Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAccepted-AOC 118 SHIRGAL DHARGAL PERNEM GOA | NORTH GOA | GOA | 403001 | ₹18.8 L | L1 | Accepted-AOC Lowest Quote |
| 2 | L2₹18.8 L+₹178.92 (<0.01%)Rejected-Finance H NO 264 1 WARD NO 03 DEULWADA PALIEM PERNEM GOA | ₹18.8 L+₹178.92 (<0.01%) | L2 | Rejected-Finance Higher bid |
Tender Value
₹17.9 L
EMD Value
₹35,784
Closing Date
20 Apr 2026, 3:00 pmClosed
Executive Engineer
SPACES building 7th Floor Patto Plaza PANAJI GOA
Work of development beautification of existing crematorium at Marra of Bardez Taluka
2026_DRD_28597_1
DRDA-N/GGSY/TN/01/26-27/04/L4
Open Tender
Civil Works - Buildings
Percentage
Pilerne Marra
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹35,784
13 Jul 2026
9 Apr 2026
21 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | - | - | - | - |
| - | All kinds of soil | - | cu.m | - | - |
| - | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : | - | - | - | - |
| - | All kinds of soil | - | cu.m | - | - |
| 3Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete | |||||
| 4Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 4.01 | All works upto plinth level | - | cu.m | - | - |
| 5Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | |||||
| 6Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | |||||
| 6.01 | Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | - | cu.m | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_29037.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .