64 0001066 09DFQPR2451E1Z4 B R | SAHARANPUR | UTTAR PRADESH | 247001 | - | - | Rejected-Technical As per approved TCR |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per approved TCR |
| Sl No | Description | Qty | Unit | ELECTRO POWER INDUSTRIES L1 |
|---|---|---|---|---|
| 1.01 | Cost of Electrolyte copper strips for 1 limb primary coil | 166 | kg | 910 ₹1,51,060 |
| 1.02 | Cost of Electrolyte copper strips for 1 limb secondary coil | 135 | kg | 910 ₹1,22,850 |
| 1.03 | Reinsulation of new bare copper strips of primary and secondary coil by 4 layer manila paper | 301 | kg | 140 ₹42,140 |
| 1.04 | Dehydration and filtration of transformer oil to improve dielectric strength upto 60 kV BDV | 1,620 | ltr | 10 ₹16,200 |
| 1.05 | cost of brazing with supply of rupaton rod,oxygen,dA for brazing of all primary and secondary coil | 1 | LS | 8,000 ₹8,000 |
| 1.06 | Cost of insulating materials, varnishing, precompress paper board,oil duct, cotton tape, webbing tape, etc | 1 | LS | 20,000 ₹20,000 |
| 1.07 | reformation of coil primary and secondary | 1 | LS | 30,000 ₹30,000 |
| 1.08 | fitting of core channels, primary and seconadry coilsand winding into the transformer tank | 1 | LS | 30,000 ₹30,000 |
| 1.09 | providing neoprene gasket for all joints of each parts such as top cover, inspection cover,insulators cooling fins,etc | 1 | LS | 18,000 ₹18,000 |
| 1.10 | Painting the outer body of transformer by one coat of primer and two coats of metallic paints including supply of missing bolts, nuts,etc | 1 | LS | 5,000 ₹5,000 |
Tender Value
₹5.8 L
EMD Value
₹7,300
Closing Date
19 Dec 2025, 4:00 pmClosed
General Manager Satgram-Sripur Area
Office of the General Manager, Satgram-Sripur Area, PO-Devchandnagar, WestBengal-713332
Partial repairing/rewinding along with assembling and installation of 2.5 MVA 33/3.3 kV Andrew Yule and Co make Power transformer SI no 11318 in Satgram Project under Satgram-Sripur Area
2025_ECL_348840_1
ECL/SSA/GM/E M/E-NIT/2025-26/103 Dt 03.12.2025
Open Tender
Electrical and Maintenance Works
30 days
Satgram Project
Please refer Tender documents.
5 documents required · 5 mandatory
₹7,300
13 Jan 2026
8 Dec 2025
20 Dec 2025
8 Dec 2025
19 Dec 2025
8 Dec 2025
8 Dec 2025 - 12 Dec 2025
Amount
Cost of Electrolyte copper strips for 1 limb primary coil
Cost of Electrolyte copper strips for 1 limb secondary coil
Reinsulation of new bare copper strips of primary and secondary coil by 4 layer manila paper
Dehydration and filtration of transformer oil to improve dielectric strength upto 60 kV BDV
cost of brazing with supply of rupaton rod,oxygen,dA for brazing of all primary and secondary coil
Cost of insulating materials, varnishing, precompress paper board,oil duct, cotton tape, webbing tape, etc
reformation of coil primary and secondary
fitting of core channels, primary and seconadry coilsand winding into the transformer tank
providing neoprene gasket for all joints of each parts such as top cover, inspection cover,insulators cooling fins,etc
Painting the outer body of transformer by one coat of primer and two coats of metallic paints including supply of missing bolts, nuts,etc
Assembling and installation of 2.5 mVA ,33/3.3 kV power transformer at site which includes placement of transformer, pre commissioning, testing and energizing
Supply and installation of wti and oti interconnection with trip and alarm circuit of primary control of 33 kv cr panel for 2.5 mva,33/3.3 kv power transformer
dismantling and refitting of core and winding,cooling fins,conservator tank, etc
supply and laying of 2.5 sqmm X 7 core 1100 V grade armoured control cable including end termination
supply and installation of new bucholz relay of appropriate size suitable for 2.5 mva,33/3.3 kv power transformer
Transportation cost up and down
hiring of crane for unloading of transformer from its basement at height 6ft from ground level and lifting and placement of transformer after necessary rewinding and repairing
Less Old Unused Scrap Value
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.07 MB
Tendernotice_2.pdf
PDF • 0.82 MB
BOQ_361581.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid