| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.3 LAdmitted-Finance | -5.99% | ₹26.3 L | L1 | Admitted-Finance |
| 2 | L2₹27.4 L+₹1.1 L (4.25%)Admitted-Finance | -1.99% | ₹27.4 L+₹1.1 L (4.25%) | L2 | Admitted-Finance |
| 3 | L3₹27.7 L+₹1.4 L (5.32%)Admitted-Finance B 1250 GALI NO 3 NEAR TINU PUBLIC SCHOOL SANGAM VIHAR SOUTH DELHI NEW DELHI 110080 | SOUTH DELHI | DELHI | 110080 | -0.99% | ₹27.7 L+₹1.4 L (5.32%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
Tender Value
₹28.0 L
EMD Value
₹55,981
Closing Date
10 Apr 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
SPD-2 DDA VASANT KUNJ NEW DELHI-70
Repair and maintenance of boundary wall of DDA vacant land under NA-II.Sub Head- Hiring of equipment and manpower for demolishing / making uninhabitable of existing Jhuggies at Navjeevan Camp at Kalkaji Extension.
2026_DDA_904531_1
01 /EE/SPD-2/DDA/2026-27
Open Tender
Civil Works
Percentage
365 days
SPD-2 DDA VASANT KUNJ NEW DELHI-70
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹55,981
8 May 2026
6 Apr 2026
10 Apr 2026
6 Apr 2026
10 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of equipment, manpower, and transport on hire for demolition programme whenever required in Navjiwan Camp, Govindpuri. The hire charges shall include cost of service of operating staff, lubricating oil, fuel (diesel/petrol/kerosene), other consumables required for running the plant and machinery, and all applicable taxes. The hire charges of plant and machinery shall be on a per day basis for a single shift of 8 (eight) hours. All labour deployed shall be in proper uniform as directed by the Engineer-in-Charge. Labour with hammer (Demolition programme carried out successfully/ not carried out successfully) | 1,800 | each | 1,036.39 | ₹18,65,502 |
| 2 | Pneaumetic hammer with operator, power etc including Air compressor 250 cfm. | 180 | per day | 3,908.15 | ₹7,03,467 |
| 3 | Steel reinforcement cutting machine including operator and power etc. | 45 | per day | 1,267.7 | ₹57,046.5 |
| 4 | Diesel truck 9 tonne (with POL) for local shifting | 25 | per day | 6,197.6 | ₹1,54,940 |
| 5 | Ladder (15 feet) | 180 | per day | 149.3 | ₹26,874 |
| 6 | Providing and fixing Scaffolding net of required width made of high-density Polyethylene UV stabilized knitted on warp knitting machines having density 100grams/sqm and shading coefficient minimum 75% around the construction site/ for vertical extension as per requirement including fastening/tying with building/scaffolding pipes or with any other fixtures etc. complete as per direction of Engineer-in-Charge. (One-time payment shall be made for providing scaffolding net from start of work till completion of work including shifting if any. The Scaffolding net shall be the property of the contractor on completion of the work) | 187.5 | Sqm | 29.25 | ₹5,484.38 |
| 7 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | 187.5 | sqm | 338.25 | ₹63,421.88 |
| 8 | Correction factor on all item of DSR 2023 on account of [email protected] | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
tender1.pdf
Tender Documents • 2.26 MB
BOQ_950743.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .