Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.4 CrAccepted-AOC AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | L-1 | Accepted-AOC Lottery Winner | |
| 2 | L-1₹11.4 CrRejected-AOC ACP HOUSE PLOT NO 994 1490 RAJARANI COLONY PO BJB NAGAR BHUBANESWAR DIST KHURDA 751014 | BHUBANESWAR | KHURDA | ODISHA | 751014 | L-1 | Rejected-AOC L-1 Bidder | |
| 3 | L-1₹11.4 CrRejected-AOC | L-1 | Rejected-AOC L-1 Bidder | |
| 4 | L-1₹11.4 CrRejected-AOC AT PO KUDIARY PS JATANI DIST KHURDA PIN 752050 | JATANI | KHURDA | ODISHA | 752050 | L-1 | Rejected-AOC L-1 Bidder | |
| 5 | L-1₹11.4 CrRejected-AOC AT KHARIAR PO KHARLAR DIST NUAPADA | L-1 | Rejected-AOC L-1 Bidder |
Tender Value
₹13.4 Cr
EMD Value
₹13.4 L
Closing Date
5 Aug 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief General Manager (Planning and Coordination)
Chief General Manager (Planning and Coordination), OIIDC, IDCO TOWERS, JANPATH, BHUBANESWAR-751022
Construction of proposed 4-lane Approach Road and 2-lane Internal Road along with CD Structure at Sahaspur Industrial Area in Khordha Dist., Odisha.
2025_IDCO_115809_1
PC/EST/E-28/2025-26
National Competitive Bid
Civil Works - Roads
Percentage
300 days
Sahaspur Industrial Area in Khordha Dist.
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹13.4 L
Yes
10 Apr 2026
21 Jul 2025
6 Aug 2025
21 Jul 2025
5 Aug 2025
21 Jul 2025
21 Jul 2025 - 2 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road Proper | |||||
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used. | 92,130 | Sqm | 8.45 | ₹7,78,498.5 |
| 3 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers. | 2,557 | Cum | 75 | ₹1,91,775 |
| 4 | Excavation in Ordinary Rock using Hydraulic Excavator CK-90 and Tippers with Disposal upto 1000 metres. | 284.1 | Cum | 90 | ₹25,569 |
| 5 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density. | 13,819.5 | Cum | 36 | ₹4,97,502 |
| 6 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 2,887 | Cum | 36 | ₹1,03,932 |
| 7 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 with filling of median. | 16,822 | Cum | 204 | ₹34,31,688 |
| 8 | Construction of Subgrade & Earthen shoulders with approved material obtained from borrowpits with all lifts & leads, transporting to site, spreading, grading to required slope & compacted to meet required to Table 300-2. | 34,605 | Cum | 755 | ₹2,61,26,775 |
| 9 | Construction of Granular Sub-base by providing of grading-VI material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the. | 11,063 | Cum | 2,592 | ₹2,86,75,296 |
| 10 | Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers. | 9,933 | Cum | 2,838.87 | ₹2,81,98,495.71 |
stage.html
html • 0.07 MB
technical_546696.pdf
techsummary_546696.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
DTCN.pdf
Tender Documents • 1.12 MB
BOQ_546696.xls
BOQ • 0.38 MB
BOQ.xls
BOQ • 0.38 MB
Tenderdocument.pdf
Tender Documents • 1.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .