Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.3 LAccepted-AOC 02 | ₹48.3 L Quoted ₹40.9 L | L1 | Accepted-AOC Work order issued |
| 2 | L2₹43.4 L+₹2.5 L (6.01%)Rejected-Finance 785 SNEH MARRIAGE HALL KE SAMNE BASHARATPUR SHAHPUR GORAKHPUR | ₹43.4 L+₹2.5 L (6.01%) | L2 | Rejected-Finance L2 |
| 3 | L3₹44.1 L+₹3.2 L (7.75%)Rejected-Finance 5000 14 304 VATUNDHARA ENCLAVE TARAMANDAL GAUSPUR | AMETHI | UTTAR PRADESH | 227405 | ₹44.1 L+₹3.2 L (7.75%) | L3 | Rejected-Finance L2 |
| 4 | L4₹45.3 L+₹4.3 L (10.6%)Rejected-Finance | ₹45.3 L+₹4.3 L (10.6%) | L4 | Rejected-Finance L4 |
| 5 | L5₹45.3 L+₹4.4 L (10.8%)Rejected-Finance | ₹45.3 L+₹4.4 L (10.8%) | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
13 Mar 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Construction of CC road in various streets of Jangal Sikri Mohalla Ram Avadh Nagar.
2026_DOLBU_1121219_1
CMNSY
Open Tender
Civil Works
Percentage
120 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Nagar Nigam Gorakhpur
₹1.2 L
13 Jul 2026
28 Feb 2026
14 Mar 2026
28 Feb 2026
13 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. T&P etc all complete . | - | Cum | 120 | - |
| 1.02 | E/w illing with cartage upto 10Km including etc. all complete of work. | - | Cum | - | - |
| 1.03 | P/L of base concrete in 1:4:8 with cement, L-Sand and 40mm S/B including mat. Lab. T&P,etc all complete. | - | Cum | 5,435 | - |
| 1.04 | RCC Work with cement concrete (1:1.5:3) including all completion of work. | - | Cum | - | - |
| 1.05 | M.S or iron work in renforcement cutting
bending , binding ,and placeing incl. etc. all. | 1 | qtl | 7,690 | ₹7,682.31 |
| 1.06 | P/L of 125 micron polythine including etc. all complete of work. | - | Sqm | - | - |
| 1.07 | S/Laying of GSB 53.-9.5 mm thick S/B upto 10Cm loose Layer including etc. all complete of work. | - | Cum | 3,134.25 | - |
| 1.08 | Consolidation of GSB upto 10 cm thick loose layer by Road Roller including etc. all.complete. | - | Cum | - | - |
| 1.09 | P/fixing of Road Barricating including etc. all complete of work. | - | Rmt | 118 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
aaa.pdf
Tender Documents • 0.69 MB
BOQ_2086093.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .