Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹11.9 L+₹2.2 L (22.3%)Accepted-Finance | L2 | Accepted-Finance Accepted |
Tender Value
Refer Docs
EMD Value
₹11,500
Closing Date
13 Aug 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 24 25 BM Dn Unit I Flue Gas Duct A pass Rectification of flue gas duct portions from APH outlet to before Mechanical hopper area during annual overhaul for the year 2024 25
2024_EB_464943_1
CE SE MI NCTPS I 132 24 25
Open Tender
Power/Energy Projects/Products
Works
20 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,500
Yes
4 Oct 2024
23 Jul 2024
14 Aug 2024
23 Jul 2024
13 Aug 2024
23 Jul 2024
Amount
MS Plate 8 mm thick, sail Hard / equivalent Including Loading, transportation & Unloading. Manufacture test certificate shall be furnished. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charge) (The materials will be supplied by TANGEDGO if available at stores during execution of works)
Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from APH outlet to before Mechanical hopper area. Including cost of consumables and T&P’s.
Charges for transporting of 8 mm M.S / Checkered plates from central stores to boiler area cutting into required size, leading, lifting, positioning on the eroded top portions of the duct wall after removal of wornout plates above 1.5 meter level and welding the same. Including cost of consumables and T&P’s. (The Required Iron & Steel material is under Contractor Scope)
Labour charges for welding eroded initial welding joints in the flue gas duct at APH outlet to before Mechanical hopper area. Including cost of consumables and T&P’s.
Charges for cutting and removal of heavily eroded flue gas duct plates (Multilayer) from the parent plate, transporting & devoluting scrap to Central Stores.
Charges for removing the existing eroded duct supports, supports for FG duct area and transporting of new pipes / Angles from Central Stores / NCTPS, cutting into required size leading, lifting, positioning and welding. Including cost of consumables and T&P’s. (The Required Materials will be supplied by TANGEDCO)
Charges for clearing the ash from Air pre heater hoppers and duct portion and disposals including cost of consumables such as gunny bags etc.
ATHMIKA ENTERPRISES (BID ID -1108513)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .